Balance Works for: (i) Construction of 2-Lane Specification Road with Paved Shoulders as Realignment (Greenfield Alignment) of Existing Stretch between Legship and Gyalshing of NH-510 (Design Chainage Km 58+840 to Km 75+000) under SARDP-NE Phase “A” on EPC Mode in the State of Sikkim (Package-V).
(ii) Construction of 2-Lane Specification Road with Paved Shoulder as Realignment (Greenfield Alignment) of Existing Stretch between Legship to Gyalshing of NH-510 (Design Chainage from Km 75.000 to Km 90.210) under SARDP-NE Phase ”A” on EPC Mode in the State of Sikkim-(Package- VI)”

Basic Information

Descriptions State Tender ID
Balance Works for: (i) Construction of 2-Lane Specification Road with Paved Shoulders as Realignment (Greenfield Alignment) of Existing Stretch between Legship and Gyalshing of NH-510 (Design Chainage Km 58+840 to Km 75+000) under SARDP-NE Phase “A” on EPC Mode in the State of Sikkim (Package-V).
(ii) Construction of 2-Lane Specification Road with Paved Shoulder as Realignment (Greenfield Alignment) of Existing Stretch between Legship to Gyalshing of NH-510 (Design Chainage from Km 75.000 to Km 90.210) under SARDP-NE Phase ”A” on EPC Mode in the State of Sikkim-(Package- VI)”
Sikkim 2026_NHIDC_918372_1

Documents

NIT RFP DCA Schedules Drawings

Important Dates

Title Date Revised Date
NIT 21-07-2026
Pre-Bid Meeting 17-08-2026
Bid Due 07-09-2026
Technical Bid Opening 08-09-2026