Important Notice for Mandatory E-BG,EMD and Tender Fee Deposit through Induscollect
For EMD & Tender Fee Payment Click Here
For e-BG Click Here
| Sr. No. | Descriptions | State | Bid Due Date Sort ascending | Tender ID | View Details |
|---|---|---|---|---|---|
| 1 | Construction of Remedial Measures for treatment of Sinking Zone at 72 locations in between Km 85+000 to Km 95+000 & Km 101+000 to Km 145+000 of Tura-Dalu section of NH-51 in the State of Meghalaya on EPC Mode | Meghalaya | 22-06-2026 15:30:00 | View Details | |
| 2 | Consultancy services for preparation of Detailed Project Report and Pre-construction activities for Melli to Singtam section of NH-210 in the state of Sikkim (2nd Call) | Sikkim | 18-06-2026 15:30:00 | View Details | |
| 3 | Short-Term Maintenance Contract (STMC) on NH-510 for the section from km 58.840 to km 90.210 (under PKG-V & PKG-VI), under the jurisdiction of PMU-Gyalshing, NHIDCL, on a Percentage Rate Contract basis for FY 2026-27 in the State of Sikkim | Sikkim | 08-06-2026 16:30:00 | View Details | |
| 4 | Development, Maintenance, Management and Operation of Greenfield High-Speed Corridor from Mawlyngkhung (Near Shillong) in Meghalaya to Panchgram (Near Silchar) in Assam by 4-Laning with Paved Shoulders on Hybrid Annuity Basis” for Package-1: From Km 0+000 to Km 45+645 (Design Length – 45+645 Km) | Meghalaya | 08-06-2026 15:30:00 | View Details | |
| 5 | Consultancy Services as Authority’s Engineer for Supervision of balance work : (i) Construction of High Altitude Hill road from Tedadege TO Henkaer from KM 0.000 to KM 28.550 in West Siang District of the state of Arunachal Pradesh on EPC Mode. & (ii) Construction of High Altitude Hill road from Doginala TO Gau from KM 0.000 to KM 15.918 in Upper Subansiri District of the state of Arunachal Pradesh on EPC Mode. | Arunachal Pradesh | 04-06-2026 15:30:00 | View Details | |
| 6 | Development, Maintenance, Management and Operation of Greenfield High-Speed Corridor from Mawlyngkhung (Near Shillong) in Meghalaya to Panchgram (Near Silchar) in Assam by 4-Laning with Paved Shoulders on Hybrid Annuity Basis. (Package-4: From Km 133+320 to Km 164+355, Design Length – 31.035 Km) | Assam | 04-06-2026 11:30:00 | View Details | |
| 7 | Performance Based Maintenance Contracts (PBMC) for Strengthening and Maintenance on (i) NH-717 for highway starting from its junction with NH-17 near Baradighi connecting NH-27 near Mainaguri, Cangrabandha and terminating at Indo/Bangladesh Border in the State of West Bengal and (ii) NH-317A for highway starting from its junction with NH-317 near Hasimara connecting Jaigaon and terminating at Indo/Bhutan Border in the state of West Bengal during the FY 2026- 2027 (2nd Call) | West Bengal | 02-06-2026 17:30:00 | View Details | |
| 8 | Development, Maintenance, Management and Operation of Greenfield High-Speed Corridor from Mawlyngkhung (Near Shillong) in Meghalaya to Panchgram (Near Silchar) in Assam by 4-Laning with Paved Shoulders on Hybrid Annuity Basis. (Package-2: From Km 45+645 To Km 78+600, Design Length – 32.955 Km). | Meghalaya | 01-06-2026 15:30:00 | View Details | |
| 9 | Short Term Maintenance Contract works from Km 173.325 to Km 201.440 of NH 06 Section MalidorBadarpur in the State of Assam FY-2025-26-2nd Call | Assam | 29-05-2026 17:30:00 | View Details | |
| 10 | Consultancy Services for Authority’s Engineer for supervision of balance works of (i) Construction of Balance works of Major Bridge over Middle Strait Creek between Km. 106.590 to km 108.553 of NH-04 connecting South Andaman & Baratang Island in the Union Territory of Andaman & Nicobar Islands on EPC Basis (ii) Rehabilitation and upgradation and completion of balance work of section from Km 107.760 to Km 129.445 (After Middle strait to Humphrey), Km 130.600 to Km 138.300 (After Humphrey to Kadamtala) of NH-04 to Intermediate/2-lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands on EPC basis - (Package-IIIA). (iii) Rehabilitation and upgradation and completion of balance work of section from Km 155.00 to Km 181.00 (End of Jarwa to Rangat) of NH -4 (Total length 26 Km) to Intermediate Lane/2-lane with hard shoulders in the UT of A&N Islands on EPC basis – (Package IIIB). (iv) Rehabilitation and up-gradation of section from Km 206.000 to Km 239.425 of NH-223 (New NH-4) to Intermediate Lane/2-lane in the UT of A&N Islands on EPC basis. (Package-IV). (v) Rehabilitation of Km 0.00 to Km 12.00 section in Andaman Trunk Road of NH-4 to Intermediate Lane with hard shoulder in the UT of A&N Islands on EPC basis. (PackageV). (vi) Rehabilitation of section from Km 45.00 to Km 59.20 of NH-4 to Intermediate Lane with hard shoulder in the UT of A&N Islands on EPC basis. (Package-VI). (vii) Rehabilitation of Km 181.00 to Km 206.00 section in Andaman Trunk Road of NH-4 to Intermediate Lane with hard shoulder in the UT of A&N Islands on EPC basis. (PackageVII). (viii) Rehabilitation and Upgradation of Jarwa area on NH-04 (Old NH-223) from Km 59.40 to Km 107.00 and Km 138.30 to Km 155.00 in the Union Territory of Andaman & Nicobar Islands (Total Project Length = 206.27 km) on NH-04 (Old NH-223) in the Union Territory of Andaman & Nicobar Islands | Andaman and Nicobar | 28-05-2026 15:30:00 | View Details |