Important Notice for Mandatory E-BG,EMD and Tender Fee Deposit through Induscollect
For EMD & Tender Fee Payment Click Here
For e-BG Click Here
| Sr. No. | Descriptions | State | Bid Due Date Sort ascending | Tender ID | View Details |
|---|---|---|---|---|---|
| 1 | Balance work under Risk and Cost for Construction and upgradation of Existing Road to 2- Lane with Paved Shoulders including geometric improvement of section from start of Bagrakot to Kafer km 13.00 to km 25.600 (Package- IVB) of NH-717A in the state of West Bengal during the FY 2026-2027 on percentage rate basis | West Bengal | 06-07-2026 17:00:00 | 2026_NHIDC_909903_1 | View Details |
| 2 | Construction of 2-Lane with paved shoulder of Existing Intermediate Lane of NH-137G from Village near Pailapool at Design Ch. 0+00 (Ch. 20.800 of Silchar Jiribam Pkg-I, NH-37) to Village P.Songkai at Design Ch. 58+342 (Ch. 106+830 of Tamenglong- Mahur section of NH-137) near Hangrum (Length: 58.342 km) in the State of Assam under NH(O)-NE on Hybrid Annuity Mode | Assam | 30-06-2026 11:00:00 | View Details | |
| 3 | Consultancy services for preparation of Detailed Project Report and pre-construction activities in respect of Upgradation of Aizawl to Thenzawl Road in the State of Mizoram | Mizoram | 29-06-2026 15:30:00 | View Details | |
| 4 | Development, Maintenance, Management and Operation of Greenfield High-Speed Corridor from Mawlyngkhung (Near Shillong) in Meghalaya to Panchgram (Near Silchar) in Assam by 4-Laning with Paved Shoulders on Hybrid Annuity Basis” for Package-1: From Km 0+000 to Km 45+645 (Design Length – 45+645 Km) | Meghalaya | 29-06-2026 15:00:00 | View Details | |
| 5 | Development, Maintenance, Management and Operation of Greenfield High-Speed Corridor from Mawlyngkhung (Near Shillong) in Meghalaya to Panchgram (Near Silchar) in Assam by 4-Laning with Paved Shoulders on Hybrid Annuity Basis. (Package-4: From Km 133+320 to Km 164+355, Design Length – 31.035 Km) | Assam | 29-06-2026 15:00:00 | View Details | |
| 6 | Development, Maintenance, Management and Operation of Greenfield High-Speed Corridor from Mawlyngkhung (Near Shillong) in Meghalaya to Panchgram (Near Silchar) in Assam by 4-Laning with Paved Shoulders on Hybrid Annuity Basis. (Package-2: From Km 45+645 To Km 78+600, Design Length – 32.955 Km). | Meghalaya | 23-06-2026 15:00:00 | View Details | |
| 7 | Construction of Remedial Measures for treatment of Sinking Zone at 72 locations in between Km 85+000 to Km 95+000 & Km 101+000 to Km 145+000 of Tura-Dalu section of NH-51 in the State of Meghalaya on EPC Mode | Meghalaya | 22-06-2026 15:30:00 | View Details | |
| 8 | Consultancy Services as Authority’s Engineer for Supervision of balance work : (i) Construction of High Altitude Hill road from Tedadege TO Henkaer from KM 0.000 to KM 28.550 in West Siang District of the state of Arunachal Pradesh on EPC Mode. & (ii) Construction of High Altitude Hill road from Doginala TO Gau from KM 0.000 to KM 15.918 in Upper Subansiri District of the state of Arunachal Pradesh on EPC Mode. | Arunachal Pradesh | 22-06-2026 15:00:00 | 2026_NHIDC_904606_1 | View Details |
| 9 | Consultancy services for preparation of Detailed Project Report and Pre-construction activities for Melli to Singtam section of NH-210 in the state of Sikkim (2nd Call) | Sikkim | 18-06-2026 15:30:00 | View Details | |
| 10 | Providing and supplying of vehicle 4 Nos. on monthly basis for NHIDCL PMU Office and Site Office - Darjeeling in the State of West Bengal. | West Bengal | 18-06-2026 11:00:00 | View Details |