  1. Technical Evaluation Result for invitation of RFP for DPR consultancy services for western bypass. Dated: 27-12-18.
  2. Opening of financial bid for Hunli-Anini AE Project in the state of Arunachal Pradesh.Dated: 27-12-18.
  3. Financial Bid Opening For Consultancy Services for Authority’s Engineer for Supervision of “Two lane with hard shoulders of Chakabama-Zunheboto Road from (i) Design Km 50.000 to Km 75.000 (Existing Km 52.370 to Km 79.040) (ii) Design Km 75.000 to Km 95.000 (Existing Km 79.040 to Km 100.345) (iii) Design Km 95.000 to Km 115.534 (Existing Km 100.345 to Km 122.250)” in the state of Nagaland under SARDP-NE on EPC Mode. Dated: 27-12-18.
  4. Technical Evaluation result for  Consultancy Service for Authority’s Engineer for (i) Construction of alternative highway (Package-IVA from 0.00 to 13.00 of Bagrakot-Kafer section of NH-717A on EPC mode in state of West Bengal (ii) Construction of alternative highway (Package-IVB from 13.00 to 25.60 of Bagrakot-Kafer section of NH-717A on EPC mode in state of West Bengal (iii) Construction of alternative highway (Package-IVD from 26.10 to 40.00 of Bagrakot-Kafer section of NH-717A on EPC mode in state of West Bengal (iv) Construction of alternative highway (Package-IVC from 25.60 to 26.10 of Bagrakot-Kafer section of NH-717A on EPC mode in state of West Bengal (v) Construction of Mechi Bridge and Approaches on India-Nepal border linking Kakarvitta in Nepal and Panitanki in India under Engineering Procurement and Construction (EPC) Mode. Dated: 26-12-2018.
  5. Technical Evaluation result for  “Widening and up-gradation to 2-Lane with paved shoulder configuration and geometric improvements from km 166.00 to km 208.00 (Package-4) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on Engineering, Procurement and Construction (EPC) mode with JICA loan assistance “. Dated: 24-12-2018.
  6. Technical Evaluation result for “Widening and up-gradation to 2-Lane with paved shoulder configuration and geometric improvements from km 208.00 to km 250.00 (Package-5) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on Engineering, Procurement and Construction (EPC) mode with JICA loan assistance “.Dated: 24-12-2018.
  7. Technical Evaluation result for Widening and up-gradation to 2-Lane with paved shoulder configuration and geometric improvements from km 298.00 to km 339.00 (Package-7) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on Engineering, Procurement and Construction (EPC) mode with JICA loan assistance. Dated: 21-12-2018.
  8. Opening of Financial Bid for Operation and Maintenance of 2-Lane Bi-Directional Silkyara Bend – Barkot Tunnel With Escape Passage Including Approaches On Dharasu Yamunotri. Dated: 18-12-2018.
  9.  Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for the following road stretches in the state of Jammu & Kashmiri)2 Laning of Mughal Road connecting Shopian with Bafliaz in Poonch District)a) 2-lane with Paved Shoulder of NH configuration for Baramulla-Gulmarg Road 1.b) 2 Lane Bypass from Donipawa to Ashajipora connecting NH-244 & NH-44. Dated: 13-12-18.
  10. Expression of Interest (EOI) for Authority\’s Engineer for Widening and up-gradation to 2-lane with paved shoulder configuration and geometric improvements of NH-54 in the State of Mizoram on Engineering, Procurement and Construction (EPC) mode, with Japan International Cooperation Agency (JICA) loan assistance, for three consultancy packages as per following stretches: (i) From km 8.000 to km 125.000 (comprising 2 Civil contract packages); (ii) From km 125.000 to km 250.000 (comprising 3 Civil contract packages); (iii) From km 250.000 to km 380.000 (comprising 3 Civil contract packages). Dated: 06-12-18.
  11. The opening of financial bid for Hunli-Anini AE Project in the state of Arunachal  Pradesh.Dated: 03-12-18.
  12. Technical Evaluation Result Construction of Rooftop Cafe at the terrace level of Automated Multilevel Car Parking at Transport Bhawan,1, Parliament Street, New Delhi.Dated: 03-12-18.
  13.  Technical Evaluation Result Construction and Upgradation including specialized slope treatment of existing road to 2-lane with the paved shoulder from existing km. 458.900 to km. 459.475 (design ch 456.200 to ch 456.800) of Patalganga landslide of NH-07 under Chardham Pariyojna on EPC basis in the state of Uttarakhand. (Design length = 0.600 km) Dated: 30-11-18.
  14. Technical Evaluation Result  Construction and Upgradation including specialized slope treatment and augment of existing road from Km. 379+100 to Km. 380+275 (approx. 1.175 km) on Gholteer Landslide of National Highway No. 07 (hereinafter called the “NH-07”) in the state of Uttarakhand Dated: 30-11-18.
  15. Financial Bid Opening For Consultancy Services for Authority’s Engineer for Supervision of “Two lane with hard shoulders of Chakabama-Zunheboto Road from (i) Design Km 0.000 to Km 25.000 (Existing Km 0.000 to Km 25.760) (ii) Design Km 25.000 to Km 50.000 (Existing Km 25.760 to Km 52.370) ” in the state of Nagaland under SARDP-NE on EPC Mode. Dated: 29-11-18
  16. Technical Evaluation Result For Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of “In- Principle” declared NH in the Car Nicobar Island under the Union Territory of Andaman & Nicobar Island. Dated: 28-11-18.
  17. Technical Evaluation Result For Periodical Renewal for Rangpo-Gangtok section for Km 52+000 to Km 80+000(Excluding Km 63.00 to Km 66.00 and Km 69.00 to Km 72.00) of NH-10 including raising in 200 m length in Sinking area in Km 80 in the state of Sikkim Dated: 20-11-2018.
  18. Technical Score for Selection of agency/ agencies for entering into Annual Rate Contract for providing services of Designing, Printing of document(s) such as Books/ Annual Report(s), Booklets, Flyers, Leaflets, File Covers, Visiting Cards, Invitation Cards (including envelops), Conference ID Cards, etc., for NHIDCL, New Delhi.Dated: 25-10-18. 
  19. Technical Evaluation Result for Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of National Highway No. 217(Paikan-Tura Section) in the state of Assam/Meghalaya. Dated: 22-10-18 .
  20. Technical Evaluation result for Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of new National Highways (Guwahati-Jorabat bypass) in the state of Assam. Dated: 22-10-18. 
  21. Technical Evaluation Result of Consultancy Services for Authority’s Engineer for Supervision of Construction, Operation and Maintenance of 2-lane Bi-Directional Silkyara Bend –Barkot Tunnel with escape passage including approaches on Dharasu- Yamunotri section between Ch. 25.4 km and Ch. 51.0 km falling along NH-134 (old NH-94) in the State of Uttarakhand” on Engineering Procurement and construction (EPC) mode. -Result of Technical Evalution & Cancellation Tender.  Dated : 05-10-2018
  22. Technical Result For Clearance of landslides in soil, ordinary rock and hard rock from Km 80.000 to 123.600   on Batote-Kishtwar – Sinthanpass road section of NH-244 in the State of Jammu & Kashmir (as and when required basis).  Dated : 01-10-2018
  23. Technical Result For Clearance of landslides in soil, ordinary rock and hard rock from Km 25.000 to 80.000 on Batote-Kishtwar – Sinthanpass road section of NH-244 in the State of Jammu & Kashmir (as and when required basis).  Dated : 01-10-2018
  24. Technical Result For Clearance of landslides in soil, ordinary rock and hard rock from Km 123.600 to 170.000 on Batote-Kishtwar – Sinthanpass road section of NH-244 in the State of Jammu & Kashmir (as and when required basis). Dated : 01-10-2018
  25. Technical Result For Clearance of landslides in soil, ordinary rock and hard rock from Km 0.000 to 25.000 on Batote-Kishtwar – Sinthanpass road section of NH-244 in the State of Jammu & Kashmir (as and when required basis). Dated : 01-10-2018
  26. Opening of Financial Bids for the Project of Consultancy Services for Authority’s Engineer for Supervision of “Two- lane with hard shoulders of Pfutsero-Phek Road from: (i) Design Km  0.000 to Km 20.000 (Existing Km 0.000 to Km 19.900) (ii) Design Km 20.000 to Km 40.000 (Existing Km 19.900 to Km 40.090) (iii) Design Km 40.000 to Km 62.558 (Existing Km 40.090 to Km 65.300)” in state of Nagaland under SARDP-NE on EPC mode. Dated : 18-09-2018
  27. Technical Result for the Project of Consultancy Services for Authority’s Engineer for Supervision of Construction, Operation and Maintenance of 2-lane Bi-Directional Silkyara  Bend –Barkot Tunnel with escape passage including approaches on Dharasu- Yamunotri section between Ch. 25.4 km and Ch. 51.0 km falling along NH-134  (old NH-94) in the State of Uttarakhand. Dated : 18-09-2018
  28. Technical Score For The Project of Consultancy Services for Authority’s Engineer for – (i) Construction and Upgradation of existing road to 2-lane with paved shoulder from Km. 368.000 to Km. 399.000 of Lameri to Karanprayag (Excluding Km. 379.100 to Km 380.275) of NH-07 under Chardham Pariyojna on EPC basis in the State of Uttarakhand.  (ii) Construction and Upgradation of existing road to 2-lane with paved shoulder from Km 399.000 to Km. 430.000 of Karanpyarag to Chamoli (Excluding Km 420.250 to Km 420.500 and Km 423.300 to km 423.650) of NH-07 under Chardham Pariyojna on EPC basis in the State of Uttarakhand.  (iii) Construction and Upgradation of existing road to 2-lane with paved shoulder from Km 430.000 to Km. 468.000 of Chamoli to Paini (Excluding Km 437.625 to Km 437.775, Km 458.900 to Km 459.475 and Km 464.425 to Km 464.525) of NH-07 under Chardham Pariyojna on EPC basis in the State of Uttarakhand.  (iv) Construction and Upgradation of existing road to 2-lane with paved shoulder from Km 458.900 to Km 459.475 of Patalganga Landslide (Design km 456.200 to Km 456.800) of NH-07 under Chardham Paryojna on EPC Mode in the State of Uttarakhand (Design Length = 0.600 Km).  (V) Construction and Upgradation of existing road to 2-lane with paved shoulder from Km 379.100 to Km 380.275 of Gholtir landslide (Design Km 378.900 to Km 380.075) of NH-07 under Chardham Paryojna on EPC basis in the State of Uttarakhand (Design Length – 1.175 Km). Dated : 11-09-2018
  29. Technical Score For The Project of Consultancy Services for Authority’s Engineer for Supervision of “Two- lane with hard shoulders of Pfutsero-Phek Road from: (i) Design Km  0.000 to Km 20.000 (Existing Km 0.000 to Km 19.900) (ii) Design Km 20.000 to Km 40.000 (Existing Km 19.900 to Km 40.090) (iii) Design Km 40.000 to Km 62.558 (Existing Km 40.090 to Km 65.300)” in state of Nagaland under SARDP-NE on EPC mode. Dated : 10-09-2018
  30. Technical Evaluation Result For The Project of Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for construction of new 2-lane Road Bridge across River Brahmaputra  in Jogighopa in the State of Assam. Dated : 07-09-2018
  31. Final Composite Score For The Project of Selection of agency for providing services of Housekeeping staff and Security Guards in NHIDCL Headquarters, New Delhi. Dated : 05-09-2018
  32. 2nd Stage Re-Evaluation Result For The Project of Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of newly declared National Highway, Tharthri-Kahaljugasar-Kilhotran (70 km, District- Doda, J&K) to Makhan-Chachool (10 km, District- Chamba, Himachal Pradesh) to 2-lane with paved shoulder including Feasibility study cum DPR of Tunnel of approx. length 4 km near Kahaljugasar in the state of Jammu and Kashmir. Dated : 28-08-2018
  33. Final Technical Evaluation Result For The Project of Consultancy Services  For  preparation of Detailed Project Report for Development of Multi Modal Logistic Park at  Jogighopa (Assam). Dated : 23-08-2018
  34. Final Score for the Tender of Selection of Manpower Placement Agency for providing Technical personnel for working in NHIDCL Headquarters, New Delhi/ Branch Offices located across India, Ministry of Road Transport and Highways and at places where NHIDCL has been asked to provide such human resources. Dated : 20-08-2018
  35. 2nd Stage Technical Evaluation Result For The Project of Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of newly declared National Highway, Tharthri-Kahaljugasar-Kilhotran (70 km, District- Doda, J&K) to Makhan-Chachool (10 km, District- Chamba, Himachal Pradesh) to 2-lane with paved shoulder including Feasibility study cum DPR of Tunnel of approx. length 4 km near Kahaljugasar in the state of Jammu and Kashmir. Dated : 09-08-2018
  36. Technical Evaluation Result For The Project of Short term improvement & Routine maintenance of Imphal- Jiribam road NH-37 from km 3.00 to km 75.00 (length 72.00km) in  the State of Manipur on Item Rate Basis. Dated : 07-08-2018 
  37. Technical Evaluation Score for the Project of Selection of agency for providing services of Housekeeping staff and Security Guards in NHIDCL Headquarters, New Delhi. Dated : 07-08-2018
  38. Technical Evaluation Result For The Project of Short term improvement & Routine maintenance of Imphal- Jiribam road NH-37 from km 75.00 to km 145.00 (length 70.00km)  in the State of Manipur on Item Rate Basis (Package-II) Dated : 25-07-2018
  39. Technical Evaluation Result For The Project of Supplying, Installation & Commissioning of Fire Fighting System from Automated Car Parking Building in Transport Bhawan to Pump Room of Shram Shakti Bhawan at Connaught Place,New Delhi. Dated : 19-07-2018
  40. 2nd Stage Evaluation Result for the Project of  Consultancy Services for Authority’s Engineer for Supervision of “(i) Up-gradation to 4-lane with Paved Shoulder of Jammu-Akhnoor road section of NH-144A from Canal head (Km 0.800) to Ganesh Vihar (Km 6.000) of 5.2 Km length (ii) Up-gradation to 4-lane with Paved Shoulder of Jammu-Akhnoor road section of NH-144A from Ganesh Vihar (Km 6.000) to Hanuman chowk (Km 30.097) of 24.097 Km length in the state of Jammu and Kashmir to be executed on EPC basis. (iii) Consultancy Services for Widening and Up-gradation to 2 lane with paved shoulder configuration and geometric improvement from km 0.000 to km 16.990 on Chenani – Sudhmahadev section of NH-244 in the state of Jammu and Kashmir to be executed on EPC basis”. Dated : 16-07-2018
  41. Technical Result For The Project of Restoration of Road by way of clearance of consolidated slips, surface boulders, side drain, culverts including construction of Retaining wall and Breast walls and fixing of Traffic sign board & Kilometer stones on Khellani-Hambal-Goha-Dranga (km 0.000 to km 29.800) in the state of Jammu & Kashmir. Dated : 06-07-2018
  42. Technical Evaluation Result For The Project of Consultancy Services for preparation of Detailed Project Report and Pre-Construction activities for Construction of 4 nos. of bypasses at Chhiathlang, Serchhip, Hnathial and Lawngtlai on Aizawl-Tuipang section of NH-54 in the state of Mizoram Dated : 05-07-2018
  43. Revised Technical Evaluation Result For The Project of Consultancy Services for Authority’s Engineer for Supervision of “Two- lane with hard shoulders of Merangkong-Tamlu-Mon Road from: (i)  Design Km 0.000 to Km 20.000 (Existing Km 0.000 to Km 20.456) (ii) Design Km 20.000 to Km 40.000 (Existing Km 20.456 to Km 41.065) (iii) Design Km 40.000 to Km 59.000 (Existing Km 41.065 to Km 60.345) (iv) Design Km 59.000 to Km 86.835 (Existing Km 60.345 to Km 98.065)” in state of Nagaland under SARDP-NE on EPC mode. Dated : 05-07-2018
  44. Technical Result For The Project of Up-gradation to 4-lane with Paved Shoulder of Jammu-Akhnoor road section of NH-144A from Ganesh Vihar (Km 6.000) to Hanuman chowk (Km 30.000) of 24 Km length in the state of Jammu and Kashmir to be executed on EPC basis. Dated : 03-07-2018
  45. Technical Evaluation Result For The Project Of Short Term Improvement & Routine Maintenance From Km. 52.000 To Km. 80.000 Of NH-10 In The State Of Sikkim  On Percentage Rate Basis. Dated : 03-07-2018
  46. Technical Evaluation Result for the Project of Short term improvement & Routine maintenance of Imphal- Jiribam road NH-37 from km 145.00 to km 220.00 (length  75.00km) in the State of Manipur on Item Rate Basis (Package- III) Dated : 22-06-2018
  47. Revised Technical Evaluation Result for the Project of Restoration / Reconstruction of Churachandpur-Tipaimukh road from km 185.00 (Bukpi) to Km 262.00 (Tipaimukh) in the state of Manipur on EPC mode.  Dated : 19-06-2018
  48. 1st Stage Re-Evaluation Result for the Project of Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of newly declared National Highway, Tharthri-Kahaljugasar-Kilhotran (70 km, District- Doda, J&K) to Makhan-Chachool (10 km, District- Chamba, Himachal Pradesh) to 2-lane with paved shoulder including Feasibility study cum DPR of Tunnel of approx. length 4 km near Kahaljugasar in the state of Jammu and Kashmir Dated : 21-06-2018
  49. Technical Evaluation Result for the Project of Consultancy Services for Authority’s Engineer for Supervision of Rehabilitaion / Maintenance of newly entrusted Churachandpur-Singhat-Sinzawl Tuivai road section from (i) Km 0.00 to km 34.5 (ii) Km 34.5 to Km 103.1 and (iii) Km 103.1 to Km 161.48 on NH-102B and Churachandpur-Tipaimukh road from km 185.00 to Km 262.00 (Package-II) on EPC basis in the state of Manipur. Dated : 19-06-2018
  50. Revised Technical Evaluation Result for the Project of Consultancy services for Authority’s Engineer for Supervision of Four Laning of Imphal – Moreh Section of NH 39 from Km 330.000 to Km 350.000 in the State of Manipur (Contract Package I) and Two Laning of Imphal – Moreh Section of NH 39 from Km 350.000 to Km 395.680 in the State of Manipur (Contract Package II) under Engineering Procurement and Construction (EPC) Mode.  Dated : 14-06-2018
  51. Technical Evaluation Result for the Project of Restoration/Reconstruction of Churachandpur-Tipaimukh road from km 185.00 (Bukpi) to Km 262.00 (Tipaimukh) in the state of Manipur on EPC mode. Dated : 12-06-2018
  52. Technical Evaluation Result for the Project of Consultancy Services for preparation of DPR for development of Economic Corridors and International Connectivity Routes to improve the efficiency of freight movement in the state of Mizoram under Bharatmala Pariyojana (Lot-2) (Package-II). Dated : 12-06-2018
  53. Technical Evaluation Result for the Project of  Consultancy Services for preparation of DPR for development of Economic Corridors and International Connectivity Routes to improve the efficiency of freight movement in the state of Nagaland under Bharatmala Pariyojana (Lot-2) (Package-I). Dated : 12-06-2018
  54. 1st Stage Evaluation Result for the Project of Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of newly declared National Highway, Tharthri-Kahaljugasar-Kilhotran (70 km, District- Doda, J&K) to Makhan-Chachool (10 km, District- Chamba, Himachal Pradesh) to 2-lane with paved shoulder including Feasibility study cum DPR of Tunnel of approx. length 4 km near Kahaljugasar in the state of Jammu and Kashmir. Dated : 11-06-2018
  55. Technical Evaluation Result for the Project of Two Laning of Imphal – Moreh Section of NH 39 from Km 350.000 to Km 395.680 in the State of Manipur (Contract Package II) under Engineering Procurement and Construction (EPC) Mode  Dated : 01-06-2018
  56. Technical Evaluation Result for the Project of Fixing of Main and Intermediate Boundary Pillars for demarcation of ROW along NH-54 (2-Lane with paved shoulder) from km 8.00 to km 380.00 in the State of Mizoram. Dated : 30-05-2018
  57. Revised Technical Evaluation Result for the Project of Construction, Operation and Maintenance of 2-Lane BiDirectional Silkyara Bend – Barkot Tunnel With Escape Passage Including Approaches On DharasuYamunotri Section Between Ch. 25.400 Km And Ch. 51.000 Km Falling Along NH-134 (OLD NH-94)in the State Of Uttarakhand on EPC mode” Dated : 29-05-2018
  58. Technical Evaluation Result for the Project of Selection Of Consultants/ Ngos To Assist In Implementation Of Resettlement Action Plan For : Widening to Two lane with Geometric Improvements of Tura Dalu road from Km 85.00 to 95.00 & 101.00 to 145.00 to 2-lanes with paved shoulder of Tura-Dalu section of NH51 in the state of Meghalaya on Engineering, Procurement and Construction (EPC) mode, with Japan International Cooperation Agency (JICA) loan assistance on EPC Mode. Dated : 24-05-2018
  59. Technical Evaluation Result for the Project of Consultancy Services for Authority’s Engineer for Supervision of “Two- lane with hard shoulders of Pfutsero-Phek Road from: (i) Design Km  0.000 to Km 20.000 (Existing Km 0.000 to Km 19.900) (ii) Design Km 20.000 to Km 40.000 (Existing Km 19.900 to Km 40.090) (iii) Design Km 40.000 to Km 62.558 (Existing Km 40.090 to Km 65.300)” in state of Nagaland under SARDP-NE on EPC mode. Dated : 24-05-2018
  60. Technical Evaluation Result for the Project of  Construction, Operation and Maintenance of 2-Lane BiDirectional Silkyara Bend – Barkot Tunnel With Escape Passage Including Approaches On DharasuYamunotri Section Between Ch. 25.400 Km And Ch. 51.000 Km Falling Along NH-134 (OLD NH-94)in the State Of Uttarakhand on EPC mode. Dated : 21-05-2018
  61. Technical Evaluation Result for the Project of Short term improvement & Routine maintenance of Ukhrul- Jessami-Nagaland Border (km 126) in the state of Manipur on Item rate basis. Dated : 14-05-2018
  62. Technical Evaluation Result for the Project of Selection Of Consultants/ NGOs To Assist In Implementation of Resettlement Action Plan For: (i) Widening and upgradation to 2-lane with paved shoulder configuration and geometric improvements from km 8.0 to km 380.0 on Aizawl-Tuipang section of NH-54 in the State of Mizoram and (ii) Construction of 4 nos. of bypasses at Chhiathlang, Serchhip, Hnathial and Lawngtlai on this highway on Engineering, Procurement and Construction (EPC) mode, with Japan International Cooperation Agency (JICA) loan assistance. Dated : 11-05-2018
  63. Technical Evaluation Score for the Project of Consultancy Services for Authority’s Engineer for Supervision of “Two- lane with hard shoulders of Merangkong-Tamlu-Mon Road from: (i)  Design Km 0.000 to Km 20.000 (Existing Km 0.000 to Km 20.456) (ii) Design Km 20.000 to Km 40.000 (Existing Km 20.456 to Km 41.065) (iii) Design Km 40.000 to Km 59.000 (Existing Km 41.065 to Km 60.345) (iv) Design Km 59.000 to Km 86.835 (Existing Km 60.345 to Km 98.065)” in state of Nagaland under SARDP-NE on EPC mode. Dated : 10-05-2018
  64. Final Technical Score for the Project of Consultancy services for Authority’s Engineer for Supervision of “Construction, Operation and Maintenance of 2-Lane bi-directional Zojila Tunnel with Parallel Escape (Egress) Tunnel excluding approaches on Srinagar-Leh Section connecting NH-1A at Km 95.00 And At Km 118.00 in the State of Jammu & Kashmir on EPC Mode”. Dated : 10-05-2018
  65. Technical Evaluation Result for the Project of Consultancy Services for Authority’s Engineer for Supervision of “Two- lane with hard shoulders of Merangkong-Tamlu-Mon Road from: (i)  Design Km 0.000 to Km 20.000 (Existing Km 0.000 to Km 20.456) (ii) Design Km 20.000 to Km 40.000 (Existing Km 20.456 to Km 41.065) (iii) Design Km 40.000 to Km 59.000 (Existing Km 41.065 to Km 60.345) (iv) Design Km 59.000 to Km 86.835 (Existing Km 60.345 to Km 98.065)” in state of Nagaland under SARDP-NE on EPC mode. Dated : 07-05-2018
  66. Revised Technical Result for the Project of Consultancy services for Authority’s Engineer for Supervision of Four Laning of Imphal – Moreh Section of NH 39 from Km 330.000 to Km 350.000 in the State of Manipur (Contract Package I) and Two Laning of Imphal – Moreh Section of NH 39 from Km 350.000 to Km 395.680 in the State of Manipur (Contract Package II) under Engineering Procurement and Construction (EPC) Mode. Dated : 24-04-2018
  67. Technical Result for the Project of Consultancy Services For Authority’s Engineer For (i) Protection works at Nalupani Landslide Zone (Ex.km 123+080 to km. 123+480, km 123+665 to km 123+740 and km 123+770 to km 123+970) Section of NH-34 in the State of Uttarakhand on EPC basis. (ii) Construction of Road, Bridge and Slope Protection works of Landslide at Bareti (Ex. Km. 100.300 to km 101.600 of Section NH-34 in the State of Uttarakhand on EPC basis. Dated : 23-04-2018
  68. Technical Evaluation Result for the Project of  Improvement By Overlay Of The Stretch From Km 21.00 To Km 28.00 On NH-4 (Old NH-223) n The Union Teritory Of  Andaman & Nicobar Islands. Dated : 16-04-2018
  69. Financial Evalution Result for the Project of Empanelment of Travel Agents for Booking of Tickets for Domestic and International Air and Railway Journey. Dated : 13-04-2018
  70. Technical Evaluation Result for the Project of Empanelment of Travel Agents for Booking of Tickets for Domestic and International Air and Railway Journey. Dated : 11-04-2018
  71. Technical Evaluation Result for the Project of Urgent repairs of Hiller Bridge in District Anantnag on Kishtwar Sinthanpass – Khanabal Road, NH-244 in the state of Jammu & Kashmir. Dated : 06-04-2018
  72. Technical Evaluation Result for the Project of Demolition of collapsed Bidhar bridge at km 229.530 on Sinthanpass Khanabal section of NH-244 in the State of Jammu & Kashmir. Dated : 06-04-2018
  73. Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF CHAKABAMA ZUNHEBOTO ROAD ON EPC BASIS FROM EXISTING KM 100.345 TO KM 122.250 [DESIGN KM. 95.000 TO KM. 115.534] (DESIGN LENGTH – 25.534 KM) IN THE STATE OF NAGALAND UNDER SARDP-NE ON EPC MODE. Dated : 26-03-2018
  74. Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF CHAKABAMA ZUNHEBOTO ROAD ON EPC BASIS FROM EXISTING KM 79.040 TO KM 100.345 [DESIGN KM. 75.000 TO KM. 95.000 (DESIGN LENGTH – 20.000 KM) IN THE STATE OF NAGALAND UNDER SARDP-NE ON EPC MODE. Dated : 26-03-2018
  75. Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF MERANGKONG-TAMLU-MON ROAD ON EPC BASIS FROM EXISTING KM 41.065 TO KM 60.345 [DESIGN KM. 40.000 TO KM. 59.000] (DESIGN LENGTH – 19.00 KM) IN THE STATE OF NAGALAND UNDER SARDP-NE ON EPC MODE. Dated : 26-03-2018
  76. Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF MERANGKONG-TAMLU-MON ROAD ON EPC BASIS FROM EXISTING KM 60.345 TO KM 98.065 [DESIGN KM. 59.000 TO KM. 86.835] (DESIGN LENGTH – 27.835 KM) IN THE STATE OF NAGALAND UNDER SARDP-NE ON EPC MODE. Dated : 26-03-2018
  77. Technical Evaluation Result for the Project of Construction of alternative highway to Gangtok in Sikkim via Bagrakot — Chuikhim — Nimbong — Kafer — Bakhim — Algarah — Rhenok in the State of West Bengal and from Rhenok — Rorathang — Pakyong along with spur from Aritar — Rolep — Menla in the State of Sikkim (Package No. IVA from Km 0.00 to Km 13.00 of Bagrakot — Kafer section of NH 717A on EPC Mode under Phase A of SARDP-NE in the State of West Bengal). Dated : 23-03-2018
  78. Revised Technical Evaluation Result for the Project of REQUEST FOR PROPOSAL (RFP) FOR “WIDENING TO 2-LANE WITH GEOMETRIC IMPROVEMENTS OF TURA DALU ROAD FROM KM 85.000 TO 95.000 & 101.000 TO 145.000 TO 2-LANES WITH PAVED SHOULDER OF TURA–DALU SECTION OF NH-51 IN THE STATE OF MEGHALAYA WITH JAPAN INTERNATIONAL COOPERATION AGENCY (JICA) LOAN ASSISTANCE. Dated : 22-03-2018
  79. Final Evaluation Result for the Project of Improvement & Rehabilitation of existing Indira Bye Pass road form Km 0.000 to km 10.117 on NH-10 in the State of Sikkim on Item Rate Basis (Retender). Dated : 22-03-2018
  80. Technical Evaluation Result for the Project of  WIDENING TO 2-LANE WITH GEOMETRIC IMPROVEMENTS OF TURA DALU ROAD FROM KM 85.000 TO 95.000 & 101.000 TO 145.000 TO 2-LANES WITH PAVED SHOULDER OF TURA–DALU SECTION OF NH-51 IN THE STATE OF MEGHALAYA WITH JAPAN INTERNATIONAL COOPERATION AGENCY (JICA) LOAN ASSISTANCE. Dated : 20-03-2018
  81. Technical Result for the Project of Special Repair Works At Narrow zone and Landslide Area Between Rangpo and Ranipool on NH-10 in the State of Sikkim on EPC Basis. Dated : 20-03-2018
  82. Final Technical Score for the Project of Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities: (i) For construction of Approach Roads with Avalanche Protection Works to West and East portal of the proposed Zojila Tunnel between (between Baltal and Minamarg) from km 82.00 to km 95.00 on Srinagar-Leh road (NH-1) and; (ii) For making the NH-1 from Z-Morh Tunnel to proposed Zojila Tunnel (approx. 20 km) all weather road in the State of Jammu & Kashmir. Dated : 20-03-2018
  83. Technical Result for the Project of Widening and upgradation to 2 lane with paved shoulder configuration and geometric improvement from km 0.000 to km 16.990 on Chenani – Sudhmahadev section of NH-244 in the State of Jammu & Kashmir On EPC Mode. Dated : 20-03-2018
  84. Revised Technical Evaluation Result for the Project of Improvement & Rehabilitation of Kapur more at Km 70.00 on NH-10 in the State of Sikkim on Item Rate Basis. Dated : 20-03-2018
  85. Technical Evaluation Result for the Project of  CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF CHAKABAMA ZUNHEBOTO ROAD ON EPC BASIS FROM EXISTING KM 52.370 TO KM 79.040 [DESIGN KM. 50.000 TO KM. 75.000] (DESIGN LENGTH – 25.000 KM) IN THE STATE OF NAGALAND UNDER SARDP-NE ON EPC MODE. Dated : 19-03-2018
  86. Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF CHAKABAMA ZUNHEBOTO ROAD ON EPC BASIS FROM EXISTING KM 00.000 TO KM 25.760 [DESIGN KM. 00.000 TO KM. 25.000] (DESIGN LENGTH – 25.00 KM) IN THE STATE OF NAGALAND UNDER SARDP-NE ON EPC MODE. Dated : 19-03-2018
  87. Technical Evaluation Result for the Project of Construction of alternative highway to Gangtok in Sikkim via Bagrakot — Chuikhim — Nimbong — Kafer — Bakhim — Algarah — Rhenok in the State of West Bengal and from Rhenok — Rorathang — Pakyong along with spur from Aritar — Rolep — Menla in the State of Sikkim (Package No. IVB from Km 13.00 to Km 25.60 of Bagrakot — Kafer section of NH 717A on EPC Mode under Phase A of SARDP-NE in the State of West Bengal). Dated : 19-03-2018
  88. Technical Result for the Project of Construction and Upgradation of existing road to 2-lane with paved shoulder from Km 399.000 to Km. 430.000 of Karanpyarag to Chamoli (Excluding Km 420.250 to Km 420.500 and Km 423.300 to km 423.650) of NH-07 under Chardham Pariyojna on EPC basis in the state of Uttarakhand. (Design Length – 28.80 Km). Dated : 19-03-2018
  89. Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF MERANGKONG-TAMLU-MON ROAD ON EPC BASIS FROM EXISTING KM 20.456 TO KM 41.065 [DESIGN KM. 20.000 TO KM. 40.000] (DESIGN LENGTH – 20.00 KM) IN THE STATE OF NAGALAND UNDER SARDP-NE ON EPC MODE. Dated : 16-03-2018
  90. Technical Evaluation Result for the Project of  CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF CHAKABAMA ZUNHEBOTO ROAD ON EPC BASIS FROM EXISTING KM 25.760 TO KM 52.370 [DESIGN KM. 25.000 TO KM. 50.000] (DESIGN LENGTH – 25.00 KM) IN THE STATE OF NAGALAND UNDER SARDP-NE ON EPC MODE. Dated : 16-03-2018
  91. Technical Evaluation Result for the Project of Two Laning of Imphal – Moreh Section of NH 39 from Km 350.000 to Km 395.680 in the State of Manipur (Contract Package II) under Engineering Procurement and Construction (EPC) Mode Dated : 16-03-2018
  92. Technical Evaluation Result for the Project of Four Laning of Imphal – Moreh Section of NH 39 from Km 330.000 to Km 350.000 in the State of Manipur (Contract Package I) under Engineering Procurement and Construction (EPC) Mode Dated : 16-03-2018
  93. Technical Result for the Project of Construction and Upgradation of existing road to 2-lane with paved shoulder from Km. 368.000 to Km. 399.000 of Lameri to Karanprayag (Excluding Km. 379.100 to Km 380.275) of NH-07 under Chardham Pariyojna on EPC basis in the state of Utttarakhand (Design Length – 29.125 Km). Dated : 16-03-2018
  94. Technical Result for the Project of  Construction and Upgradation of existing road to 2-lane with paved shoulder from Km 430.000 to Km. 468.000 of Chamoli to Paini (Excluding Km 437.625 to Km 437.775, Km 458.900 to Km 459.475 and Km 464.425 to Km 464.525) of NH-07 under Chardham Pariyojna on EPC basis in the state of Uttarakhand. (Design Length – 36.675 Km). Dated : 16-03-2018
  95. Technical Evaluation Result for the Project of Rehabilitation and Up-gradation of section from Km 206.000 to Km 239.445 (Nimbutala to Austin Creek) of NH-4 (Old NH-223) to 2-Lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands. Dated : 16-03-2018
  96. Revised Technical Evaluation Result for the Project of Construction of alternative highway to Gangtok in Sikkim via Bagrakot — Chuikhim — Nimbong — Kafer — Bakhim — Algarah — Rhenok in the State of West Bengal and from Rhenok — Rorathang — Pakyong along with spur from Aritar — Rolep — Menla in the State of Sikkim (Package No. IVD from Km 26.10 to Km 40.00 of Bagrakot — Kafer section of NH 717A on EPC Mode under Phase A of SARDP-NE in the State of West Bengal). Dated : 15-03-2018
  97. Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF MERANGKONG-TAMLU-MON ROAD ON EPC BASIS FROM EXISTING KM 00.000 TO KM 20.456 [DESIGN KM. 00.000 TO KM. 20.000] (DESIGN LENGTH – 20.00 KM) IN THE STATE OF NAGALAND UNDER SARDP-NE ON EPC MODE. Dated : 15-03-2018
  98. Revised Technical Evaluation Result for the Project of Construction and upgradation of existing road to two lane with paved shoulder from Km 0.00 to Km 16.539 of Ranipool – Pakyong of NH-717-A on EPC basis under SARDP-NE in the State of Sikkim. Dated : 15-03-2018
  99. Technical Evaluation Result for the Project of Special Repair work between Ranipool to Zero point from km 80.00 to km 93.00 of NH-10 in the State of Sikkim on Item Rate Basis” (Re-tender) Dated : 14-03-2018
  100. Technical Evaluation Result for the Project of Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-1) (Package-III)  Dated : 14-03-2018
  101. Revised Technical Evaluation Result for the Project of Construction of Dimapur Bypass (Assam Portion) of 4/6 lane pavement  on EPC basis  from existing Km 159.400 of NH-36 to existing Km 102.500 of NH-39 and upto end point of Assam portion [Design Km 118.050 to design Km 132.375] (length 14.325 Km)  in the State of Assam under Phase-A of SARDP-NE Dated : 14-03-2018
  102. Technical Evaluation Result for the Project of Improvement & Rehabilitation of Kapur more at Km 70.00 on NH-10 in the State of Sikkim on Item Rate Basis”. (Retender) Dated : 14-03-2018 
  103. Technical Evaluation Result for the Project of “Improvement & Rehabilitation of existing Indira Bye Pass road form Km 0.000 to km 10.117 on NH-10 in the State of Sikkim on Item Rate Basis” (Retender)  Dated : 14-03-2018
  104. Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF PFUTSERO PHEK ROAD ON EPC BASIS FROM EXISTING KM 00.000 TO KM 19.900 [DESIGN KM. 00.000 TO KM. 20.000] (DESIGN LENGTH – 20.00 KM) IN THE STATE OF NAGALAND UNDER SARDP-NE ON EPC MODE. Dated : 13-03-2018
  105. Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF PFUTSERO PHEK ROAD ON EPC BASIS FROM EXISTING KM 19.900 TO KM 40.090 [DESIGN KM. 20.000 TO KM. 40.000] (DESIGN LENGTH – 20.00 KM) IN THE STATE OF NAGALAND UNDER SARDP-NE ON EPC MODE. Dated : 13-03-2018
  106. Technical Evaluation Result for the Project of CONSTRUCTION OF TWO-LANE WITH HARD SHOULDERS OF PFUTSERO PHEK ROAD ON EPC BASIS FROM EXISTING KM 40.090 TO KM 65.300 [DESIGN KM. 40.000 TO KM. 62.558] (DESIGN LENGTH – 22.558 KM) IN THE STATE OF NAGALAND UNDER SARDP-NE ON EPC MODE. Dated : 13-03-2018
  107. Technical Evaluation Result for the Project of Construction of Dimapur Bypass (Assam Portion) of 4/6 lane pavement  on EPC basis  from existing Km 159.400 of NH-36 to existing Km 102.500 of NH-39 and upto end point of Assam portion [Design Km 118.050 to design Km 132.375] (length 14.325 Km)  in the State of Assam under Phase-A of SARDP-NE Dated : 13-03-2018
  108. Technical Evaluation Result for the Project of Construction of alternative highway to Gangtok in Sikkim via Bagrakot — Chuikhim — Nimbong — Kafer — Bakhim — Algarah — Rhenok in the State of West Bengal and from Rhenok — Rorathang — Pakyong along with spur from Aritar — Rolep — Menla in the State of Sikkim (Package No. IVB from Km 13.00 to Km 25.60 of Bagrakot — Kafer section of NH 717A on EPC Mode under Phase A of SARDP-NE in the State of West Bengal). Dated : 13-03-2018
  109. Technical Evaluation Result for the Project of Construction of alternative highway to Gangtok in Sikkim via Bagrakot — Chuikhim — Nimbong — Kafer — Bakhim — Algarah — Rhenok in the State of West Bengal and from Rhenok — Rorathang — Pakyong along with spur from Aritar — Rolep — Menla in the State of Sikkim (Package No. IVD from Km 26.10 to Km 40.00 of Bagrakot — Kafer section of NH 717A on EPC Mode under Phase A of SARDP-NE in the State of West Bengal). Dated : 13-03-2018
  110. Technical Evaluation Result for the Project of Construction and upgradation of existing road to two lane with paved shoulder from Km 0.00 to Km 16.539 of Ranipool – Pakyong of NH-717-A on EPC basis under SARDP-NE in the State of Sikkim. Dated : 09-03-2018
  111. Technical Result for the Project of Up-gradation to 4-lane with Paved Shoulder of Jammu-Akhnoor road section of NH-144A from Canal head (Km 0.800) to Ganesh Vihar (Km 6.000) of 5.2 Km length in the state of Jammu and Kashmir to be executed on EPC basis. Dated : 09-03-2018
  112. Technical Score for the Project of Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities: (i) For construction of Approach Roads with Avalanche Protection Works to West and East portal of the proposed Zojila Tunnel between (between Baltal and Minamarg) from km 82.00 to km 95.00 on Srinagar-Leh road (NH-1) and; (ii) For making the NH-1 from Z-Morh Tunnel to proposed Zojila Tunnel (approx. 20 km) all weather road in the State of Jammu & Kashmir. Dated : 07-03-2018
  113. Technical Result for the Project of Rehabilitation and up-gradation of section from Km 107.760 to Km 129.445 (After Middle strait to Humphrey), Km 130.600 to Km 138 (After Humphrey to Kadamtala) & Km 155.00 to Km 181.0 (End of Jarwa to Rangat) of NH-4 (Total length: 54.71 Km) to 2-Lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands On EPC Mode. Dated : 07-03-2018
  114. Technical Evaluation Result for the Project of 2 LANING OF EXISTING HUNLI-ANINI FROM DESIGN KM 120.000 TO KM 130.300 (TOTAL LENGTH =10.300 KMS) IN THE STATE OF ARUNACHAL PRADESH ON EPC BASIS UNDER SARDP-NE ON EPC MODE. Dated : 06-03-2018
  115. Technical Evaluation Result for the Project of Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-1) (Package-1B)  Dated : 05-03-2018
  116. Technical Evaluation Result for the Project of Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-1) (Package-1A) Dated : 01-03-2018
  117. Final Evaluation Result for the Project of Consultancy Services for Authority‟s Engineer for Supervision of “Four laning of Balachera to Harangajao section of NH-54(Ext) from km 275.000 to km 244.000 in the State of Assam on EPC mode”. Dated : 09-02-2018
  118. Modified Technical Result for the Project of Restoration of Road by way of clearance of landslide, surface boulders side drain, culverts including construction of R/wall/Scuppers and laying of WBM-II, WBM-III, & Pre- Mixed Surfacing/Mixed seal Surfacing (PC) on Batote-Kishtwar-Chatroo- Sinthan top road NH-244 Km from Km 170.000 to Km 184.000 in the state of Jammu & Kashmir. Dated : 01-02-2018
  119. Revised Technical Evaluation Result for the Project of Consultancy Services for Authority‟s Engineer for Supervision of “Four laning of Balachera to Harangajao section of NH-54(Ext) from km 275.000 to km 244.000 in the State of Assam on EPC mode. Dated : 31-01-2018
  120. Technical Evaluation Result Cancellation Notice for the Project of Special Repair work between Ranipool to Zero point from km 80.00 to km 93.00 of NH-10 in the State of Sikkim on Item Rate Basis. Dated : 30-01-2018
  121. Technical Result for the Project of Restoration of Road by way of clearance of landslide, surface boulders side drain, culverts including construction of R/wall/Scuppers and laying of WBM-II, WBM-III, & Pre- Mixed Surfacing/Mixed seal Surfacing (PC) on Batote-Kishtwar-Chatroo- Sinthan top road NH-244 Km from Km 170.000 to Km 184.000 in the state of Jammu & Kashmir. Dated : 25-01-2018 
  122. Technical Evaluation Result for the Project of Consultancy services for Authority’s Engineer for Supervision of Four Laning of Imphal – Moreh Section of NH 39 from Km 330.000 to Km 350.000 in the State of Manipur (Contract Package I) and Two Laning of Imphal – Moreh Section of NH 39 from Km 350.000 to Km 395.680 in the State of Manipur (Contract Package II) under Engineering Procurement and Construction (EPC) Mode. Dated : 18-01-2018
  123. Technical Evaluation Result for the Project of Consultancy Services for carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of Two Laning with paved shoulder NH configuration of (i) Margherita-Changlang in the state of Assam and Arunachal Pradesh (ii) Daporijo (Upper Subansiri) to Dollungmukh (Lower Subansiri) via Dumporijo in the state of Arunachal Pradesh (iii) Tezu-Chapakhowa Via Sunpura section in the state of Arunachal Pradesh and Assam under SARDP-NE on Engineering, Procurement and Construction mode. Dated : 16-01-2018
  124. Technical Evaluation Result & Cancellation Notice for the project of Improvement & Rehabilitation of Kapur more at Km 70.00 on NH-10 in the State of Sikkim on Item Rate Basis. Dated : 16-01-2018
  125. New Technical evaluation result for the project of Consultancy Services for Authority’s Engineer for Supervision of “Four laning of Dolabari to Jamuguri section from km 17.300 of NH-37A to km 182.000 of NH-52 in the State of Assam under SARDP- NE, Phase A. Dated : 15-01-2018
  126. Technical evaluation result for the project of Restoration of road by way of clearance of landslide, surface boulders side drain, culverts including construction of R/wall and B/walls and laying of WBM-I, WBM-II, WBM-III & Bituminous Carpeting on Sinthanpass- Anantnag –Khanabal road (Km 184.00 to Km 265.000) in the state of Jammu & Kashmir. Dated : 12-01-2018 
  127. Technical evaluation result for the project of Consultancy Services for Authority’s Engineer for Supervision of Four laning of Balachera to Harangajao section of NH-54(Ext) from km 275.000 to km 244.000 in the State of Assam on EPC mode. Dated : 10-01-2018
  128. Technical evaluation result for the project of Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-1). (Package 5) Dated : 04-01-2018
  129. Technical evaluation result for the project of Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-1). (Package 4) Dated : 04-01-2018
  130. Technical evaluation result for the project of Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-1). (Package 3) Dated : 04-01-2018
  131. Technical evaluation result for the project of Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-1). (Package 2) Dated : 04-01-2018
  132. Technical evaluation result for the project of Consultancy Services for Authority’s Engineer for Supervision of “Rehabilitaion / Maintenance of newly entrusted Churachandpur-Singhat Sinzawl-Tuivai road section from (i) Km 0.00 to km 34.5 (ii) Km 34.5 to Km 103.1 and (iii) Km 103.1 to Km 161.48 on NH-102B in the state of Manipur on EPC basis. Dated : 02-01-2018