| 11 |
Hill Side Slope protection work at Kameda (386+550) in the work of "Construction & Upgradation of existing road to 2-lane with paved shoulder from Km 368.000 to Km. 399.000 of Lameri to Karanprayag (Excluding Km 379.100 to Km 380.275) of NH-07 in the State of Uttarakhand" under Risk & Cost of the EPC contractor.
|
Uttarakhand |
30-04-2026 |
30-04-2026 |
|
View Details |
| 12 |
Construction of 2-Lane with paved shoulder of Existing Intermediate Lane of NH-137G from Village near Pailapool at Design Ch. 0+00 (Ch. 20.800 of Silchar Jiribam Pkg-I, NH-37) to Village P.Songkai at Design Ch. 58+342 (Ch. 106+830 of Tamenglong- Mahur section of NH-137) near Hangrum (Length: 58.342 km) in the State of Assam under NH(O)-NE on Hybrid Annuity Mode
|
Assam |
28-04-2026 |
28-04-2026 |
|
View Details |
| 13 |
Consultancy services for preparation of Detailed Project Report and Pre-construction activities for Melli to Singtam section of NH-210 in the state of Sikkim
|
Sikkim |
27-04-2026 |
27-04-2026 |
|
View Details |
| 14 |
Balance work for rectification of damages caused to bituminous pavement and road side drain for laying of PHED pipelines in connection with the project work of “Construction of 2-lane specification road with paved shoulder including Tunnel (300 m) at Rabongla on NH-510 (Singtam-Tarku-Rabongla-Legship-Gyalshing) Package-III (Design Chainage from KM 32.500 to Km 33.600) under SARDP-NE Phase- ‘A’ on the EPC basis in the State of Sikkim”, under jurisdiction of PMU-Gyalshing, NHIDCL on Percentage Rate Contract Basis in the state of Sikkim- 3rd Call
|
Sikkim |
27-04-2026 |
|
|
View Details |
| 15 |
Improvement & Widening to two lane with paved shoulder of road from km 101.300 (Khowai) to km 236.213 (Harina) (Total length = 134.913 km) of NH-208 in the State of Tripura on Engineering Procurement & Construction (EPC) basis under Japan International Cooperation Agency (JICA) Official Development Assistance (ODA) Loan.
|
Tripura |
27-04-2026 |
27-04-2026 |
|
View Details |
| 16 |
Spot improvements and protection works on NH-10 during the FY 2026-27 on EPC Mode under NHIDCL in the state of West Bengal
|
West Bengal |
24-04-2026 |
24-04-2026 |
|
View Details |
| 17 |
Slope stabilization and protection works at CH Km 25.8 near Likhuveer of NH-10 during the FY 2026-27 on EPC Mode under NHIDCL in the state of West Bengal”
|
West Bengal |
22-04-2026 |
22-04-2026 |
|
View Details |
| 18 |
Slope stabilization and protection works at CH Km 40.05 near 7th Mile of NH-10 during the FY 2026-27 on EPC Mode under NHIDCL in the state of West Bengal
|
West Bengal |
22-04-2026 |
22-04-2026 |
|
View Details |
| 19 |
Slope stabilization and protection works at CH Km 49.50 near Bhotebhir of NH-10 during the FY 2026-27 on EPC Mode under NHIDCL in the state of West Bengal
|
West Bengal |
22-04-2026 |
22-04-2026 |
|
View Details |
| 20 |
Restoration works under “Specialized Repairs” through STMC for erosion control and slope protection at damaged stretches including landslips on various chainages on NH-08 section from Mungiakami to Champaknagar due to August 2024 floods, based on the assessment report of technical consultant NIT Agartala in the State of Tripura in the FY 2025-26 on percentage basis and work order basis.
|
Tripura |
16-04-2026 |
16-04-2026 |
|
View Details |