| Sr. No. | Descriptions | State | Bid Due Date Sort ascending | Bid Due Date - (Revised) | Tender ID | View Details |
|---|---|---|---|---|---|---|
| 31 | Maintenance of existing road section from Churachandpur to Tipaimukh of NH-02 from Km 70.00 to Km 185.00 in the State of Manipur, on item-rate and work-order basis, under risk and cost of the EPC Contractor. (4th Call) | Manipur | 13-07-2026 | 2026_NHIDC_915779_1 | View Details | |
| 32 | Maintenance of existing road section from Churachandpur to Tipaimukh of NH-02 from Km 70.00 to Km 185.00 in the State of Manipur, on item-rate and work-order basis, under risk and cost of the EPC Contractor. (4th Call) | Manipur | 13-07-2026 | View Details | ||
| 33 | Emergent Maintenance work of the existing road of the project “Construction of 4-Lane Bridge over Irang River on Imphal- Jiribam road section (95.500Km) NH-37 (Old NH-53) in the State of Manipur on EPC mode” at the Risk & Cost of the EPC Contractor” on Percentage Rate and work Order Basis (2nd Call) | Manipur | 09-07-2026 | 09-07-2026 | View Details | |
| 34 | Development, Maintenance, Management and Operation of Greenfield High-Speed Corridor from Mawlyngkhung (Near Shillong) in Meghalaya to Panchgram (Near Silchar) in Assam by 4-Laning with Paved Shoulders on Hybrid Annuity Basis” for Package-1: From Km 0+000 to Km 45+645 (Design Length – 45+645 Km) | Meghalaya | 08-07-2026 | 08-07-2026 | View Details | |
| 35 | Development, Maintenance, Management and Operation of Greenfield High-Speed Corridor from Mawlyngkhung (Near Shillong) in Meghalaya to Panchgram (Near Silchar) in Assam by 4-Laning with Paved Shoulders on Hybrid Annuity Basis. (Package-2: From Km 45+645 To Km 78+600, Design Length – 32.955 Km). | Meghalaya | 08-07-2026 | 08-07-2026 | View Details | |
| 36 | Balance work under Risk and Cost for Construction and Upgradation of Existing Road to 2- Lane with Paved Shoulders including geometric improvement of section from Kafer to Lava more km 40.00 to km 61.100 of NH-717A in the state of West Bengal during the FY 2026-2027 (Package-VA) on percentage rate basis | West Bengal | 06-07-2026 | 06-07-2026 | 2026_NHIDC_909872_1 | View Details |
| 37 | Construction of Remedial Measures for treatment of Sinking Zone at 72 locations in between Km 85+000 to Km 95+000 & Km 101+000 to Km 145+000 of Tura-Dalu section of NH-51 in the State of Meghalaya on EPC Mode | Meghalaya | 02-07-2026 | 22-06-2026 | View Details | |
| 38 | Invitation of Tender For Providing the Services of Vehicle On Monthly Basis to NHIDCL, PMU-Ranipool (Sikkim) |
Sikkim | 01-07-2026 | 20-06-2026 | View Details | |
| 39 | Restoration & Repair work on NH-208 from km 36.000 to km 72.000 (Total Length – 36.000 Km) at various locations of existing road of Rangamati to Patichhari road section (Pkg-III) at the risk and cost of EPC Contractor in the state of Tripura in the FY 2026-27 on item rate basis & work order basis. | Tripura | 30-06-2026 | 30-06-2026 | View Details | |
| 40 | Construction of 2-Lane with paved shoulder of Existing Intermediate Lane of NH-137G from Village near Pailapool at Design Ch. 0+00 (Ch. 20.800 of Silchar Jiribam Pkg-I, NH-37) to Village P.Songkai at Design Ch. 58+342 (Ch. 106+830 of Tamenglong- Mahur section of NH-137) near Hangrum (Length: 58.342 km) in the State of Assam under NH(O)-NE on Hybrid Annuity Mode | Assam | 30-06-2026 | 28-04-2026 | View Details |