| Sr. No | Title | Date of Declaration | Document | Date of withdrawal | Document of Withdrawal |
|---|---|---|---|---|---|
| 1 | Declaring Gammon-SPSCPL (JV) as Non-Performer. | 13-05-2022 | 21-01-24 | ||
| 2 | Declaring the Authority’s Engineer M/s Yongma Engineering Co. Ltd. in association with M/s Sterling Indo Tech Consultants Pvt. Ltd. as Non-Performer. | 13-07-2022 | 03-03-23 | ||
| 3 | Declaring the Authority’s Engineer M/s Planning & Infrastructure Development Consultants Pvt. Ltd. in association with M/s Oms Infra Consultants Pvt. Ltd. as Non-Performer. | 26-07-2022 | 12-04-23 | ||
| 4 | Declaring the M/s Oasis Projects Ltd as Non-Performer. | 10-08-2022 | |||
| 5 | Declaration M/s Yongma Engineering Co Ltd in JV with Redecon (India) Pvt. Ltd and in Association with CHO & Kim Engineering Pvt. Ltd as Non-Performer in National Highways and centrally sponsored road projects.. | 08-09-2022 | 03-03-23 | ||
| 6 | Declaration of M/s Magot Engineering Consultants Pvt. Ltd as Non Performer in National Highway and Centrally sponsored road projects. | 14-11-2022 | 18-01-24 | ||
| 7 | Declaring the DPR Consultant M/s CM Engineering & Solution in JV with Anandjiwala Infra Advisory in association with Anandjiwala Technical Consultancy as Non-Performer. | 17-11-2022 | 22-09-25 | ||
| 8 | Declaring the EPC Contractor M/s Mantena Vasishta Strait (JV) as Non-Performer. | 30-11-2022 | |||
| 9 | Declaring the EPC Contractor M/s Madhucon Projects Ltd. as Non-Performer. | 10-01-2023 | 05-01-24 | ||
| 10 | Declaring M/s Tanor Engineering as Non-Performer. | 11-01-2023 | 01-02-23 |