| Sr. No. | Descriptions | State | Bid Due Date Sort ascending | Bid Due Date - (Revised) | Tender ID | View Details |
|---|---|---|---|---|---|---|
| 281 | 3rd Party Road Safety Audit on the stretches with NHIDCL under the jurisdiction of PMU Silchar in the State of Assam-Bundle-X (2nd Call) | Assam | 14-07-2025 | View Details | ||
| 282 | 3rd Party Road Safety Audit on the stretches with NHIDCL under the jurisdiction of PMU Karimganj in the State of Assam-Bundle-XII (2nd Call) | Assam | 14-07-2025 | View Details | ||
| 283 | Repair & Restoration of Two-laning of existing Akajan-Likabali-Bame road on item rate basis from Design km 12.00 to km 33.00 (Total Length =21 Km) on Akajan-Likabali-Bame Road (Package-1) Section in the state of Arunachal Pradesh | Arunachal Pradesh | 09-07-2025 | View Details | ||
| 284 | Repair & Restoration of Two-laning of existing Akajan-Likabali-Bame road on item rate basis from Design km 12.00 to km 33.00 (Total Length =21 Km) on Akajan-Likabali-Bame Road (Package-1) Section in the state of Arunachal Pradesh. | Arunachal Pradesh | 09-07-2025 | View Details | ||
| 285 | Short Term Maintenance Contract (STMC) from km 6.800 to km 55.00 0 (Total length 48.200 km) on road Agartala to Udaipur (NH-08) in the State of Tripura in the FY 2025- 26 on percentage basis and work order basis. | Tripura | 08-07-2025 | View Details | ||
| 286 | Special & Emergent Repair through Short Term Maintenance Contract o n NH-08 in between Mungiakami to Champaknagar section for undertaking of protection works from Km 42 9+600 to Km 429+695, Km 426+80 0 to Km 426+833, Km 427+650 to K m 427+680, Km 434+300 to Km 434 +370, Km 444+900 to Km 444+930, Km 445+100 to Km 445+130, Km 4 48+300 to Km 448+310, Km 454+2 00 to Km 454+220 & Km 456+300 t o Km 456+315 along with construction of roadside embankment from Km 434+300 to Km 434+360 & Km 445+600 to Km 445+680 in the state of Tripura in the FY 2025-26 on percentage basis and work order basis | Tripura | 07-07-2025 | View Details | ||
| 287 | Special Repair work on NH-208 from Km 75.700 to Km 101.30 (Total Length – 25.600 Km) at various sections i.e, Srirampur to Khowai section at the risk and cost of EPC Contractor in the state of Tripura in the FY 2025-26 on item rate basis & work order basis. | Tripura | 07-07-2025 | 2025_NHIDC_860294_1 | View Details | |
| 288 | Consultancy Services as Authority’s Engineer for supervision of works including Landslides Mitigation, Treatment and Road Maintenance Works in the highway section from km 368.00 to km 468.00 on NH-07 in the state of Uttarakhand | Uttarakhand | 07-07-2025 | View Details | ||
| 289 | Consultancy Services for preparation of Detailed Project Report for Consultancy Services for Preparation of Detailed Project Report for Construction of 4-Lane Access Controlled High Speed Corridor starting from Siliguri to Guwahati and connecting Jorabat in the States of West Bengal and Assam | West Bengal | 03-07-2025 | 07-08-2025 | View Details | |
| 290 | Widening/Imrpovement to 4 (Four) lane of Karimganj - Sutarkandi section of NH-37 from Design Chainage 0.020 (Start of proposed Karimganj Bypass from NH-8) to Km 14.380 (Sutarkandi) Package-VII in the state of Assam on HAM mode (Project length - 14.360 Km) | Assam | 28-06-2025 | View Details |