| Sr. No. | Descriptions | State | Bid Due Date Sort ascending | Bid Due Date - (Revised) | Tender ID | View Details |
|---|---|---|---|---|---|---|
| 61 | Short Term Maintenance Contract (STMC) for Maintenance & Repair of 2- Lane with hard shoulder of Changtongya-Longleng Road from Km 18+779 to Km 31+779 (Pkg-2) of NH-702 in the state of Nagaland for FY: 2026-27 (Percentage Rate and work Order Basis). | Nagaland | 15-05-2026 | View Details | ||
| 62 | BALANCE WORK OF STRENGTHENING OF UKHRUL TO CHOITHAR SECTION OF NH-202 FROM EXISTING KM 50+520 TO KM 59+236 (DESIGN CHAINAGE KM 45+600 TO KM 54+212) IN THE STATE OF MANIPUR ON EPC MODE UNDER NH(O)-NE (PACKAGE-4, LENGTH-8.612 KM) | Manipur | 15-05-2026 | 15-05-2026 | View Details | |
| 63 | Slope protection and landslide mitigation on NH-717A near Reshi border on EPC mode in the State of West Bengal during the FY 2026-2027 | West Bengal | 14-05-2026 | 14-05-2026 | View Details | |
| 64 | Performance based Maintenance Contract (PBMC) work for the Rhenock - Rorathang - Pakyong section of National Highway 717A (Ch. 0+000 to Ch. 26+706) in the state of Sikkim. | Sikkim | 11-05-2026 | 11-05-2026 | View Details | |
| 65 | Short Term Maintenance Contract for Restoration and Repair of Longleng-Yongmong Road from Km. 33.248 to Km. 52.780 Km [Length=19.532 Km] in the State of Nagaland in the FY – 2026-27 - (Percentage Rate and Work Order Basis) | Nagaland | 06-05-2026 | View Details | ||
| 66 | Hill Side Slope protection work at Kameda (386+550) in the work of "Construction & Upgradation of existing road to 2-lane with paved shoulder from Km 368.000 to Km. 399.000 of Lameri to Karanprayag (Excluding Km 379.100 to Km 380.275) of NH-07 in the State of Uttarakhand" under Risk & Cost of the EPC contractor. | Uttarakhand | 30-04-2026 | 30-04-2026 | View Details | |
| 67 | Consultancy services for preparation of Detailed Project Report and Pre-construction activities for Melli to Singtam section of NH-210 in the state of Sikkim | Sikkim | 27-04-2026 | 27-04-2026 | View Details | |
| 68 | Balance work for rectification of damages caused to bituminous pavement and road side drain for laying of PHED pipelines in connection with the project work of “Construction of 2-lane specification road with paved shoulder including Tunnel (300 m) at Rabongla on NH-510 (Singtam-Tarku-Rabongla-Legship-Gyalshing) Package-III (Design Chainage from KM 32.500 to Km 33.600) under SARDP-NE Phase- ‘A’ on the EPC basis in the State of Sikkim”, under jurisdiction of PMU-Gyalshing, NHIDCL on Percentage Rate Contract Basis in the state of Sikkim- 3rd Call | Sikkim | 27-04-2026 | View Details | ||
| 69 | Improvement & Widening to two lane with paved shoulder of road from km 101.300 (Khowai) to km 236.213 (Harina) (Total length = 134.913 km) of NH-208 in the State of Tripura on Engineering Procurement & Construction (EPC) basis under Japan International Cooperation Agency (JICA) Official Development Assistance (ODA) Loan. | Tripura | 27-04-2026 | 27-04-2026 | View Details | |
| 70 | Spot improvements and protection works on NH-10 during the FY 2026-27 on EPC Mode under NHIDCL in the state of West Bengal | West Bengal | 24-04-2026 | 24-04-2026 | View Details |