| 1 |
Special Repair for Teesta Riverbank Protection Works by Construction of Gabion Spur at Bardhang (Km 60+480), NH-10, under the Jurisdiction of PMU-Ranipool, NHIDCL, on Percentage Rate Contract Basis in the State of Sikkim
|
West Bengal |
17-08-2026 |
|
|
View Details |
| 2 |
Independent Engineer Services for “Development, maintenance, management and operation of Greenfield High-Speed Corridor of 164.3550 km (NH-6) from Mawlyngkhung (near Shillong) in Meghalaya to Panchgram (near Silchar) in Assam on Hybrid Annuity Mode”.
|
Meghalaya |
17-08-2026 |
|
|
View Details |
| 3 |
Consultancy services for preparation of Detailed Project Report and preconstruction activities in respect of construction of greenfield alignment/ widening of existing carriageway to 2 lane with paved shoulder configuration along with mitigation measures of vulnerable sinking / sliding zones of section for Dehradun-Nainital in the State of Uttarakhand (2nd Call)
|
Uttarakhand |
15-08-2026 |
|
2026_NHIDC_915380_1 |
View Details |
| 4 |
Short Term Maintenance Contract (STMC) on NH-717B for the section from Km 20.340 (Rongli Bazaar) to km 26.588 (Rongli Bypass End) and upgradation of existing road at Km 20.600 & Km 26.400 for length of 0.520 km & 0.554 Km of Rhenock- Menla spur under jurisdiction of PMU-Rhenock, NHIDCL on Percentage Rate Contract Basis for FY 2026-27 in the state of Sikkim
|
Sikkim |
11-08-2026 |
|
|
View Details |
| 5 |
Providing & supplying of vehicle 1 nos. on monthly basis for SO-Teesta under PMU - Siliguri, NHIDCL in the State of West Bengal
|
West Bengal |
07-08-2026 |
07-08-2026 |
|
View Details |
| 6 |
Widening and Up-gradation of existing carriageway into 2-lane with paved shoulder configuration from Rhenock (existing Km 0.000) to Rongli Bazaar (existing Km 15.300) along NH-717B in the State of Sikkim on EPC mode
|
Sikkim |
06-08-2026 |
|
|
View Details |
| 7 |
Widening and Up-gradation of existing carriageway into 2-lane with paved shoulder configuration from Rhenock (existing Km 0.000) to Rongli Bazaar (existing Km 15.300) along NH-717B in the State of Sikkim on EPC mode
|
|
06-08-2026 |
|
|
View Details |
| 8 |
Providing the Services of Vehicle on Monthly Basis to NHIDCL, Project Monitoring Unit-Ranipool (Sikkim)
|
Sikkim |
05-08-2026 |
|
|
View Details |
| 9 |
Performance Based Maintenance Contracts (PBMC) work of Rangpo Viaduct (Atal Setu) on Rangpo chu river between Km 51.10 to Km 53.90 on NH-10 in the State of West Bengal and Sikkim during FY 2026-27
|
West Bengal |
30-07-2026 |
|
|
View Details |
| 10 |
Maintenance of the existing road of the project “Improvement of existing road to 2 laning with Hard Shoulders of Maram- Peren section (Package-3, length- 34.494Km) from Design Chainage 75.000 Km to Km 109.434 on NH-129A in the State of Manipur on EPC mode.” at the risk & cost of the EPC Contractor
|
Manipur |
27-07-2026 |
|
|
View Details |