Important Notice for Mandatory E-BG,EMD and Tender Fee Deposit through Induscollect
For EMD & Tender Fee Payment Click Here
For e-BG Click Here
| Sr. No. | Descriptions | State | Bid Due Date Sort ascending | Tender ID | View Details |
|---|---|---|---|---|---|
| 1 | Construction of 2-Lane with paved shoulder of Existing Intermediate Lane of NH-137G from Village near Pailapool at Design Ch. 0+00 (Ch. 20.800 of Silchar Jiribam Pkg-I, NH-37) to Village P.Songkai at Design Ch. 58+342 (Ch. 106+830 of Tamenglong- Mahur section of NH-137) near Hangrum (Length: 58.342 km) in the State of Assam under NH(O)-NE on Hybrid Annuity Mode | Assam | 27-04-2026 11:30:00 | View Details | |
| 2 | Development, Maintenance, Management and Operation of Greenfield High-Speed Corridor from Mawlyngkhung (Near Shillong) in Meghalaya to Panchgram (Near Silchar) in Assam by 4-Laning with Paved Shoulders on Hybrid Annuity Basis. (Package-2: From Km 45+645 To Km 78+600, Design Length – 32.955 Km). | Meghalaya | 20-04-2026 15:30:00 | View Details | |
| 3 | STRENGTHENING OF MAO TO SENAPATI SECTION OF OLD NH-39 (NEW NH-02) FROM EXISTING CHAINAGE KM 212+328 (MAO GATE) TO KM 264+313 (TAPHOU KUKI) IN THE STATE OF MANIPUR ON EPC MODE (TOTAL LENGTH 51.985 KM) | Manipur | 16-04-2026 15:30:00 | View Details | |
| 4 | BALANCE WORK OF STRENGTHENING OF UKHRUL TO CHOITHAR SECTION OF NH-202 FROM EXISTING KM 50+520 TO KM 59+236 (DESIGN CHAINAGE KM 45+600 TO KM 54+212) IN THE STATE OF MANIPUR ON EPC MODE UNDER NH(O)-NE (PACKAGE-4, LENGTH-8.612 KM) | Manipur | 15-04-2026 15:30:00 | View Details | |
| 5 | Development, Maintenance, Management and Operation of Greenfield High-Speed Corridor from Mawlyngkhung (Near Shillong) in Meghalaya to Panchgram (Near Silchar) in Assam by 4-Laning with Paved Shoulders on Hybrid Annuity Basis” for Package-1: From Km 0+000 to Km 45+645 (Design Length – 45+645 Km) | Meghalaya | 15-04-2026 15:30:00 | View Details | |
| 6 | REQUEST FOR PROPOSAL for Engagement of Communication and Creative Agencies for NHIDCL (Limited Tender Enquiry) | Delhi | 15-04-2026 15:00:00 | View Details | |
| 7 | Maintenance & Repair work on Agartala to Khowai NH-108B from Km 19.300 to Km 32.800 at various sections i.e, Mohanpur to Subalsingh section at the risk and cost of EPC Contractor in the state of Tripura in the FY 2025-26 on item rate basis & work order basis. | Tripura | 13-04-2026 17:30:00 | View Details | |
| 8 | Consultancy Services for Authority’s Engineer for supervision of balance works of (i) Construction of Balance works of Major Bridge over Middle Strait Creek between Km. 106.590 to km 108.553 of NH-04 connecting South Andaman & Baratang Island in the Union Territory of Andaman & Nicobar Islands on EPC Basis (ii) Rehabilitation and upgradation and completion of balance work of section from Km 107.760 to Km 129.445 (After Middle strait to Humphrey), Km 130.600 to Km 138.300 (After Humphrey to Kadamtala) of NH-04 to Intermediate/2-lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands on EPC basis - (Package-IIIA). (iii) Rehabilitation and upgradation and completion of balance work of section from Km 155.00 to Km 181.00 (End of Jarwa to Rangat) of NH -4 (Total length 26 Km) to Intermediate Lane/2-lane with hard shoulders in the UT of A&N Islands on EPC basis – (Package IIIB). (iv) Rehabilitation and up-gradation of section from Km 206.000 to Km 239.425 of NH-223 (New NH-4) to Intermediate Lane/2-lane in the UT of A&N Islands on EPC basis. (Package-IV). (v) Rehabilitation of Km 0.00 to Km 12.00 section in Andaman Trunk Road of NH-4 to Intermediate Lane with hard shoulder in the UT of A&N Islands on EPC basis. (PackageV). (vi) Rehabilitation of section from Km 45.00 to Km 59.20 of NH-4 to Intermediate Lane with hard shoulder in the UT of A&N Islands on EPC basis. (Package-VI). (vii) Rehabilitation of Km 181.00 to Km 206.00 section in Andaman Trunk Road of NH-4 to Intermediate Lane with hard shoulder in the UT of A&N Islands on EPC basis. (PackageVII). (viii) Rehabilitation and Upgradation of Jarwa area on NH-04 (Old NH-223) from Km 59.40 to Km 107.00 and Km 138.30 to Km 155.00 in the Union Territory of Andaman & Nicobar Islands (Total Project Length = 206.27 km) on NH-04 (Old NH-223) in the Union Territory of Andaman & Nicobar Islands | Andaman and Nicobar | 13-04-2026 15:30:00 | View Details | |
| 9 | Development, Maintenance, Management and Operation of Greenfield High-Speed Corridor from Mawlyngkhung (Near Shillong) in Meghalaya to Panchgram (Near Silchar) in Assam by 4-Laning with Paved Shoulders on Hybrid Annuity Basis. (Package-4: From Km 133+320 to Km 164+355, Design Length – 31.035 Km) | Assam | 13-04-2026 11:30:00 | View Details | |
| 10 | Performance Based Maintenance Contracts (PBMC) on (i) NH 717 for highway starting from its junction with NH-17 near Baradighi connecting NH-27 near Mainaguri, Cangrabandha and terminating at Indo/Bangladesh Border in the State of West Bengal and (ii) NH-317A for highway starting from its junction with NH317 near Hasimara connecting Jaigaon and terminating at Indo/Bhutan Border in the state of West Bengal during the FY 2026-2027 | West Bengal | 09-04-2026 17:30:00 | View Details |