GST No. 07AAECN7759E1Z7
CIN : U45400DL2014GOI269062
A+
A+
A+
A+
National Portal
English
हिन्दी
(
Hindi
)
National Highways & Infrastructure Development Corporation Ltd.
Ministry of Road Transport & Highways, Government of India
Home
About
About Us
Our Organisation
Who’s who
Our Mission
Our Vision
Honourable Minister’s Message
Annual Report
2021-2022
2020-2021
2019-2020
2018-2019
2017-2018
2016-2017
2015-2016
2014-2015
CSR
Annual Return of NHIDCL
2020
2021
2022
Skill Development Training Program
International Cooperation
RTI
GST Cell
MoA(Memorandum of Association) & Notices
Dispute Resolution Mechanism
Internal Complaints Committee (ICC)
Chief Vigilance officer (CVO)
Independent External Monitor (IEM)
Projects
Current Status
All States
Andaman & Nicobar
Arunachal Pradesh
Assam
Himachal Pradesh
Manipur
Meghalaya
Mizoram
Nagaland
Sikkim
Tripura
Union Territory of Jammu & Kashmir
Union Territory of Ladakh
Uttarakhand
West Bengal
Nepal
Project Archive
Maps
Andaman & Nicobar
Arunachal Pradesh
Assam
Himachal Pradesh
Manipur
Meghalaya
Mizoram
Nagaland
Sikkim
Tripura
Union Territory of Jammu & Kashmir
Union Territory of Ladakh
Uttarakhand
West Bengal
Nepal
e Book
NHIDCL 2016
NHIDCL 2015
Guidelines on LA
Infracon
INAM-Pro
INAM-Pro Brochure
BGMS
Sugampath
IT Task Force
Essential Safety for Hill Roads
Standardization of Reporting Responsibilities for AEs & IEs
Appropriate Technologies for Soil & Slope Stabilization
ePace
BIMS Brochure
eAccess
The Motor Vehicles Act, 1988
The Central Motor Vehicles Rules, 1989
Tenders
Current Tenders
Tender Archive
eAuction
Current eAuction
Archive eAuction
Black List / Debarment
Termination
Negative List
Non-Performer
List of Banks
Links
Bank of Ideas
NHIDCL Email
INAM-Pro
INFRACON
BG Management
Bhoomirashi
eDMS
eOffice
SAP
PMIS
BiMS
eProcurement
Grievance Redressal
CPGRAMS
ePACE
India Investment Grid (IIG)
eSamiksha Monitoring
eSamiksha Review
eSuvidha
Ministry of Road Transport & Highways
OCMS
VIP References
IAHE
National Highways Authority of India
IRC
Ministry of External Affairs
Ministry of Shipping
MSME SAMBANDH
Events
Images
Videos
Official Language Gallery
Web Portal Videos
Presentation
Employee Portal
Career
Current Openings
Opening Archive
Contact
Corporate Office
Details of NHIDCL Officers & Staff on Deputation/ Contract
Field Offices
Feedback
Home
About
About Us
Our Organisation
Who’s who
Our Mission
Our Vision
Honourable Minister’s Message
Annual Report
2021-2022
2020-2021
2019-2020
2018-2019
2017-2018
2016-2017
2015-2016
2014-2015
CSR
Annual Return of NHIDCL
2020
2021
2022
Skill Development Training Program
International Cooperation
RTI
GST Cell
MoA(Memorandum of Association) & Notices
Dispute Resolution Mechanism
Internal Complaints Committee (ICC)
Chief Vigilance officer (CVO)
Independent External Monitor (IEM)
Projects
Current Status
All States
Andaman & Nicobar
Arunachal Pradesh
Assam
Himachal Pradesh
Manipur
Meghalaya
Mizoram
Nagaland
Sikkim
Tripura
Union Territory of Jammu & Kashmir
Union Territory of Ladakh
Uttarakhand
West Bengal
Nepal
Project Archive
Maps
Andaman & Nicobar
Arunachal Pradesh
Assam
Himachal Pradesh
Manipur
Meghalaya
Mizoram
Nagaland
Sikkim
Tripura
Union Territory of Jammu & Kashmir
Union Territory of Ladakh
Uttarakhand
West Bengal
Nepal
e Book
NHIDCL 2016
NHIDCL 2015
Guidelines on LA
Infracon
INAM-Pro
INAM-Pro Brochure
BGMS
Sugampath
IT Task Force
Essential Safety for Hill Roads
Standardization of Reporting Responsibilities for AEs & IEs
Appropriate Technologies for Soil & Slope Stabilization
ePace
BIMS Brochure
eAccess
The Motor Vehicles Act, 1988
The Central Motor Vehicles Rules, 1989
Tenders
Current Tenders
Tender Archive
eAuction
Current eAuction
Archive eAuction
Black List / Debarment
Termination
Negative List
Non-Performer
List of Banks
Links
Bank of Ideas
NHIDCL Email
INAM-Pro
INFRACON
BG Management
Bhoomirashi
eDMS
eOffice
SAP
PMIS
BiMS
eProcurement
Grievance Redressal
CPGRAMS
ePACE
India Investment Grid (IIG)
eSamiksha Monitoring
eSamiksha Review
eSuvidha
Ministry of Road Transport & Highways
OCMS
VIP References
IAHE
National Highways Authority of India
IRC
Ministry of External Affairs
Ministry of Shipping
MSME SAMBANDH
Events
Images
Videos
Official Language Gallery
Web Portal Videos
Presentation
Employee Portal
Career
Current Openings
Opening Archive
Contact
Corporate Office
Details of NHIDCL Officers & Staff on Deputation/ Contract
Field Offices
Feedback
Home
About
About Us
Our Organisation
Who’s who
Our Mission
Our Vision
Honourable Minister’s Message
Annual Report
2021-2022
2020-2021
2019-2020
2018-2019
2017-2018
2016-2017
2015-2016
2014-2015
CSR
Annual Return of NHIDCL
2020
2021
2022
Skill Development Training Program
International Cooperation
RTI
GST Cell
MoA(Memorandum of Association) & Notices
Dispute Resolution Mechanism
Internal Complaints Committee (ICC)
Chief Vigilance officer (CVO)
Independent External Monitor (IEM)
Projects
Current Status
All States
Andaman & Nicobar
Arunachal Pradesh
Assam
Himachal Pradesh
Manipur
Meghalaya
Mizoram
Nagaland
Sikkim
Tripura
Union Territory of Jammu & Kashmir
Union Territory of Ladakh
Uttarakhand
West Bengal
Nepal
Project Archive
Maps
Andaman & Nicobar
Arunachal Pradesh
Assam
Himachal Pradesh
Manipur
Meghalaya
Mizoram
Nagaland
Sikkim
Tripura
Union Territory of Jammu & Kashmir
Union Territory of Ladakh
Uttarakhand
West Bengal
Nepal
e Book
NHIDCL 2016
NHIDCL 2015
Guidelines on LA
Infracon
INAM-Pro
INAM-Pro Brochure
BGMS
Sugampath
IT Task Force
Essential Safety for Hill Roads
Standardization of Reporting Responsibilities for AEs & IEs
Appropriate Technologies for Soil & Slope Stabilization
ePace
BIMS Brochure
eAccess
The Motor Vehicles Act, 1988
The Central Motor Vehicles Rules, 1989
Tenders
Current Tenders
Tender Archive
eAuction
Current eAuction
Archive eAuction
Black List / Debarment
Termination
Negative List
Non-Performer
List of Banks
Links
Bank of Ideas
NHIDCL Email
INAM-Pro
INFRACON
BG Management
Bhoomirashi
eDMS
eOffice
SAP
PMIS
BiMS
eProcurement
Grievance Redressal
CPGRAMS
ePACE
India Investment Grid (IIG)
eSamiksha Monitoring
eSamiksha Review
eSuvidha
Ministry of Road Transport & Highways
OCMS
VIP References
IAHE
National Highways Authority of India
IRC
Ministry of External Affairs
Ministry of Shipping
MSME SAMBANDH
Events
Images
Videos
Official Language Gallery
Web Portal Videos
Presentation
Employee Portal
Career
Current Openings
Opening Archive
Contact
Corporate Office
Details of NHIDCL Officers & Staff on Deputation/ Contract
Field Offices
Feedback
Tender Evaluation Result 2018
Tender Evaluation
Result 2018
Technical Evaluation Result for invitation of RFP for DPR consultancy services for western bypass. Dated: 27-12-18.
Opening of financial bid for Hunli-Anini AE Project in the state of Arunachal Pradesh.Dated: 27-12-18.
Financial Bid Opening For Consultancy Services for Authority’s Engineer for Supervision of “Two lane with hard shoulders of Chakabama-Zunheboto Road from (i) Design Km 50.000 to Km 75.000 (Existing Km 52.370 to Km 79.040) (ii) Design Km 75.000 to Km 95.000 (Existing Km 79.040 to Km 100.345) (iii) Design Km 95.000 to Km 115.534 (Existing Km 100.345 to Km 122.250)” in the state of Nagaland under SARDP-NE on EPC Mode. Dated: 27-12-18.
Technical Evaluation result for Consultancy Service for Authority’s Engineer for (i) Construction of alternative highway (Package-IVA from 0.00 to 13.00 of Bagrakot-Kafer section of NH-717A on EPC mode in state of West Bengal (ii) Construction of alternative highway (Package-IVB from 13.00 to 25.60 of Bagrakot-Kafer section of NH-717A on EPC mode in state of West Bengal (iii) Construction of alternative highway (Package-IVD from 26.10 to 40.00 of Bagrakot-Kafer section of NH-717A on EPC mode in state of West Bengal (iv) Construction of alternative highway (Package-IVC from 25.60 to 26.10 of Bagrakot-Kafer section of NH-717A on EPC mode in state of West Bengal (v) Construction of Mechi Bridge and Approaches on India-Nepal border linking Kakarvitta in Nepal and Panitanki in India under Engineering Procurement and Construction (EPC) Mode. Dated: 26-12-2018.
Technical Evaluation result for “Widening and up-gradation to 2-Lane with paved shoulder configuration and geometric improvements from km 166.00 to km 208.00 (Package-4) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on Engineering, Procurement and Construction (EPC) mode with JICA loan assistance “. Dated: 24-12-2018.
Technical Evaluation result for “Widening and up-gradation to 2-Lane with paved shoulder configuration and geometric improvements from km 208.00 to km 250.00 (Package-5) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on Engineering, Procurement and Construction (EPC) mode with JICA loan assistance “.Dated: 24-12-2018.
Technical Evaluation result for Widening and up-gradation to 2-Lane with paved shoulder configuration and geometric improvements from km 298.00 to km 339.00 (Package-7) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on Engineering, Procurement and Construction (EPC) mode with JICA loan assistance. Dated: 21-12-2018.
Opening
of Financial Bid for Operation and Maintenance of 2-Lane Bi-Directional Silkyara Bend – Barkot Tunnel With Escape Passage Including Approaches On Dharasu Yamunotri. Dated: 18-12-2018.
Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for the following road stretches in the state of Jammu & Kashmiri)2 Laning of Mughal Road connecting Shopian with Bafliaz in Poonch District)a) 2-lane with Paved Shoulder of NH configuration for Baramulla-Gulmarg Road 1.b) 2 Lane Bypass from Donipawa to Ashajipora connecting NH-244 & NH-44. Dated: 13-12-18
.
Expression of Interest (EOI) for Authority\’s Engineer for Widening and up-gradation to 2-lane with paved shoulder configuration and geometric improvements of NH-54 in the State of Mizoram on Engineering, Procurement and Construction (EPC) mode, with Japan International Cooperation Agency (JICA) loan assistance, for three consultancy packages as per following stretches: (i) From km 8.000 to km 125.000 (comprising 2 Civil contract packages); (ii) From km 125.000 to km 250.000 (comprising 3 Civil contract packages); (iii) From km 250.000 to km 380.000 (comprising 3 Civil contract packages). Dated: 06-12-18.
The opening of financial bid for Hunli-Anini AE Project in the state of Arunachal Pradesh.Dated: 03-12-18.
Technical Evaluation Result Construction of Rooftop Cafe at the terrace level of Automated Multilevel Car Parking at Transport Bhawan,1, Parliament Street, New Delhi.Dated: 03-12-18.
Technical Evaluation Result Construction and Upgradation including specialized slope treatment of existing road to 2-lane with the paved shoulder from existing km. 458.900 to km. 459.475 (design ch 456.200 to ch 456.800) of Patalganga landslide of NH-07 under Chardham Pariyojna on EPC basis in the state of Uttarakhand. (Design length = 0.600 km) Dated: 30-11-18.
Technical Evaluation Result Construction and Upgradation including specialized slope treatment and augment of existing road from Km. 379+100 to Km. 380+275 (approx. 1.175 km) on Gholteer Landslide of National Highway No. 07 (hereinafter called the “NH-07”) in the state of Uttarakhand Dated: 30-11-18
.
Financial Bid Opening For Consultancy Services for Authority’s Engineer for Supervision of “Two lane with hard shoulders of Chakabama-Zunheboto Road from (i) Design Km 0.000 to Km 25.000 (Existing Km 0.000 to Km 25.760) (ii) Design Km 25.000 to Km 50.000 (Existing Km 25.760 to Km 52.370) ” in the state of Nagaland under SARDP-NE on EPC Mode. Dated: 29-11-18
Technical Evaluation Result For Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of “In- Principle” declared NH in the Car Nicobar Island under the Union Territory of Andaman & Nicobar Island. Dated: 28-11-18.
Technical Evaluation Result For Periodical Renewal for Rangpo-Gangtok section for Km 52+000 to Km 80+000(Excluding Km 63.00 to Km 66.00 and Km 69.00 to Km 72.00) of NH-10 including raising in 200 m length in Sinking area in Km 80 in the state of Sikkim Dated: 20-11-2018.
Technical Score for Selection of agency/ agencies for entering into Annual Rate Contract for providing services of Designing, Printing of document(s) such as Books/ Annual Report(s), Booklets, Flyers, Leaflets, File Covers, Visiting Cards, Invitation Cards (including envelops), Conference ID Cards, etc., for NHIDCL, New Delhi.Dated: 25-10-18.
Technical Evaluation Result for Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of National Highway No. 217(Paikan-Tura Section) in the state of Assam/Meghalaya. Dated: 22-10-18 .
Technical Evaluation result for Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of new National Highways (Guwahati-Jorabat bypass) in the state of Assam. Dated: 22-10-18.
Technical Evaluation Result of Consultancy Services for Authority’s Engineer for Supervision of Construction, Operation and Maintenance of 2-lane Bi-Directional Silkyara Bend –Barkot Tunnel with escape passage including approaches on Dharasu- Yamunotri section between Ch. 25.4 km and Ch. 51.0 km falling along NH-134 (old NH-94) in the State of Uttarakhand” on Engineering Procurement and construction (EPC) mode. -Result of Technical Evalution & Cancellation Tender. Dated : 05-10-2018
Technical Result For Clearance of landslides in soil, ordinary rock and hard rock from Km 80.000 to 123.600 on Batote-Kishtwar – Sinthanpass road section of NH-244 in the State of Jammu & Kashmir (as and when required basis). Dated : 01-10-2018
Technical Result For Clearance of landslides in soil, ordinary rock and hard rock from Km 25.000 to 80.000 on Batote-Kishtwar – Sinthanpass road section of NH-244 in the State of Jammu & Kashmir (as and when required basis). Dated : 01-10-2018
Technical Result For Clearance of landslides in soil, ordinary rock and hard rock from Km 123.600 to 170.000 on Batote-Kishtwar – Sinthanpass road section of NH-244 in the State of Jammu & Kashmir (as and when required basis). Dated : 01-10-2018
Technical Result For Clearance of landslides in
soil, ordinary rock and hard rock from Km 0.000 to 25.000 on Batote-Kishtwar – Sinthanpass road section of NH-244 in the State of Jammu & Kashmir (as and when required basis). Dated : 01-10-2018
Opening of Financial Bids for the Project of Consultancy Services for Authority’s Engineer for Supervision of “Two- lane with hard shoulders of Pfutsero-Phek Road from: (i) Design Km 0.000 to Km 20.000 (Existing Km 0.000 to Km 19.900) (ii) Design Km 20.000 to Km 40.000 (Existing Km 19.900 to Km 40.090) (iii) Design Km 40.000 to Km 62.558 (Existing Km 40.090 to Km 65.300)” in state of Nagaland under SARDP-NE on EPC mode. Dated : 18-09-2018
Technical Result for the Project of Consultancy Services for Authority’s Engineer for Supervision of Construction, Operation and Maintenance of 2-lane Bi-Directional Silkyara Bend –Barkot Tunnel with escape passage including approaches on Dharasu- Yamunotri section between Ch. 25.4 km and Ch. 51.0 km falling along NH-134 (old NH-94) in the State of Uttarakhand. Dated : 18-09-2018
Technical Score For The Project of Consultancy Services for Authority’s Engineer for – (i) Construction and Upgradation of existing road to 2-lane with paved shoulder from Km. 368.000 to Km. 399.000 of Lameri to Karanprayag (Excluding Km. 379.100 to Km 380.275) of NH-07 under Chardham Pariyojna on EPC basis in the State of Uttarakhand. (ii) Construction and Upgradation of existing road to 2-lane with paved shoulder from Km 399.000 to Km. 430.000 of Karanpyarag to Chamoli (Excluding Km 420.250 to Km 420.500 and Km 423.300 to km 423.650) of NH-07 under Chardham Pariyojna on EPC basis in the State of Uttarakhand. (iii) Construction and Upgradation of existing road to 2-lane with paved shoulder from Km 430.000 to Km. 468.000 of Chamoli to Paini (Excluding Km 437.625 to Km 437.775, Km 458.900 to Km 459.475 and Km 464.425 to Km 464.525) of NH-07 under Chardham Pariyojna on EPC basis in the State of Uttarakhand. (iv) Construction and Upgradation of existing road to 2-lane with paved shoulder from Km 458.900 to Km 459.475 of Patalganga Landslide (Design km 456.200 to Km 456.800) of NH-07 under Chardham Paryojna on EPC Mode in the State of Uttarakhand (Design Length = 0.600 Km). (V) Construction and Upgradation of existing road to 2-lane with paved shoulder from Km 379.100 to Km 380.275 of Gholtir landslide (Design Km 378.900 to Km 380.075) of NH-07 under Chardham Paryojna on EPC basis in the State of Uttarakhand (Design Length – 1.175 Km). Dated : 11-09-2018
Technical Score For The Project of Consultancy Services for Authority’s Engineer for Supervision of “Two- lane with hard shoulders of Pfutsero-Phek Road from: (i) Design Km 0.000 to Km 20.000 (Existing Km 0.000 to Km 19.900) (ii) Design Km 20.000 to Km 40.000 (Existing Km 19.900 to Km 40.090) (iii) Design Km 40.000 to Km 62.558 (Existing Km 40.090 to Km 65.300)” in state of Nagaland under SARDP-NE on EPC mode. Dated : 10-09-2018
Technical Evaluation Result For The Project of Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for construction of new 2-lane Road Bridge across River Brahmaputra in Jogighopa in the State of Assam. Dated : 07-09-2018
Final Composite Score For The Project of Selection of agency for providing services of Housekeeping staff and Security Guards in NHIDCL Headquarters, New Delhi. Dated : 05-09-2018
2nd Stage Re-Evaluation Result For The Project of Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of newly declared National Highway, Tharthri-Kahaljugasar-Kilhotran (70 km, District- Doda, J&K) to Makhan-Chachool (10 km, District- Chamba, Himachal Pradesh) to 2-lane with paved shoulder including Feasibility study cum DPR of Tunnel of approx. length 4 km near Kahaljugasar in the state of Jammu and Kashmir. Dated : 28-08-2018
Final Technical Evaluation Result For The Project of Consultancy Services For preparation of Detailed Project Report for Development of Multi Modal Logistic Park at Jogighopa (Assam). Dated : 23-08-2018
Final Score for the Tender of Selection of Manpower Placement Agency for providing Technical personnel for working in NHIDCL Headquarters, New Delhi/ Branch Offices located across India, Ministry of Road Transport and Highways and at places where NHIDCL has been asked to provide such human resources. Dated : 20-08-2018
2nd Stage Technical Evaluation Result For The Project of Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of newly declared National Highway, Tharthri-Kahaljugasar-Kilhotran (70 km, District- Doda, J&K) to Makhan-Chachool (10 km, District- Chamba, Himachal Pradesh) to 2-lane with paved shoulder including Feasibility study cum DPR of Tunnel of approx. length 4 km near Kahaljugasar in the state of Jammu and Kashmir. Dated : 09-08-2018
Technical Evaluation Result For The Project of Short term improvement & Routine maintenance of Imphal- Jiribam road NH-37 from km 3.00 to km 75.00 (length 72.00km) in the State of Manipur on Item Rate Basis. Dated : 07-08-2018
Technical Evaluation Score for the Project of Selection of agency for providing services of Housekeeping staff and Security Guards in NHIDCL Headquarters, New Delhi. Dated : 07-08-2018
Technical Evaluation Result For The Project of Short term improvement & Routine maintenance of Imphal- Jiribam road NH-37 from km 75.00 to km 145.00 (length 70.00km) in the State of Manipur on Item Rate Basis (Package-II) Dated : 25-07-2018
Technical Evaluation Result For The Project of Supplying, Installation & Commissioning of Fire Fighting System from Automated Car Parking Building in Transport Bhawan to Pump Room of Shram Shakti Bhawan at Connaught Place,New Delhi. Dated : 19-07-2018
2nd Stage Evaluation Result for the Project of Consultancy Services for Authority’s Engineer for Supervision of “(i) Up-gradation to 4-lane with Paved Shoulder of Jammu-Akhnoor road section of NH-144A from Canal head (Km 0.800) to Ganesh Vihar (Km 6.000) of 5.2 Km length (ii) Up-gradation to 4-lane with Paved Shoulder of Jammu-Akhnoor road section of NH-144A from Ganesh Vihar (Km 6.000) to Hanuman chowk (Km 30.097) of 24.097 Km length in the state of Jammu and Kashmir to be executed on EPC basis. (iii) Consultancy Services for Widening and Up-gradation to 2 lane with paved shoulder configuration and geometric improvement from km 0.000 to km 16.990 on Chenani – Sudhmahadev section of NH-244 in the state of Jammu and Kashmir to be executed on EPC basis”. Dated : 16-07-2018
Technical Result For The Project of Restoration of Road by way of clearance of consolidated slips, surface boulders, side drain, culverts including construction of Retaining wall and Breast walls and fixing of Traffic sign board & Kilometer stones on Khellani-Hambal-Goha-Dranga (km 0.000 to km 29.800) in the state of Jammu & Kashmir. Dated : 06-07-2018
Technical Evaluation Result For The Project of Consultancy Services for preparation of Detailed Project Report and Pre-Construction activities for Construction of 4 nos. of bypasses at Chhiathlang, Serchhip, Hnathial and Lawngtlai on Aizawl-Tuipang section of NH-54 in the state of Mizoram Dated : 05-07-2018
Revised Technical Evaluation Result For The Project of Consultancy Services for Authority’s Engineer for Supervision of “Two- lane with hard shoulders of Merangkong-Tamlu-Mon Road from: (i) Design Km 0.000 to Km 20.000 (Existing Km 0.000 to Km 20.456) (ii) Design Km 20.000 to Km 40.000 (Existing Km 20.456 to Km 41.065) (iii) Design Km 40.000 to Km 59.000 (Existing Km 41.065 to Km 60.345) (iv) Design Km 59.000 to Km 86.835 (Existing Km 60.345 to Km 98.065)” in state of Nagaland under SARDP-NE on EPC mode. Dated : 05-07-2018
Technical Result For The Project of Up-gradation to 4-lane with Paved Shoulder of Jammu-Akhnoor road section of NH-144A from Ganesh Vihar (Km 6.000) to Hanuman chowk (Km 30.000) of 24 Km length in the state of Jammu and Kashmir to be executed on EPC basis. Dated : 03-07-2018
Technical Evaluation Result For The Project Of Short Term Improvement & Routine Maintenance From Km. 52.000 To Km. 80.000 Of NH-10 In The State Of Sikkim On Percentage Rate Basis. Dated : 03-07-2018
Technical Evaluation Result for the Project of Short term improvement & Routine maintenance of Imphal- Jiribam road NH-37 from km 145.00 to km 220.00 (length 75.00km) in the State of Manipur on Item Rate Basis (Package- III) Dated : 22-06-2018
Revised Technical Evaluation Result for the Project of Restoration / Reconstruction of Churachandpur-Tipaimukh road from km 185.00 (Bukpi) to Km 262.00 (Tipaimukh) in the state of Manipur on EPC mode. Dated : 19-06-2018
1st Stage Re-Evaluation Result for the Project of Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of newly declared National Highway, Tharthri-Kahaljugasar-Kilhotran (70 km, District- Doda, J&K) to Makhan-Chachool (10 km, District- Chamba, Himachal Pradesh) to 2-lane with paved shoulder including Feasibility study cum DPR of Tunnel of approx. length 4 km near Kahaljugasar in the state of Jammu and Kashmir Dated : 21-06-2018
Technical Evaluation Result for the Project of Consultancy Services for Authority’s Engineer for Supervision of Rehabilitaion / Maintenance of newly entrusted Churachandpur-Singhat-Sinzawl Tuivai road section from (i) Km 0.00 to km 34.5 (ii) Km 34.5 to Km 103.1 and (iii) Km 103.1 to Km 161.48 on NH-102B and Churachandpur-Tipaimukh road from km 185.00 to Km 262.00 (Package-II) on EPC basis in the state of Manipur. Dated : 19-06-2018
Revised Technical Evaluation Result for the Project of Consultancy services for Authority’s Engineer for Supervision of Four Laning of Imphal – Moreh Section of NH 39 from Km 330.000 to Km 350.000 in the State of Manipur (Contract Package I) and Two Laning of Imphal – Moreh Section of NH 39 from Km 350.000 to Km 395.680 in the State of Manipur (Contract Package II) under Engineering Procurement and Construction (EPC) Mode. Dated : 14-06-2018
Technical Evaluation Result for the Project of Restoration/Reconstruction of Churachandpur-Tipaimukh road from km 185.00 (Bukpi) to Km 262.00 (Tipaimukh) in the state of Manipur on EPC mode. Dated : 12-06-2018
Technical Evaluation Result for the Project of Consultancy Services for preparation of DPR for development of Economic Corridors and International Connectivity Routes to improve the efficiency of freight movement in the state of Mizoram under Bharatmala Pariyojana (Lot-2) (Package-II). Dated : 12-06-2018
Technical Evaluation Result for the Project of Consultancy Services for preparation of DPR for development of Economic Corridors and International Connectivity Routes to improve the efficiency of freight movement in the state of Nagaland under Bharatmala Pariyojana (Lot-2) (Package-I). Dated : 12-06-2018
1st Stage Evaluation Result for the Project of Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of newly declared National Highway, Tharthri-Kahaljugasar-Kilhotran (70 km, District- Doda, J&K) to Makhan-Chachool (10 km, District- Chamba, Himachal Pradesh) to 2-lane with paved shoulder including Feasibility study cum DPR of Tunnel of approx. length 4 km near Kahaljugasar in the state of Jammu and Kashmir. Dated : 11-06-2018
Technical Evaluation Result for the Project of Two Laning of Imphal – Moreh Section of NH 39 from Km 350.000 to Km 395.680 in the State of Manipur (Contract Package II) under Engineering Procurement and Construction (EPC) Mode Dated : 01-06-2018
Technical Evaluation Result for the Project of Fixing of Main and Intermediate Boundary Pillars for demarcation of ROW along NH-54 (2-Lane with paved shoulder) from km 8.00 to km 380.00 in the State of Mizoram. Dated : 30-05-2018
Revised Technical Evaluation Result for the Project of Construction, Operation and Maintenance of 2-Lane BiDirectional Silkyara Bend – Barkot Tunnel With Escape Passage Including Approaches On DharasuYamunotri Section Between Ch. 25.400 Km And Ch. 51.000 Km Falling Along NH-134 (OLD NH-94)in the State Of Uttarakhand on EPC mode” Dated : 29-05-2018
Technical Evaluation Result for the Project of Selection Of Consultants/ Ngos To Assist In Implementation Of Resettlement Action Plan For : Widening to Two lane with Geometric Improvements of Tura Dalu road from Km 85.00 to 95.00 & 101.00 to 145.00 to 2-lanes with paved shoulder of Tura-Dalu section of NH51 in the state of Meghalaya on Engineering, Procurement and Construction (EPC) mode, with Japan International Cooperation Agency (JICA) loan assistance on EPC Mode. Dated : 24-05-2018
Technical Evaluation Result for the Project of Consultancy Services for Authority’s Engineer for Supervision of “Two- lane with hard shoulders of Pfutsero-Phek Road from: (i) Design Km 0.000 to Km 20.000 (Existing Km 0.000 to Km 19.900) (ii) Design Km 20.000 to Km 40.000 (Existing Km 19.900 to Km 40.090) (iii) Design Km 40.000 to Km 62.558 (Existing Km 40.090 to Km 65.300)” in state of Nagaland under SARDP-NE on EPC mode. Dated : 24-05-2018
Technical Evaluation Result for the Project of Construction, Operation and Maintenance of 2-Lane BiDirectional Silkyara Bend – Barkot Tunnel With Escape Passage Including Approaches On DharasuYamunotri Section Between Ch. 25.400 Km And Ch. 51.000 Km Falling Along NH-134 (OLD NH-94)in the State Of Uttarakhand on EPC mode. Dated : 21-05-2018
Technical Evaluation Result for the Project of Short term improvement & Routine maintenance of Ukhrul- Jessami-Nagaland Border (km 126) in the state of Manipur on Item rate basis. Dated : 14-05-2018
Technical Evaluation Result for the Project of Selection Of Consultants/ NGOs To Assist In Implementation of Resettlement Action Plan For: (i) Widening and upgradation to 2-lane with paved shoulder configuration and geometric improvements from km 8.0 to km 380.0 on Aizawl-Tuipang section of NH-54 in the State of Mizoram and (ii) Construction of 4 nos. of bypasses at Chhiathlang, Serchhip, Hnathial and Lawngtlai on this highway on Engineering, Procurement and Construction (EPC) mode, with Japan International Cooperation Agency (JICA) loan assistance. Dated : 11-05-2018
Technical Evaluation Score for the Project of Consultancy Services for Authority’s Engineer for Supervision of “Two- lane with hard shoulders of Merangkong-Tamlu-Mon Road from: (i) Design Km 0.000 to Km 20.000 (Existing Km 0.000 to Km 20.456) (ii) Design Km 20.000 to Km 40.000 (Existing Km 20.456 to Km 41.065) (iii) Design Km 40.000 to Km 59.000 (Existing Km 41.065 to Km 60.345) (iv) Design Km 59.000 to Km 86.835 (Existing Km 60.345 to Km 98.065)” in state of Nagaland under SARDP-NE on EPC mode. Dated : 10-05-2018
Final Technical Score for the Project of Consultancy services for Authority’s Engineer for Supervision of “Construction, Operation and Maintenance of 2-Lane bi-directional Zojila Tunnel with Parallel Escape (Egress) Tunnel excluding approaches on Srinagar-Leh Section connecting NH-1A at Km 95.00 And At Km 118.00 in the State of Jammu & Kashmir on EPC Mode”. Dated : 10-05-2018
Technical Evaluation Result for the Project of Consultancy Services for Authority’s Engineer for Supervision of “Two- lane with hard shoulders of Merangkong-Tamlu-Mon Road from: (i) Design Km 0.000 to Km 20.000 (Existing Km 0.000 to Km 20.456) (ii) Design Km 20.000 to Km 40.000 (Existing Km 20.456 to Km 41.065) (iii) Design Km 40.000 to Km 59.000 (Existing Km 41.065 to Km 60.345) (iv) Design Km 59.000 to Km 86.835 (Existing Km 60.345 to Km 98.065)” in state of Nagaland under SARDP-NE on EPC mode. Dated : 07-05-2018
Revised Technical Result for the Project of Consultancy services for Authority’s Engineer for Supervision of Four Laning of Imphal – Moreh Section of NH 39 from Km 330.000 to Km 350.000 in the State of Manipur (Contract Package I) and Two Laning of Imphal – Moreh Section of NH 39 from Km 350.000 to Km 395.680 in the State of Manipur (Contract Package II) under Engineering Procurement and Construction (EPC) Mode. Dated : 24-04-2018
Technical Result for the Project of Consultancy Services For Authority’s Engineer For (i) Protection works at Nalupani Landslide Zone (Ex.km 123+080 to km. 123+480, km 123+665 to km 123+740 and km 123+770 to km 123+970) Section of NH-34 in the State of Uttarakhand on EPC basis. (ii) Construction of Road, Bridge and Slope Protection works of Landslide at Bareti (Ex. Km. 100.300 to km 101.600 of Section NH-34 in the State of Uttarakhand on EPC basis. Dated : 23-04-2018
Technical Evaluation Result for the Project of Improvement By Overlay Of The Stretch From Km 21.00 To Km 28.00 On NH-4 (Old NH-223) n The Union Teritory Of Andaman & Nicobar Islands. Dated : 16-04-2018
Financial Evalution Result for the Project of Empanelment of Travel Agents for Booking of Tickets for Domestic and International Air and Railway Journey. Dated : 13-04-2018
Technical Evaluation Result for the Project of Empanelment of Travel Agents for Booking of Tickets for Domestic and International Air and Railway Journey. Dated : 11-04-2018
Technical Evaluation Result for the Project of Urgent repairs of Hiller Bridge in District Anantnag on Kishtwar Sinthanpass – Khanabal Road, NH-244 in the state of Jammu & Kashmir. Dated : 06-04-2018
Technical Evaluation Result for the Project of Demolition of collapsed Bidhar bridge at km 229.530 on Sinthanpass Khanabal section of NH-244 in the State of Jammu & Kashmir. Dated : 06-04-2018
Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF CHAKABAMA ZUNHEBOTO ROAD ON EPC BASIS FROM EXISTING KM 100.345 TO KM 122.250 [DESIGN KM. 95.000 TO KM. 115.534] (DESIGN LENGTH – 25.534 KM) IN THE STATE OF NAGALAND UNDER SARDP-NE ON EPC MODE. Dated : 26-03-2018
Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF CHAKABAMA ZUNHEBOTO ROAD ON EPC BASIS FROM EXISTING KM 79.040 TO KM 100.345 [DESIGN KM. 75.000 TO KM. 95.000 (DESIGN LENGTH – 20.000 KM) IN THE STATE OF NAGALAND UNDER SARDP-NE ON EPC MODE. Dated : 26-03-2018
Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF MERANGKONG-TAMLU-MON ROAD ON EPC BASIS FROM EXISTING KM 41.065 TO KM 60.345 [DESIGN KM. 40.000 TO KM. 59.000] (DESIGN LENGTH – 19.00 KM) IN THE STATE OF NAGALAND UNDER SARDP-NE ON EPC MODE. Dated : 26-03-2018
Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF MERANGKONG-TAMLU-MON ROAD ON EPC BASIS FROM EXISTING KM 60.345 TO KM 98.065 [DESIGN KM. 59.000 TO KM. 86.835] (DESIGN LENGTH – 27.835 KM) IN THE STATE OF NAGALAND UNDER SARDP-NE ON EPC MODE. Dated : 26-03-2018
Technical Evaluation Result for the Project of Construction of alternative highway to Gangtok in Sikkim via Bagrakot — Chuikhim — Nimbong — Kafer — Bakhim — Algarah — Rhenok in the State of West Bengal and from Rhenok — Rorathang — Pakyong along with spur from Aritar — Rolep — Menla in the State of Sikkim (Package No. IVA from Km 0.00 to Km 13.00 of Bagrakot — Kafer section of NH 717A on EPC Mode under Phase A of SARDP-NE in the State of West Bengal). Dated : 23-03-2018
Revised Technical Evaluation Result for the Project of REQUEST FOR PROPOSAL (RFP) FOR “WIDENING TO 2-LANE WITH GEOMETRIC IMPROVEMENTS OF TURA DALU ROAD FROM KM 85.000 TO 95.000 & 101.000 TO 145.000 TO 2-LANES WITH PAVED SHOULDER OF TURA–DALU SECTION OF NH-51 IN THE STATE OF MEGHALAYA WITH JAPAN INTERNATIONAL COOPERATION AGENCY (JICA) LOAN ASSISTANCE. Dated : 22-03-2018
Final Evaluation Result for the Project of Improvement & Rehabilitation of existing Indira Bye Pass road form Km 0.000 to km 10.117 on NH-10 in the State of Sikkim on Item Rate Basis (Retender). Dated : 22-03-2018
Technical Evaluation Result for the Project of WIDENING TO 2-LANE WITH GEOMETRIC IMPROVEMENTS OF TURA DALU ROAD FROM KM 85.000 TO 95.000 & 101.000 TO 145.000 TO 2-LANES WITH PAVED SHOULDER OF TURA–DALU SECTION OF NH-51 IN THE STATE OF MEGHALAYA WITH JAPAN INTERNATIONAL COOPERATION AGENCY (JICA) LOAN ASSISTANCE. Dated : 20-03-2018
Technical Result for the Project of Special Repair Works At Narrow zone and Landslide Area Between Rangpo and Ranipool on NH-10 in the State of Sikkim on EPC Basis. Dated : 20-03-2018
Final Technical Score for the Project of Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities: (i) For construction of Approach Roads with Avalanche Protection Works to West and East portal of the proposed Zojila Tunnel between (between Baltal and Minamarg) from km 82.00 to km 95.00 on Srinagar-Leh road (NH-1) and; (ii) For making the NH-1 from Z-Morh Tunnel to proposed Zojila Tunnel (approx. 20 km) all weather road in the State of Jammu & Kashmir. Dated : 20-03-2018
Technical Result for the Project of Widening and upgradation to 2 lane with paved shoulder configuration and geometric improvement from km 0.000 to km 16.990 on Chenani – Sudhmahadev section of NH-244 in the State of Jammu & Kashmir On EPC Mode. Dated : 20-03-2018
Revised Technical Evaluation Result for the Project of Improvement & Rehabilitation of Kapur more at Km 70.00 on NH-10 in the State of Sikkim on Item Rate Basis. Dated : 20-03-2018
Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF CHAKABAMA ZUNHEBOTO ROAD ON EPC BASIS FROM EXISTING KM 52.370 TO KM 79.040 [DESIGN KM. 50.000 TO KM. 75.000] (DESIGN LENGTH – 25.000 KM) IN THE STATE OF NAGALAND UNDER SARDP-NE ON EPC MODE. Dated : 19-03-2018
Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF CHAKABAMA ZUNHEBOTO ROAD ON EPC BASIS FROM EXISTING KM 00.000 TO KM 25.760 [DESIGN KM. 00.000 TO KM. 25.000] (DESIGN LENGTH – 25.00 KM) IN THE STATE OF NAGALAND UNDER SARDP-NE ON EPC MODE. Dated : 19-03-2018
Technical Evaluation Result for the Project of Construction of alternative highway to Gangtok in Sikkim via Bagrakot — Chuikhim — Nimbong — Kafer — Bakhim — Algarah — Rhenok in the State of West Bengal and from Rhenok — Rorathang — Pakyong along with spur from Aritar — Rolep — Menla in the State of Sikkim (Package No. IVB from Km 13.00 to Km 25.60 of Bagrakot — Kafer section of NH 717A on EPC Mode under Phase A of SARDP-NE in the State of West Bengal). Dated : 19-03-2018
Technical Result for the Project of Construction and Upgradation of existing road to 2-lane with paved shoulder from Km 399.000 to Km. 430.000 of Karanpyarag to Chamoli (Excluding Km 420.250 to Km 420.500 and Km 423.300 to km 423.650) of NH-07 under Chardham Pariyojna on EPC basis in the state of Uttarakhand. (Design Length – 28.80 Km). Dated : 19-03-2018
Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF MERANGKONG-TAMLU-MON ROAD ON EPC BASIS FROM EXISTING KM 20.456 TO KM 41.065 [DESIGN KM. 20.000 TO KM. 40.000] (DESIGN LENGTH – 20.00 KM) IN THE STATE OF NAGALAND UNDER SARDP-NE ON EPC MODE. Dated : 16-03-2018
Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF CHAKABAMA ZUNHEBOTO ROAD ON EPC BASIS FROM EXISTING KM 25.760 TO KM 52.370 [DESIGN KM. 25.000 TO KM. 50.000] (DESIGN LENGTH – 25.00 KM) IN THE STATE OF NAGALAND UNDER SARDP-NE ON EPC MODE. Dated : 16-03-2018
Technical Evaluation Result for the Project of Two Laning of Imphal – Moreh Section of NH 39 from Km 350.000 to Km 395.680 in the State of Manipur (Contract Package II) under Engineering Procurement and Construction (EPC) Mode Dated : 16-03-2018
Technical Evaluation Result for the Project of Four Laning of Imphal – Moreh Section of NH 39 from Km 330.000 to Km 350.000 in the State of Manipur (Contract Package I) under Engineering Procurement and Construction (EPC) Mode Dated : 16-03-2018
Technical Result for the Project of Construction and Upgradation of existing road to 2-lane with paved shoulder from Km. 368.000 to Km. 399.000 of Lameri to Karanprayag (Excluding Km. 379.100 to Km 380.275) of NH-07 under Chardham Pariyojna on EPC basis in the state of Utttarakhand (Design Length – 29.125 Km). Dated : 16-03-2018
Technical Result for the Project of Construction and Upgradation of existing road to 2-lane with paved shoulder from Km 430.000 to Km. 468.000 of Chamoli to Paini (Excluding Km 437.625 to Km 437.775, Km 458.900 to Km 459.475 and Km 464.425 to Km 464.525) of NH-07 under Chardham Pariyojna on EPC basis in the state of Uttarakhand. (Design Length – 36.675 Km). Dated : 16-03-2018
Technical Evaluation Result for the Project of Rehabilitation and Up-gradation of section from Km 206.000 to Km 239.445 (Nimbutala to Austin Creek) of NH-4 (Old NH-223) to 2-Lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands. Dated : 16-03-2018
Revised Technical Evaluation Result for the Project of Construction of alternative highway to Gangtok in Sikkim via Bagrakot — Chuikhim — Nimbong — Kafer — Bakhim — Algarah — Rhenok in the State of West Bengal and from Rhenok — Rorathang — Pakyong along with spur from Aritar — Rolep — Menla in the State of Sikkim (Package No. IVD from Km 26.10 to Km 40.00 of Bagrakot — Kafer section of NH 717A on EPC Mode under Phase A of SARDP-NE in the State of West Bengal). Dated : 15-03-2018
Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF MERANGKONG-TAMLU-MON ROAD ON EPC BASIS FROM EXISTING KM 00.000 TO KM 20.456 [DESIGN KM. 00.000 TO KM. 20.000] (DESIGN LENGTH – 20.00 KM) IN THE STATE OF NAGALAND UNDER SARDP-NE ON EPC MODE. Dated : 15-03-2018
Revised Technical Evaluation Result for the Project of Construction and upgradation of existing road to two lane with paved shoulder from Km 0.00 to Km 16.539 of Ranipool – Pakyong of NH-717-A on EPC basis under SARDP-NE in the State of Sikkim. Dated : 15-03-2018
Technical Evaluation Result for the Project of Special Repair work between Ranipool to Zero point from km 80.00 to km 93.00 of NH-10 in the State of Sikkim on Item Rate Basis” (Re-tender) Dated : 14-03-2018
Technical Evaluation Result for the Project of Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-1) (Package-III) Dated : 14-03-2018
Revised Technical Evaluation Result for the Project of Construction of Dimapur Bypass (Assam Portion) of 4/6 lane pavement on EPC basis from existing Km 159.400 of NH-36 to existing Km 102.500 of NH-39 and upto end point of Assam portion [Design Km 118.050 to design Km 132.375] (length 14.325 Km) in the State of Assam under Phase-A of SARDP-NE Dated : 14-03-2018
Technical Evaluation Result for the Project of Improvement & Rehabilitation of Kapur more at Km 70.00 on NH-10 in the State of Sikkim on Item Rate Basis”. (Retender) Dated : 14-03-2018
Technical Evaluation Result for the Project of “Improvement & Rehabilitation of existing Indira Bye Pass road form Km 0.000 to km 10.117 on NH-10 in the State of Sikkim on Item Rate Basis” (Retender) Dated : 14-03-2018
Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF PFUTSERO PHEK ROAD ON EPC BASIS FROM EXISTING KM 00.000 TO KM 19.900 [DESIGN KM. 00.000 TO KM. 20.000] (DESIGN LENGTH – 20.00 KM) IN THE STATE OF NAGALAND UNDER SARDP-NE ON EPC MODE. Dated : 13-03-2018
Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF PFUTSERO PHEK ROAD ON EPC BASIS FROM EXISTING KM 19.900 TO KM 40.090 [DESIGN KM. 20.000 TO KM. 40.000] (DESIGN LENGTH – 20.00 KM) IN THE STATE OF NAGALAND UNDER SARDP-NE ON EPC MODE. Dated : 13-03-2018
Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF PFUTSERO PHEK ROAD ON EPC BASIS FROM EXISTING KM 40.090 TO KM 65.300 [DESIGN KM. 40.000 TO KM. 62.558] (DESIGN LENGTH – 22.558 KM) IN THE STATE OF NAGALAND UNDER SARDP-NE ON EPC MODE. Dated : 13-03-2018
Technical Evaluation Result for the Project of Construction of Dimapur Bypass (Assam Portion) of 4/6 lane pavement on EPC basis from existing Km 159.400 of NH-36 to existing Km 102.500 of NH-39 and upto end point of Assam portion [Design Km 118.050 to design Km 132.375] (length 14.325 Km) in the State of Assam under Phase-A of SARDP-NE Dated : 13-03-2018
Technical Evaluation Result for the Project of Construction of alternative highway to Gangtok in Sikkim via Bagrakot — Chuikhim — Nimbong — Kafer — Bakhim — Algarah — Rhenok in the State of West Bengal and from Rhenok — Rorathang — Pakyong along with spur from Aritar — Rolep — Menla in the State of Sikkim (Package No. IVB from Km 13.00 to Km 25.60 of Bagrakot — Kafer section of NH 717A on EPC Mode under Phase A of SARDP-NE in the State of West Bengal). Dated : 13-03-2018
Technical Evaluation Result for the Project of Construction of alternative highway to Gangtok in Sikkim via Bagrakot — Chuikhim — Nimbong — Kafer — Bakhim — Algarah — Rhenok in the State of West Bengal and from Rhenok — Rorathang — Pakyong along with spur from Aritar — Rolep — Menla in the State of Sikkim (Package No. IVD from Km 26.10 to Km 40.00 of Bagrakot — Kafer section of NH 717A on EPC Mode under Phase A of SARDP-NE in the State of West Bengal). Dated : 13-03-2018
Technical Evaluation Result for the Project of Construction and upgradation of existing road to two lane with paved shoulder from Km 0.00 to Km 16.539 of Ranipool – Pakyong of NH-717-A on EPC basis under SARDP-NE in the State of Sikkim. Dated : 09-03-2018
Technical Result for the Project of Up-gradation to 4-lane with Paved Shoulder of Jammu-Akhnoor road section of NH-144A from Canal head (Km 0.800) to Ganesh Vihar (Km 6.000) of 5.2 Km length in the state of Jammu and Kashmir to be executed on EPC basis. Dated : 09-03-2018
Technical Score for the Project of Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities: (i) For construction of Approach Roads with Avalanche Protection Works to West and East portal of the proposed Zojila Tunnel between (between Baltal and Minamarg) from km 82.00 to km 95.00 on Srinagar-Leh road (NH-1) and; (ii) For making the NH-1 from Z-Morh Tunnel to proposed Zojila Tunnel (approx. 20 km) all weather road in the State of Jammu & Kashmir. Dated : 07-03-2018
Technical Result for the Project of Rehabilitation and up-gradation of section from Km 107.760 to Km 129.445 (After Middle strait to Humphrey), Km 130.600 to Km 138 (After Humphrey to Kadamtala) & Km 155.00 to Km 181.0 (End of Jarwa to Rangat) of NH-4 (Total length: 54.71 Km) to 2-Lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands On EPC Mode. Dated : 07-03-2018
Technical Evaluation Result for the Project of 2 LANING OF EXISTING HUNLI-ANINI FROM DESIGN KM 120.000 TO KM 130.300 (TOTAL LENGTH =10.300 KMS) IN THE STATE OF ARUNACHAL PRADESH ON EPC BASIS UNDER SARDP-NE ON EPC MODE. Dated : 06-03-2018
Technical Evaluation Result for the Project of Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-1) (Package-1B) Dated : 05-03-2018
Technical Evaluation Result for the Project of Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-1) (Package-1A)
Dated : 01-03-2018
Final Evaluation Result for the Project of Consultancy Services for Authority‟s Engineer for Supervision of “Four laning of Balachera to Harangajao section of NH-54(Ext) from km 275.000 to km 244.000 in the State of Assam on EPC mode”. Dated : 09-02-2018
Modified Technical Result for the Project of Restoration of Road by way of clearance of landslide, surface boulders side drain, culverts including construction of R/wall/Scuppers and laying of WBM-II, WBM-III, & Pre- Mixed Surfacing/Mixed seal Surfacing (PC) on Batote-Kishtwar-Chatroo- Sinthan top road NH-244 Km from Km 170.000 to Km 184.000 in the state of Jammu & Kashmir. Dated : 01-02-2018
Revised Technical Evaluation Result for the Project of Consultancy Services for Authority‟s Engineer for Supervision of “Four laning of Balachera to Harangajao section of NH-54(Ext) from km 275.000 to km 244.000 in the State of Assam on EPC mode. Dated : 31-01-2018
Technical Evaluation Result Cancellation Notice for the Project of Special Repair work between Ranipool to Zero point from km 80.00 to km 93.00 of NH-10 in the State of Sikkim on Item Rate Basis. Dated : 30-01-2018
Technical Result for the Project of Restoration of Road by way of clearance of landslide, surface boulders side drain, culverts including construction of R/wall/Scuppers and laying of WBM-II, WBM-III, & Pre- Mixed Surfacing/Mixed seal Surfacing (PC) on Batote-Kishtwar-Chatroo- Sinthan top road NH-244 Km from Km 170.000 to Km 184.000 in the state of Jammu & Kashmir. Dated : 25-01-2018
Technical Evaluation Result for the Project of Consultancy services for Authority’s Engineer for Supervision of Four Laning of Imphal – Moreh Section of NH 39 from Km 330.000 to Km 350.000 in the State of Manipur (Contract Package I) and Two Laning of Imphal – Moreh Section of NH 39 from Km 350.000 to Km 395.680 in the State of Manipur (Contract Package II) under Engineering Procurement and Construction (EPC) Mode. Dated : 18-01-2018
Technical Evaluation Result for the Project of Consultancy Services for carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of Two Laning with paved shoulder NH configuration of (i) Margherita-Changlang in the state of Assam and Arunachal Pradesh (ii) Daporijo (Upper Subansiri) to Dollungmukh (Lower Subansiri) via Dumporijo in the state of Arunachal Pradesh (iii) Tezu-Chapakhowa Via Sunpura section in the state of Arunachal Pradesh and Assam under SARDP-NE on Engineering, Procurement and Construction mode. Dated : 16-01-2018
Technical Evaluation Result & Cancellation Notice for the project of Improvement & Rehabilitation of Kapur more at Km 70.00 on NH-10 in the State of Sikkim on Item Rate Basis. Dated : 16-01-2018
New Technical evaluation result for the project of Consultancy Services for Authority’s Engineer for Supervision of “Four laning of Dolabari to Jamuguri section from km 17.300 of NH-37A to km 182.000 of NH-52 in the State of Assam under SARDP- NE, Phase A. Dated : 15-01-2018
Technical evaluation result for the project of Restoration of road by way of clearance of landslide, surface boulders side drain, culverts including construction of R/wall and B/walls and laying of WBM-I, WBM-II, WBM-III & Bituminous Carpeting on Sinthanpass- Anantnag –Khanabal road (Km 184.00 to Km 265.000) in the state of Jammu & Kashmir. Dated : 12-01-2018
Technical evaluation result for the project of Consultancy Services for Authority’s Engineer for Supervision of Four laning of Balachera to Harangajao section of NH-54(Ext) from km 275.000 to km 244.000 in the State of Assam on EPC mode. Dated : 10-01-2018
Technical evaluation result for the project of Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-1). (Package 5) Dated : 04-01-2018
Technical evaluation result for the project of Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-1). (Package 4) Dated : 04-01-2018
Technical evaluation result for the project of Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-1). (Package 3) Dated : 04-01-2018
Technical evaluation result for the project of Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-1). (Package 2) Dated : 04-01-2018
Technical evaluation result for the project of Consultancy Services for Authority’s Engineer for Supervision of “Rehabilitaion / Maintenance of newly entrusted Churachandpur-Singhat Sinzawl-Tuivai road section from (i) Km 0.00 to km 34.5 (ii) Km 34.5 to Km 103.1 and (iii) Km 103.1 to Km 161.48 on NH-102B in the state of Manipur on EPC basis. Dated : 02-01-2018