GST No. 07AAECN7759E1Z7
+91-11-23461600
info[at]nhidcl[dot]com
NATIONAL HIGHWAYS & INFRASTRUCTURE DEVELOPMENT CORPORATION LTD.
Ministry of Road Transport & Highways, Government of India
 

Tender Evaluation Result

Tender Evaluation Result


  1. Technical Evaluation Result for Consultancy Services for Authority’s Engineer for  Supervision of Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 66+000 to km 81+000 (Design Chainage 65+923 to 80+930) of Dokmoka – LoringThepi Section (Package-3) of NH-29 in the state of Assam under Bharatmala Pariyojna on EPC mode.. Dated: 27-10-2020.
  2. Technical Evaluation Result for Construction of Lawngtlai bypass (Package-3) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on Engineering, Procurement and Construction (EPC) mode, with Japan International Cooperation Agency (JICA) loan assistance Dated: 27-10-2020.
  3. Technical Evaluation Result for Improvement to 2 Lane with paved shoulder of NH-40 section from Km 131+820 to Km 151+330 (design Km 45+760 to Km 63+530) design length 17.77 km in the State of Meghalaya on EPC Mode under JICA loan Assistance(Package-IV). Dated: 26-10-2020.
  4. Technical Evaluation Result for Improvement to 2 lane with paved shoulder of NH-40 section from Km 81+740 to Km 93+490 (design Km 0+000 to Km 10+670) & Improvement to 4 lane section of NH-44 from design Km 0+000 to Km 0+930, total length 11.600 Km in the state of Meghalaya on EPC mode under JICA Loan Assistance(Package-I ). Dated: 26-10-2020.
  5. Technical Evaluation Result for Selection of Manpower Placement Agency for providing services of Civil Engineers at NHIDCL Headquarters, New Delhi, its Site Offices, Project Monitoring Units (PMUs) and Regional Offices (ROs) of NHIDCL across India. Dated: 26-10-2020.
  6. Technical Evaluation Result for Construction of 2 laning with paved shoulder of new greenfield alignment from Chochenpheri at km. 52+000 to Helipad near Menla at km. 82+000 of Rhenok – Menla spur (NH-717B) Package-IIIA on EPC Basis under SARDP-NE Phase ‘A’ in the State of Sikkim. Dated: 23-10-2020.
  7. Technical Evaluation Result for Construction and upgradation of existing road to 2-lane with Paved shoulder from km. 37+600 (New Rolep Bridge) to km. 52+000 (Chochenpheri) of Rhenok – Menla spur (NH-717B) Package-II C on EPC Basis under SARDP-NE Phase ‘A’ in the State of Sikkim. Dated: 23-10-2020.
  8. Technical Evaluation Result for Construction and Installation of prefabricated Office cum Residence in the States of Arunachal Pradesh, Sikkim & Uttarakhand in high altitude remote areas. Dated: 20-10-2020.
  9. Technical Evaluation Result for Construction and Installation of prefabricated Office cum Residence in the States of Himachal Pradesh & Union Territory of Ladakh in high altitude remote areas. Dated: 20-10-2020.
  10. Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF: (i) Construction of two lane with hard shoulders of Arrowa-Khupa-Hayuliang Section of NH113 from Ch 68.550 Km to 91.633 in the state of Arunachal Pradesh on EPC Mode under NH(O)-NE. (ii) Construction of two lane with hard shoulders of Demwe-Brahmkund section of NH-13 from Ch 0.000 Km to 18.464 in the state of Arunachal Pradesh on EPC Mode under NH(O)-NE. Dated: 20-10-2020.
  11. Technical Evaluation Result for Special repair of NH 702-D, Mokokchung-Mariani Road (from Km 0.000 to 63.000 Km) [Total length – 63.00 Km] in the state of Nagaland for the FY 2020-21. Dated: 19-10-2020.
  12. Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for construction to 2-Lane Tura Bypass between existing km 95+00 to km 101+00 of NH-51 on EPC mode in the State of Meghalaya. Dated: 16-10-2020.
  13. Technical Evaluation Result for Ordinary Repair of NH-08 from Km 436.700 to Km 437.500, Km 456.540 to Km 458.040 & Km 465.00 to Km 479.440 (Total Length = 16.740 Km) in the state of Tripura in the FY 2020-21 on item rate basis. Dated: 16-10-2020.
  14. Technical Evaluation Result for Ordinary repair of NH 208 from 7th Mile to Amarpur tri junction Km 150.000 to Km 188.615 Total length 38.615 km in the State of Tripura in the year of 2020-21 on item rate basis. Dated: 16-10-2020.
  15. Technical Evaluation Result for Consultancy Services for Authority’s Engineer for& Supervision of Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 66+000 to km 81+000 (Design Chainage 65+923 to 80+930) of Dokmoka – LoringThepi Section (Package-3) of NH-29 in the state of Assam under Bharatmala Pariyojna on EPC mode. Dated: 15-10-2020.
  16. Technical Evaluation Result for Consultancy Services for Authority’s Engineer for Supervision Improvement/ widening to 2 lane with earthern shoulder from of Ranikor-BaghmaraMaheshkola road section from Ranikor to Nongjri existing km 0+000 to km 31+700 (design length – 33.250km) on EPC mode in the state of Meghalaya (Package-I). Dated: 15-10-2020.
  17. Technical Evaluation Result for Ordinary Repair of NH -37 of Imphal-Jiribam Road (Km 3.00 to Km 75.00) [Total Length = 72.00 Km] in the state of Manipur in the year 2020-2021. Dated: 13-10-2020.
  18. Technical Evaluation Result for Providing & Installation of Road Safety Measures by fixing of Traffic Sign Board, Construction of Metal Beam Crash Barrier, Road Stud & Road Marking on Shillong – Dawki road of NH-44 in the State of Meghalaya. Dated: 12-10-2020.
  19. Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for 2 laning of Aizawl Bypass including Tunnel (Connecting Sairang on NH306 to NH-02) in the State of Mizoram under Bharatmala Pariyojna. Dated: 09-10-2020.
  20. Technical Evaluation Result for Ordinary repair of NH- 208 from (Boarder of Dhalai and Khowai District) to (Nripen Chakraborty Chowmuhani, Khowai) (Km 85.200 to Km. 108.600) [Total length 23.400 km.] in the State of Tripura in the year of 2020-21 on item rate basis. Dated: 08-10-2020.
  21. Technical Evaluation Result for  Construction of 4 (Four) Minor Bridges at Km 21.717, Km 23.150, Km 88.300 7 Km 92.100 on NH-4 in the Union Territory of Andaman & Nicobar Islands on EPC basis (3 rd Call). Dated: 07-10-2020.
  22. Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for construction to 2-Lane Tura Bypass between existing km 95+00 to km 101+00 of NH-51 on EPC mode in the State of Meghalaya.  Dated: 05-10-2020.
  23. Technical Evaluation Result for Earthwork in Formation, Road Work, Construction of Bridges, Blanketing,P. Way Linking works including Supply of P. Way Fittings and Track Ballast inconnection with Construction of Railway Siding from Jogighopa Railway Stationto MMLP at Jogighopa, Distt. – Bongaigaon, Assam from Ch. 00 to 3760 – PackageIII of MMLP – Third Call. Dated: 01-10-2020.
  24. Technical Evaluation Result for Authority’s Engineer for Improvement and Widening to two lane with paved shoulder of Kailashahar – Khowai section of NH-208 in the state of Tripura on Engineering, Procurement & Construction (EPC) mode – starting near Kirtanthali (near Kailashahar town) at km 21.100 and ending near Ganki in Khowai district at km 101.300 under JICA ODA loan Phase-IV on Engineering, Procurement, Construction (EPC) Mode. Dated: 01-10-2020.
  25. Technical Evaluation Result for Improvement/Widening to 2 Lane with Earthen Shoulder of RanikorMaheshkola-Baghmara road section from Rongara to Panda, existing chainage from km 102+345 to km 119.810 (design Chainage from km 96+000 to km 112.300) design length-16.30km on EPC Mode under ARD-NE ‘Phase-A’in the State of Meghalaya. Dated: 29-09-2020.
  26. Technical Evaluation Result for  Improvement/Widening to 2 Lane with Earthen Shoulder of RanikorMaheshkola-Baghmara road section from Kanai – Rongara, existing chainage from km 85+970 to km 102+345 (design Chainage from km 81+100 to km 96+000) design length-14.763 km on EPC Mode under SARDP-NE Phase-A in the State of Meghalaya. Dated: 29-09-2020.
  27. Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF: (i) Construction and up gradation of 4 lane of existing 2 lane with paved shoulder from Hapachara to Tulungia road of NH-117 of existing km 0.00 to km 14.050 and (Design km 0.000 to km 14.660), (Design length – 14.660 km) on EPC basis in the state of Assam. (ii) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 75.330km to Ch.88.000 km (Design Ch.71.800 to Ch.84.100) of Jogighopa Bridge Approach (Near Pancharatna) – Agia (Near Nichinta) Section (Package-6) of Bilasipura- Guwahati road (NH-17) in the state of Assam on EPC mode. Dated: 29-09-2020.
  28. Technical Evaluation Result for Upgradation of existing road to 2-Lane with Paved Shoulder from Kohima to Mao from Km 185.540 to Km 211.709 (Design length – 26.249) of NH -39 (New NH – 02) under Bharatmala NH(O) – TSP in the state of Nagaland in EPC mode. Dated: 29-09-2020.
  29. Technical Evaluation Result for Part Design, Construction, Operation & Maintenance (For a period of 5 years) of Fully Automatic Multi-level Parking System at Central Civil Secretariat, Itanagar, Arunachal Pradesh. Dated: 28-09-2020.
  30. Technical Evaluation Result for Consultancy services for (i) preparation of DPR for Development of Self-Sustainable Bus Port at Udaipur (Tripura), Baddi (Himachal Pradesh) and Port Blair (Andaman and Nicobar Islands) (ii) Supervision of Development of Self-Sustainable Bus Port at Ramnagar, Uttarakhand AND Empanelment of Consultants for Project Management Consultancy for preparation of Pre-feasibility Report, DPR and carrying out Supervision work for Development of Self-Sustainable Bus Port at various States/UTs throughout the country. Dated: 25-09-2020.
  31. Technical Evaluation Result for work of Construction of two-lane with hard shoulders of Demwe-Brahmkund section of NH-13 from Ch 0.000 Km to 18.464 in the state of Arunachal Pradesh on EPC Mode under NH(O)- NE. Dated: 25-09-2020.
  32. Technical Evaluation Result for Restoration and Repair of RCC Bridge at Imphal-Jiribam Road of NH-37 at Ch: 132.465 (Old Ch: 137.00) in the state of Manipur in the FY 2020-21. Dated: 24-09-2020.
  33. Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of (i) Construction of two lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) From existing km 7.880 (near Chedama Junction) to existing km 30.474 (near Chakahabama) [Design Km 7.88 to design Km 29.6] [Design Length – 21.72 Km] in the state of Nagaland Under Bharatmala Pariyojana on EPC Mode (Package-I) (ii) Construction of two lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) From existing km 30.474 (near Kidwema road Chakahabama) to existing km 53.220 (near Kikruma Village) [ Design Km 29.6 to design Km 51.5] [Design Length – 21.90 Km] in the state of Nagaland under Bharatmala Pariyojna on EPC Mode (Package II)” (iii) Construction of two lane with hard shoulder of Kohima-jessami Road on NH-29 (Old NH-150) from existing km 53.220 (near Kikruma Village) to existing km 76.320 (near Mesulumi Village) [ Design Km 51.5 to design Km 74.2] [Design Length – 22.7 Km] in the state of Nagaland Under Bharatmala Pariyojna on EPC Mode (Package III). Dated: 24-09-2020.
  34. Technical Evaluation Result for Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 10.500 to design Km 21.00 [Design Length – 10.500 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package II) Opening of Financial bid Dated: 23-09-2020.
  35. Technical Evaluation Result for  Empanelment of consultants for Waste Management consisting of collection, handling, storage and transportation of Municipal Solid Waste to the designated waste processing site. Dated: 22-09-2020.
  36. Technical Evaluation Result for EOI for Authority’s Engineer for Improvement and Widening to two lane with paved shoulder of Kailashahar – Khowai section of NH-208 in the state of Tripura on Engineering, Procurement Construction (EPC) mode – starting near Kirtanthali (near Kailashahar town) at km 21.100 and ending near Ganki in Khowai district at km 101.300 under JICA ODA loan Phase-IV on Engineering, Procurement, Construction (EPC) Mode. Dated: 17-09-2020.
  37. Technical Evaluation Result for  Construction of 2-lane specification road with paved shoulder including tunnel (300m) at Ranbangla on NH-510 (Singrtam-Tarku-Rabongal-Legaship-Gyalshing) Package-III (Design Chainage from Km 32.500 to Km 33.600) under SARDP-NE “A” on EPC basis in the State of Sikkim – Result of Technical Evaluation – reg.Dated: 16-09-2020.
  38. Technical Evaluation Result Consultancy services for Authority’s Engineer for Supervision of (i) Construction of two lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) From existing km 7.880 (near Chedama Junction) to existing km 30.474 (near Chakahabama) [Design Km 7.88 to design Km 29.6] [Design Length – 21.72 Km] in the state of Nagaland Under Bharatmala Pariyojana on EPC Mode (Package-I) (ii) Construction of two lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) From existing km 30.474 (near Kidwema road Chakahabama) to existing km 53.220 (near Kikruma Village) [ Design Km 29.6 to design Km 51.5] [Design Length – 21.90 Km] in the state of Nagaland under Bharatmala Pariyojna on EPC Mode (Package II)” (iii) Construction of two lane with hard shoulder of Kohima-jessami Road on NH-29 (Old NH-150) from existing km 53.220 (near Kikruma Village) to existing km 76.320 (near Mesulumi Village) [ Design Km 51.5 to design Km 74.2] [Design Length – 22.7 Km] in the state of Nagaland Under Bharatmala Pariyojna on EPC Mode (Package III). Dated: 16-09-2020.
  39. Final Shortlisted Result Improvement into two-lane with paved shoulder/four-lane of NH-40 between Shillong to Dawki section including the construction of Dawki bridge Design length = 63.91 Km (Ch. 0.000 To Ch. 71.520 of NH-40 & Ch. 0.000 to Ch. 0.900 of NH-44) (Package-I, II, IV & V) excluding pynursula bypass in Meghalaya under JICA loan assistance (2nd Phase) on Engineering, Procurement, Construction (EPC) Mode. Dated: 15-09-2020.
  40. Technical Evaluation Result for Rehabilitation and Up-gradation of road from design km 31.300 to km 45.300 (Total length : 14.000 km) of Agartala – Khowai section on NH 108 B to two lane with paved shoulder in the state of Tripura on EPC basis (package III) – Financial Bid Opening – Reg. Dated: 15-09-2020.
  41. Technical Evaluation Result for Construction of Chhiahtlang and Serchhip bypass (Package-1) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on EPC mode, with JICA loan assistance. Dated: 14-09-2020.
  42. Technical Evaluation Result for selection of manpower Placement Agency for providing services of Middle Management  Personnel (such as IT, Charted accountant, Legal and other professional staff) at NHIDCL Headquarters, New Delhi, Project Monitoring Units(PMUs) and Regional Offices (ROs) of NHIDCL across India. Dated: 11-09-2020.
  43. Technical Evaluation Result for Construction of 2-lane specification road with Paved shoulder asre-alignment (Greenfield alignment) of existing stretch between Legship to Gyalshing of NH-510 (Design chainage from km 75.000 to km 90.210) under SARDP-NE Phase’A’ on EPC mode in the state of Sikkim (Package-VI) – reg. Dated: 11-09-2020.
  44. Technical Evaluation Result for Construction of 2-lane specification road with Paved shoulder as re-alignment (Greenfield alignment) of existing stretch between Legship to Gyalshing of NH-510 (Design chainage from km 58.840 to km 75.00) under SARDP-NE Phase’A’ on EPC mode in the state of Sikkim (Package-V) – reg. Dated: 11-09-2020.
  45. Technical Evaluation Result for Consultancy Services for 09 Months for Supervision of “Restoration and Repairs of NH-129A from 7th mile junction, Dimapur to Mhaikam (Km 0.0 to 16.0) [Length=16 Km] and from Manipur/Nagaland Border (Dzuko Bridge) to Mhainamtsi (Km 0.0 to Km 39.0) [Length=39 Km] in the State of Nagaland in the FY 2020-21.Dated: 10-09-2020.
  46. Technical Evaluation Result for Construction of 2 laning with Hard shoulder of Peren- Dimapur section on NH 129A from Design Km 109.494 to Km 126.775 (Length – 17.281 Km) in the state of Nagaland on EPC mode (Package I) under NH(O)- TSP. Dated: 08-09-2020.
  47. Technical Evaluation Result for Construction of 2-lane specification road with Paved shoulder as re-alignment (Greenfield alignment) of existing stretch between Legship to Gyalshing of NH-510 (Design chainage from km 58.840 to km 75.00) under SARDP-NE Phase’A’ on EPC mode in the state of Sikkim (Package-V) – reg. Dated: 08-09-2020.
  48. Technical Evaluation Result for Construction of 2-lane specification road with Paved shoulder asre-alignment (Greenfield alignment) of existing stretch between Legship to Gyalshing of NH-510 (Design chainage from km 75.000 to km 90.210) under SARDP-NE Phase’A’ on EPC mode in the state of Sikkim (Package-VI) – reg. Dated: 08-09-2020.
  49. Technical Evaluation Result for Empanelment of consultants for Comprehensive Flood Management or River Training works/Canal Works/River Front Development to be carried out in various part of India including J&K- Technical result-reg. Dated: 07-09-2020
  50. Technical Evaluation Result for Restoration and Repair (R&R) for two lane road of NH-208, from Saikabari to Lentibari (Boarder of Dhalai and Khowai District) (Ch 61.00 Km to Ch 85.200 km) (Total Length=24.200 Km) in the state of Tripura in the FY 2020-21 on percentage rate basis-Uploading of technical result-reg. Dated: 07-09-2020
  51. Technical evaluation for Construction of 2 laning with Hard shoulder of Peren- Dimapur section on NH 129A from Design Km 109.494 to Km 126.775 (Length – 17.281 Km) in the state of Nagaland on EPC mode (Package I) under NH(O)- TSP.Technical Evaluation Result for Rehabilitation and Up-gradation to 2 lane with Paved shoulder of NH-510 (Singtam-Tarku-Rabongla-Legship-Gyalshing). Dated: 04-09-2020.
  52. Technical Evaluation Result for Rehabilitation and Up-gradation to 2 lane with Paved shoulder of NH-510 (Singtam-Tarku-Rabongla-Legship-Gyalshing) Package -IV (Design Chainage from Km 33+600 to Km 58+840) in the state of Sikkim in EPC mode. Dated: 28-08-2020.
  53. Technical Evaluation Result for Improvement/ Up-gradation of existing 2-Lane Road to 4-Lane Divided Highway from TaphuKuki to Daili section (Pkg 4A) of Imphal-Kohima road (NH-39) (Design Chainage from Km262+175 to Km274+610) in the state of Manipur on EPC Mode.Dated: 28-08-2020.
  54. Technical Evaluation Result for Improvement/ Up-gradation to 4-Lane Divided Highway from Kuraopokpi to Sekmai section (Pkg-5A) of Imphal Kohima Road (NH-39) (Design Chainage from Km 287+000 to Km 297+700) in the state of Manipur. Dated: 27-08-2020.
  55. Technical Evaluation Result for Improvement/ Up-gradation of existing 2-Lane Road to 4-Lane Divided Highway from Daili to Kuraopokpi section (Pkg-4B) of Imphal Kohima Road (NH-39) (Design Chainage from Km 274+610 to Km 287+000) in the state of Manipur on EPC Mode. Dated: 27-08-2020.
  56. Technical Evaluation Result for Consultancy services for (i) preparation of DPR for Development of Self-Sustainable Bus Port at Udaipur (Tripura), Baddi (Himachal Pradesh) and Port Blair (Andaman and Nicobar Islands) (ii) Supervision of Development of Self-Sustainable Bus Port at Ramnagar, Uttarakhand AND Empanelment of Consultants for Project Management Consultancy for preparation of Pre-feasibility Report, DPR and carrying out Supervision work for Development of Self-Sustainable Bus Port at various States/UTs throughout the country. Dated: 27-08-2020.
  57. Technical Evaluation Result for Construction of two-lane with hard shoulders of Arrow-Khupa-Hayuliang Section from Ch 68.550 Km to 91.633 in the state of Arunachal Pradesh on EPC Mode under NH(O)-NE. Dated: 26-08-2020.
  58. Technical Evaluation Result for Strengthening & Upgradation of existing carriageway to the intermediate lane from Km 0.000 to Km 42.820 of length 42.820Kms on Baramulla-Gulmarg section of NH-701A in the Union Territory of Jammu & Kashmir on EPC mode. Dated: 26-08-2020.
  59. Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 75.330km to Ch.88.000 km (Design Ch.71.800km to Ch.84.100km) of Jogighopa Bridge Approach (Near Pancharatna) – Agia (Near Nichinta) Section (Package-6) of Bilasipura- Guwahati road (NH 17) in the state of Assam under Bharatmala Pariyojana on EPC mode. Dated: 20-08-2020.
  60. Technical Evaluation Result for widening and upgradation to 2 lane with paved shoulder configuration and geometric improvement from km 298.000 to km 339.000 on Aizawl-Tuipang Section of NH-54 in the State of Mizoram with JICA loan assistance. Dated: 20-08-2020.
  61. Technical Evaluation Result for Construction of (i) Connecting road from Z-Morh Tunnel to Zojila Tunnel and (ii) 14.150 km long bi-directional tunnel across Zojila Pass on Sonamarg-Kargil section of NH-01 on EPC mode in the Union Territories of J&K and Ladakh. Dated: 18-08-2020.
  62. Technical Evaluation Result for work of Construction and up-gradation of existing road to 2-lane with paved shoulder of Bagrakot-Kafer section of NH-717A from km 13.000 to km 25.600 on EPC basis under SARDP-NE Phase’A’ in the state of West Bengal (Package IV B) – 2nd Call. Dated: 14-08-2020.
  63. Technical Evaluation Result for Construction of two-lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 32.00 to design Km 43.454 [Design Length – 11.454 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package IV). Dated: 29-07-2020.
  64. Technical Evaluation Result for Construction of two-lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 0.00 to design Km 10.500 [Design Length – 10.500 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package I). Dated: 29-07-2020.
  65. Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 66+000 to km 81+000 (Design Chainage 65+923 to 80+930) of Dokmoka – LoringThepi Section (Section 3) of NH-29 in the state of Assam under Bharatmala Pariyojna on EPC mode. Dated: 28-07-2020.
  66. Technical Evaluation Result for Additional Work for Construction of Landslide Protection Gallery, Slope Protection works including Cattle Fence, Restoration of Irrigation Channel and River Protection Work at Bareti, Uttarkashi from Km 100.300 to km 101.060 of NH-34 on EPC basis in the State of Uttarakhand. Dated: 24-07-2020.
  67. Technical Evaluation Result for Restoration of road by construction of Protection Walls, Cross Drainage Works & Fixtures of Road Safety Furniture from Km 0.000 to Km 170.000 (NH244) on Batote-KishtwarSinthanpass road in UT of Jammu & Kashmir.Dated: 23-07-2020.
  68. Technical Evaluation Result for Construction and up gradation of existing road to 2-lane with paved shoulder including geometric improvement of section from start of Pedong Bypass to Reshi Border Km 79+700 to Km 96+254 of NH-717A under SARDP-NE Phase ‘A’ on EPC basis in the state of West Bengal- Package VB (2nd Call). Dated: 22-07-2020.
  69. Opening of Financial Bid for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B (Pkg IA, IB, IIA, IIB, IVA & IVB) in the State of Manipur.Dated: 21-07-2020.
  70. Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for “construction to 2-Lane Tura Bypass between existing km 95+00 to km 101+00 of NH-51 on EPC mode in the State of Meghalaya. Dated: 21-07-2020.
  71. Technical Evaluation Result for (i)Construction/ up-gradation of existing road to 2-lane with Paved shoulder from km 40.00 (Kafer) to km 61.100 (Lava More) of the Kafer to Reshi border section of NH-717A on EPC Basis under SARDP-NE Phase A in the State of West Bengal (PKG-VA) & (ii) construction and upgradation of existing road to 2 lane with paved shoulder including geometric improvement of section from start of Pedong bypass to Reshi border of NH-717A from km 79.700 to km 96.254 on EPC basis on SARDP-NE Phase-A in the State of West Bengal (PKG-VB). Dated: 20-07-2020.
  72. Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF (i) Rehabilitation and up-gradation of road from design km 0.000 to km 16.290 (Total length: 16.290 km) of Manu-Lalchara section on NH 44A to two lane with paved shoulder (ii) Rehabilitation and up-gradation of road from km 46.597 to km 66.845 (Total length: 20.248 km) of Kanchanpur- Vaghmun section on NH-44A to two lane with paved shoulder in the state of Tripura on EPC basis. Dated: 20-07-2020.
  73. Technical Evaluation Result for Rehabilitation and up-gradation of road from design km 0.00 to km 36.460 (Package-I, II & III) of Kailashahar – Kurti Bridge section on NH 208 A to two lanes with paved shoulder (ii) Rehabilitation and up- gradation of road from km 0.000 to km 18.600 (Total length: 18.600 km) of Kumarghat-Kailashahar section on NH-208 to two lane with paved shoulder in the state f Tripura on EPC Basis. Dated: 20-07-2020.
  74. Technical Evaluation Result forRequest for Proposal for Empanelment of consultants for the Augmentation of Water Supply Scheme including distribution network/Retrofitting and Rehabilitation of the existing water supply network in various parts of India including J&K. Dated: 13-07-2020.
  75. Technical Evaluation Result for Construction of Hnathial bypass (Package-2) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on Engineering, Procurement and Construction (EPC) mode, with Japan International Cooperation Agency (JICA) loan assistance. Dated: 10-07-2020.
  76. Technical Evaluation Result for Construction of Lawngtlai bypass (Package-3) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on Engineering, Procurement and Construction (EPC) mode, with Japan International Cooperation Agency (JICA) loan assistance. Dated: 09-07-2020.
  77. Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Construction and up gradation of 4 lane of existing 2 lane with paved shoulder from Hapachara to Tulungia road of NH-117 of existing Km 0.00 to Km 14.050 and (Design KM 0.000 to Km 14.660), (Design length – 14.660 Km) on EPC basis in the State of Assam under Bharatmala Pariyojana in Economic Corridors. Dated: 08-07-2020.
  78. Technical Evaluation Result for Restoration/Rehabilitation of Churachandpur-Tipaimukh Road (NH-150) Km 9.00 to Km 70.00 (Total Length-61 km) in the state of Manipur. Dated: 08-07-2020.
  79. Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF (i) Improvement and Widening to two lanes with paved shoulders of Jolaibari – Belonia (from km 0.000 to km 21.412) section of NH-108A in the state of Tripura & (ii) Strengthening of Churabari-Agartala section with paved shoulder of NH-08 (74.856km) in the State of Tripura on EPC Mode. Dated: 08-07-2020.
  80. Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF (i) Rehabilitation and up-gradation of road from design km 6.50 to km 45.300 (Package-I, II & III) of Agartala – Khowai section on NH 108 B to two lanes with paved shoulder (ii) Improvement and Widening to two laning with paved shoulder of Khayerpur –Amtali (Agartala) Section from km 0.00 to km 12.900 of NH-8 in the State of Tripura on EPC basis. Dated: 06-07-2020.
  81. Technical Evaluation Result for Ordinary Repair of NH -102A from Koubrulekha- Tendongyan (Km 287.500 to Km 304.00) [Total Length = 16.500 km] in the state of Manipur in the year 2020-2021. Dated: 03-07-2020.
  82. Technical Evaluation Result for Restoration and Repair of NH102A from Dungrai JunctionLamlang Gate (Km 0.00 to Km 11.60) [Total Length = 11.60 km] in the state of Manipur in the year 2020- 2021(2nd Call) Dated: 03-07-2020.