| Sr. No. | Descriptions | State | Bid Due Date Sort ascending | Bid Due Date - (Revised) | Tender ID | View Details |
|---|---|---|---|---|---|---|
| 1 | Providing services of Support Office Staff (such as Jr. Manager HR, Accountants, PA/Stenographers, IT Engineers, Consultant SAP, Legal Professional, LA Consultant, Office Assistants, Data Entry Operators, Multi-Tasking Staffs etc.) at NHIDCL in the State of Tripura. | Tripura | 12-09-2026 | View Details | ||
| 2 | Supply, Installation, Testing, Commissioning, Operation & Maintenance of Centralized Control & Monitoring System (CCMS) for Street Lighting on National Highways under NHIDCL, RO-Srinagar on Five (05) Year Contract Basis | Union Territory of Jammu and Kashmir | 08-09-2026 | View Details | ||
| 3 | Short Term Maintenance Contract for Restoration and Repair of Kohima Mao Road from Km. 185.540 to Km. 194.000 excluding Ch. from Km 191.840 to 192.100 Length 8.200 Km in the State of Nagaland in the FY – 2026-27 - Percentage Rate and Work Order Basis | Nagaland | 08-09-2026 | View Details | ||
| 4 | Short Term Maintenance Contract for Restoration and Repair of Kohima Mao Road from Km. 185.540 to Km. 194.000 excluding Ch. from Km 191.840 to 192.100 Length 8.200 Km in the State of Nagaland in the FY – 2026-27 - Percentage Rate and Work Order Basis | Nagaland | 08-09-2026 | View Details | ||
| 5 | Balance Works for: (i) Construction of 2-Lane Specification Road with Paved Shoulders as Realignment (Greenfield Alignment) of Existing Stretch between Legship and Gyalshing of NH-510 (Design Chainage Km 58+840 to Km 75+000) under SARDP-NE Phase “A” on EPC Mode in the State of Sikkim (Package-V). (ii) Construction of 2-Lane Specification Road with Paved Shoulder as Realignment (Greenfield Alignment) of Existing Stretch between Legship to Gyalshing of NH-510 (Design Chainage from Km 75.000 to Km 90.210) under SARDP-NE Phase ”A” on EPC Mode in the State of Sikkim-(Package- VI)” |
Sikkim | 07-09-2026 | 2026_NHIDC_918372_1 | View Details | |
| 6 | Widening and Up-gradation of existing carriageway into 2-lane with paved shoulder configuration from Rhenock (existing Km 0.000) to Rongli Bazaar (existing Km 15.300) along NH-717B in the State of Sikkim on EPC mode | 07-09-2026 | 27-08-2026 | View Details | ||
| 7 | Independent Engineer Services for “Development, maintenance, management and operation of Greenfield High-Speed Corridor of 164.3550 km (NH-6) from Mawlyngkhung (near Shillong) in Meghalaya to Panchgram (near Silchar) in Assam on Hybrid Annuity Mode”. | Meghalaya | 07-09-2026 | 07-09-2026 | 2026_NHIDC_913143_1 | View Details |
| 8 | Providing and supplying of vehicle 3 No. on monthly basis for NHIDCL PMU Office- Siliguri in the State of West Bengal. | West Bengal | 02-09-2026 | View Details | ||
| 9 | Balance Works of Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 146.246 to km 157.460 (Design Chainage 145.712 to km 156.634) of Dillai to Lahorijan (Package - 7) of NH-29 in the State of Assam on Item Rate Basis in FY-26-27 (5th Call) | Assam | 28-08-2026 | View Details | ||
| 10 | One Time Improvement of the existing pavement section of NH-17 from Satpakhali to Bongra (Km 117+540 to Km 132+625) in the State of Assam in FY 2026-27 | Assam | 28-08-2026 | View Details |