Important Notice for Mandatory E-BG,EMD and Tender Fee Deposit through Induscollect
For EMD & Tender Fee Payment Click Here
For e-BG Click Here
| Sr. No. | Descriptions | State | Bid Due Date Sort ascending | Tender ID | View Details |
|---|---|---|---|---|---|
| 1 | Development, Maintenance, Management and Operation of Greenfield High-Speed Corridor from Mawlyngkhung (near Shillong) in Meghalaya to Panchgram (near Silchar) in Assam by 4-Laning with Paved Shoulders on Hybrid Annuity Basis. (Package-3: From Km 78+600 to Km 133+320, Design Length – 54.720 Km). | Assam | 03-08-2026 15:00:00 | View Details | |
| 2 | Providing and supplying of vehicle 4 Nos. on monthly basis for NHIDCL PMU Office and Site Office - Darjeeling in the State of West Bengal. | West Bengal | 14-07-2026 11:00:00 | View Details | |
| 3 | Providing & supplying of vehicle 1 nos. on monthly basis for SO-Teesta under PMU - Siliguri, NHIDCL in the State of West Bengal | West Bengal | 07-07-2026 15:00:00 | View Details | |
| 4 | Balance work under Risk and Cost for Construction and upgradation of Existing Road to 2- Lane with Paved Shoulders including geometric improvement of section from start of Bagrakot to Kafer km 13.00 to km 25.600 (Package- IVB) of NH-717A in the state of West Bengal during the FY 2026-2027 on percentage rate basis | West Bengal | 06-07-2026 17:00:00 | 2026_NHIDC_909903_1 | View Details |
| 5 | Construction of Remedial Measures for treatment of Sinking Zone at 72 locations in between Km 85+000 to Km 95+000 & Km 101+000 to Km 145+000 of Tura-Dalu section of NH-51 in the State of Meghalaya on EPC Mode | Meghalaya | 06-07-2026 15:30:00 | View Details | |
| 6 | Emergent Maintenance work of the existing road of the project “Construction of 4-Lane Bridge over Irang River on Imphal- Jiribam road section (95.500Km) NH-37 (Old NH-53) in the State of Manipur on EPC mode” at the Risk & Cost of the EPC Contractor” on Percentage Rate and work Order Basis (2nd Call) | Manipur | 04-07-2026 15:00:00 | View Details | |
| 7 | Restoration & Repair work on NH-208 from km 36.000 to km 72.000 (Total Length – 36.000 Km) at various locations of existing road of Rangamati to Patichhari road section (Pkg-III) at the risk and cost of EPC Contractor in the state of Tripura in the FY 2026-27 on item rate basis & work order basis. | Tripura | 30-06-2026 17:30:00 | View Details | |
| 8 | Construction of 2-Lane with paved shoulder of Existing Intermediate Lane of NH-137G from Village near Pailapool at Design Ch. 0+00 (Ch. 20.800 of Silchar Jiribam Pkg-I, NH-37) to Village P.Songkai at Design Ch. 58+342 (Ch. 106+830 of Tamenglong- Mahur section of NH-137) near Hangrum (Length: 58.342 km) in the State of Assam under NH(O)-NE on Hybrid Annuity Mode | Assam | 30-06-2026 11:00:00 | View Details | |
| 9 | Development, Maintenance, Management and Operation of Greenfield High-Speed Corridor from Mawlyngkhung (Near Shillong) in Meghalaya to Panchgram (Near Silchar) in Assam by 4-Laning with Paved Shoulders on Hybrid Annuity Basis” for Package-1: From Km 0+000 to Km 45+645 (Design Length – 45+645 Km) | Meghalaya | 29-06-2026 15:00:00 | View Details |