emblem BUILDING INFRASTRUCTURE - BUILDING THE NATION

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways

Balance work of Changtongya - Longleng Road (Pkg-II)

Construction of balance work of 2-lane with hard shoulder of Changtongya - Longleng Road on EPC b

Project Status
Ongoing

Corridors: Changtongya - Longleng Road Project status: Ongoing

Construction of balance work of 2-lane with hard shoulder of Changtongya - Longleng Road on EPC basis from existing Km16.592 to Km29.530 [Design Km.18.779 to Km 33.428] (Design Length-14.649 km) (Package-II)