Current Tenders

Sr. No. Descriptions State Bid Due Date Sort ascending Tender ID View Details
1 Balance work under Risk and Cost for Construction and upgradation of Existing Road to 2- Lane with Paved Shoulders including geometric improvement of section from start of Bagrakot to Kafer km 13.00 to km 25.600 (Package- IVB) of NH-717A in the state of West Bengal during the FY 2026-2027 on percentage rate basis West Bengal 06-07-2026 17:00:00 2026_NHIDC_909903_1 View Details
2 Construction of 2-Lane with paved shoulder of Existing Intermediate Lane of NH-137G from Village near Pailapool at Design Ch. 0+00 (Ch. 20.800 of Silchar Jiribam Pkg-I, NH-37) to Village P.Songkai at Design Ch. 58+342 (Ch. 106+830 of Tamenglong- Mahur section of NH-137) near Hangrum (Length: 58.342 km) in the State of Assam under NH(O)-NE on Hybrid Annuity Mode Assam 30-06-2026 11:00:00 View Details
3 Consultancy services for preparation of Detailed Project Report and pre-construction activities in respect of Upgradation of Aizawl to Thenzawl Road in the State of Mizoram Mizoram 29-06-2026 15:30:00 View Details
4 Development, Maintenance, Management and Operation of Greenfield High-Speed Corridor from Mawlyngkhung (Near Shillong) in Meghalaya to Panchgram (Near Silchar) in Assam by 4-Laning with Paved Shoulders on Hybrid Annuity Basis” for Package-1: From Km 0+000 to Km 45+645 (Design Length – 45+645 Km) Meghalaya 29-06-2026 15:00:00 View Details
5 Development, Maintenance, Management and Operation of Greenfield High-Speed Corridor from Mawlyngkhung (Near Shillong) in Meghalaya to Panchgram (Near Silchar) in Assam by 4-Laning with Paved Shoulders on Hybrid Annuity Basis. (Package-4: From Km 133+320 to Km 164+355, Design Length – 31.035 Km) Assam 29-06-2026 15:00:00 View Details
6 Development, Maintenance, Management and Operation of Greenfield High-Speed Corridor from Mawlyngkhung (Near Shillong) in Meghalaya to Panchgram (Near Silchar) in Assam by 4-Laning with Paved Shoulders on Hybrid Annuity Basis. (Package-2: From Km 45+645 To Km 78+600, Design Length – 32.955 Km). Meghalaya 23-06-2026 15:00:00 View Details
7 Construction of Remedial Measures for treatment of Sinking Zone at 72 locations in between Km 85+000 to Km 95+000 & Km 101+000 to Km 145+000 of Tura-Dalu section of NH-51 in the State of Meghalaya on EPC Mode Meghalaya 22-06-2026 15:30:00 View Details
8 Consultancy Services as Authority’s Engineer for Supervision of balance work : (i) Construction of High Altitude Hill road from Tedadege TO Henkaer from KM 0.000 to KM 28.550 in West Siang District of the state of Arunachal Pradesh on EPC Mode. & (ii) Construction of High Altitude Hill road from Doginala TO Gau from KM 0.000 to KM 15.918 in Upper Subansiri District of the state of Arunachal Pradesh on EPC Mode. Arunachal Pradesh 22-06-2026 15:00:00 2026_NHIDC_904606_1 View Details
9 Consultancy services for preparation of Detailed Project Report and Pre-construction activities for Melli to Singtam section of NH-210 in the state of Sikkim (2nd Call) Sikkim 18-06-2026 15:30:00 View Details
10 Providing and supplying of vehicle 4 Nos. on monthly basis for NHIDCL PMU Office and Site Office - Darjeeling in the State of West Bengal. West Bengal 18-06-2026 11:00:00 View Details