| Sr. No. | Descriptions | State | Bid Due Date Sort ascending | Bid Due Date - (Revised) | Tender ID | View Details |
|---|---|---|---|---|---|---|
| 201 | Special repair and specialised restoration & slope protection work through Short Term Maintenance Contract on Kumarghat to Ambassa road section NH08 in various stretches (km. 345.000, km. 380.180 to km. 380.580, km.395.000, km.395.500 & km. 396.500) in the state of Tripura in the FY 2025-26 on percentage and work order basis. | Tripura | 01-10-2025 | View Details | ||
| 202 | Restoration works under Special Repairs through STMC for erosion control and slope protection at damaged stretches including landslips on various chainages on NH-08 section from Udaipur to Sabroom and on Udaipur to Melaghar road (Spur NH-08), due to August 2024 floods, based on the assessment report of technical consultant NIT Agartala in the State of Tripura in the FY 2025-26 on percentage basis and work order basis. | Tripura | 01-10-2025 | 13-10-2025 | View Details | |
| 203 | Providing and supplying of vehicle 2 Nos. on monthly basis for NHIDCL RO-Siliguri in the State of West Bengal. | West Bengal | 01-10-2025 | 16-10-2025 | View Details | |
| 204 | Providing and supplying of vehicle 1 No. on monthly basis for NHIDCL RO-Siliguri in the State of West Bengal. | West Bengal | 01-10-2025 | 16-10-2025 | View Details | |
| 205 | Special Repair works on NH-208A from km 0.000 to km 11.800 (Total Length – 11.800 km) at various sections of Kailashahar to Kurti Bridge Pkg-I at the risk and cost of EPC Contractor in the state of Tripura in the FY 2025-26 on item rate basis & work order basis | Tripura | 25-09-2025 | View Details | ||
| 206 | Hiring of commercial vehicle for office use of NHIDCL 01 (ONE) vehicle in District - Leh | Ladakh | 25-09-2025 | 10-10-2025 | View Details | |
| 207 | Providing ft supplying of 03 nos. vehicle (01 Innova Crysta or equivalent, 02 Scorpio or equivalent) on contract for NHIDCL, PMU-Shillong in the state of Meghalaya. | Meghalaya | 24-09-2025 | View Details | ||
| 208 | Restoration & Repair work on NH-208 from km 49.200 to km 63.700 (Total Length – 14.500 Km) at various sections of Jurichhara to Bamanchara road (Pkg-III) at the risk and cost of EPC Contractor in the state of Tripura in the FY 2025-26 on item rate basis & work order basis. | Tripura | 24-09-2025 | View Details | ||
| 209 | Improvement of stretch by construction of side drain, construction of pipe culverts, R/walls, B/walls ,RCC drain and laying of bituminous carpeting incl. Installing of Road safety Item Metallic Crash Barrier, Retroreflective Sign Board, Road marking, Delinators & Road studs from Hasti (Ex.Km 97) to Kurya (Ex.Km 124) on Dulhasti -Kishtwar- Bandarkoot-Kuriya existing section of NH-244 in the UT of Jammu & Kashmir for FY 2025 -2026 | Union Territory of Jammu and Kashmir | 24-09-2025 | View Details | ||
| 210 | Consultancy Services as Authority’s Engineer for Supervision of: (i) Widening to 2- (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage km 66.110 to km 101.280 (PKG-IV) in the state of Manipur on EPC mode. (ii) Widening to 2- (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage km 101.280 to km 131.280 (PKG-V) in the state of Manipur on EPC mode. (iii) Widening to 2- (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage km 131.280 to km 169.570 (PKG-VI) in the state of Manipur on EPC mode. (iv) Widening to 2- (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage km 169.570 to km 205.974 (PKG-VII) in the state of Manipur on EPC mode. | Manipur | 24-09-2025 | View Details |