Widening/Up-Gradation of Intermittent Two Lane plus Paved Shoulder Stretches to Four Lane between Design Km 148+589 (Existing Km 235+070) (Vailoo) to Design Km 176+532 (Existing Km 263+070) [Donipawa] of 9.866 Km Length on Khellani–Khanabal Section of NH- Read more about Widening/Up-Gradation of Intermittent Two Lane plus Paved Shoulder Stretches to Four Lane between Design Km 148+589 (Existing Km 235+070) (Vailoo) to Design Km 176+532 (Existing Km 263+070) [Donipawa] of 9.866 Km Length on Khellani–Khanabal Section of NH-
Improvement & Widening to two lane with paved shoulder of road from km 101.300 (Khowai) to km 236.213 (Harina) (Total length = 134.913 km) of NH-208 in the State of Tripura on Engineering Procurement & Construction (EPC) basis under Japan International Co Read more about Improvement & Widening to two lane with paved shoulder of road from km 101.300 (Khowai) to km 236.213 (Harina) (Total length = 134.913 km) of NH-208 in the State of Tripura on Engineering Procurement & Construction (EPC) basis under Japan International Co
Upgradation from 2 Lane with PS to 4 Lane configuration of NH-15 from Ch 381+000 at Gogamukh to Ch 438+000 at Kulajan Tiniali in the State of Assam Read more about Upgradation from 2 Lane with PS to 4 Lane configuration of NH-15 from Ch 381+000 at Gogamukh to Ch 438+000 at Kulajan Tiniali in the State of Assam
Restoration of road by way of clearance of landslide, surface boulders including construction of R/walls and B/walls and laying of WBM-III & Bituminous Carpeting on Chatroo-Singpora link road from Km 0.000 to 19.600 in the UT of J&K.for FY 2024-25 Read more about Restoration of road by way of clearance of landslide, surface boulders including construction of R/walls and B/walls and laying of WBM-III & Bituminous Carpeting on Chatroo-Singpora link road from Km 0.000 to 19.600 in the UT of J&K.for FY 2024-25
Consultancy Services for Preparation of Feasibility Study and Detailed Project Report for Construction of 4-Lane with Paved Shoulder from Phulbari (Meghalaya) to Shillong in the State of Meghalaya. Read more about Consultancy Services for Preparation of Feasibility Study and Detailed Project Report for Construction of 4-Lane with Paved Shoulder from Phulbari (Meghalaya) to Shillong in the State of Meghalaya.
Widening & Upgradation to 2-lane with paved shoulder of Balance Work of NH-301 Kargil Zanskar Road from Design km 6.000 to km 30.040 of 24.040 Km length in the Union Territory of Ladakh on EPC mode, including the Additional Protection Works for Widening & Read more about Widening & Upgradation to 2-lane with paved shoulder of Balance Work of NH-301 Kargil Zanskar Road from Design km 6.000 to km 30.040 of 24.040 Km length in the Union Territory of Ladakh on EPC mode, including the Additional Protection Works for Widening &
Upgradation from 2 Lane with PS to 4 Lane configuration of NH-15 from Ch 381+000 at Gogamukh to Ch 438+000 at Kulajan Tiniali in the State of Assam Read more about Upgradation from 2 Lane with PS to 4 Lane configuration of NH-15 from Ch 381+000 at Gogamukh to Ch 438+000 at Kulajan Tiniali in the State of Assam
(i) Strengthening of Udaipur–Sabroom section from km 55.000 to km 127.372 of NH-08 and (ii) Raising and drainage provision in selected stretches of Agartala-Udaipur section of NH-08 in the State of Tripura on EPC mode. Read more about (i) Strengthening of Udaipur–Sabroom section from km 55.000 to km 127.372 of NH-08 and (ii) Raising and drainage provision in selected stretches of Agartala-Udaipur section of NH-08 in the State of Tripura on EPC mode.
Improvement and Widening to two lane with Paved Shoulder of NH-13 & 15 (Old NH-52) from Existing Km 745.60 (Design Km 0.000) to Existing km 770.600 (Design Km 24.819) (Brahmakund T-junction to Kamlang T-Junction, Existing Length: 25.00 Km, Design Length: Read more about Improvement and Widening to two lane with Paved Shoulder of NH-13 & 15 (Old NH-52) from Existing Km 745.60 (Design Km 0.000) to Existing km 770.600 (Design Km 24.819) (Brahmakund T-junction to Kamlang T-Junction, Existing Length: 25.00 Km, Design Length:
Short Term Maintenance work (Miscellaneous Structure works) from Km. 368.000 to Km. 468.000 of Rudraprayag to Helang on NH-7 (old NH-58) under M&R Head and at Risk & Cost of the EPC Contractor in the state of Uttarakhand Read more about Short Term Maintenance work (Miscellaneous Structure works) from Km. 368.000 to Km. 468.000 of Rudraprayag to Helang on NH-7 (old NH-58) under M&R Head and at Risk & Cost of the EPC Contractor in the state of Uttarakhand