GST No. 07AAECN7759E1Z7
CIN : U45400DL2014GOI269062
A-
A
A+
A+
English
हिन्दी
(
Hindi
)
National Highways & Infrastructure Development Corporation Ltd.
Ministry of Road Transport & Highways, Government of India
Home
About
About Us
Our Organisation
Who’s who
Our Mission
Our Vision
Honourable Minister’s Message
Annual Report
2021-2022
2020-2021
2019-2020
2018-2019
2017-2018
2016-2017
2015-2016
2014-2015
CSR
Annual Return of NHIDCL
2020
2021
2022
Skill Development Training Program
International Cooperation
RTI
GST Cell
MoA(Memorandum of Association) & Notices
Dispute Resolution Mechanism
Internal Complaints Committee (ICC)
Chief Vigilance officer (CVO)
Independent External Monitor (IEM)
Projects
Current Status
All States
Andaman & Nicobar
Arunachal Pradesh
Assam
Himachal Pradesh
Manipur
Meghalaya
Mizoram
Nagaland
Sikkim
Tripura
Union Territory of Jammu & Kashmir
Union Territory of Ladakh
Uttarakhand
West Bengal
Nepal
Project Archive
Maps
Andaman & Nicobar
Arunachal Pradesh
Assam
Himachal Pradesh
Manipur
Meghalaya
Mizoram
Nagaland
Sikkim
Tripura
Union Territory of Jammu & Kashmir
Union Territory of Ladakh
Uttarakhand
West Bengal
Nepal
e Book
NHIDCL 2016
NHIDCL 2015
Guidelines on LA
Infracon
INAM-Pro
INAM-Pro Brochure
BGMS
Sugampath
IT Task Force
Essential Safety for Hill Roads
Standardization of Reporting Responsibilities for AEs & IEs
Appropriate Technologies for Soil & Slope Stabilization
ePace
BIMS Brochure
eAccess
The Motor Vehicles Act, 1988
The Central Motor Vehicles Rules, 1989
Hill Road Manual
Tenders
Current Tenders
Tender Archive
eAuction
Current eAuction
Archive eAuction
Black List / Debarment
Termination
Negative List
Non-Performer
List of Banks
Links
Bank of Ideas
NHIDCL Email
INAM-Pro
INFRACON
BG Management
Bhoomirashi
eDMS
eOffice
SAP
PMIS
BiMS
eProcurement
Grievance Redressal
CPGRAMS
ePACE
India Investment Grid (IIG)
eSamiksha Monitoring
eSamiksha Review
eSuvidha
Ministry of Road Transport & Highways
OCMS
VIP References
IAHE
National Highways Authority of India
IRC
Ministry of External Affairs
Ministry of Shipping
MSME SAMBANDH
Events
Blogs
Images
Videos
Official Language Gallery
Web Portal Videos
Presentation
Employee Portal
Career
Current Openings
Opening Archive
Contact
Corporate Office
Details of NHIDCL Officers & Staff on Deputation/ Contract
Field Offices
Feedback
NHIDCL Directory Application
Home
About
About Us
Our Organisation
Who’s who
Our Mission
Our Vision
Honourable Minister’s Message
Annual Report
2021-2022
2020-2021
2019-2020
2018-2019
2017-2018
2016-2017
2015-2016
2014-2015
CSR
Annual Return of NHIDCL
2020
2021
2022
Skill Development Training Program
International Cooperation
RTI
GST Cell
MoA(Memorandum of Association) & Notices
Dispute Resolution Mechanism
Internal Complaints Committee (ICC)
Chief Vigilance officer (CVO)
Independent External Monitor (IEM)
Projects
Current Status
All States
Andaman & Nicobar
Arunachal Pradesh
Assam
Himachal Pradesh
Manipur
Meghalaya
Mizoram
Nagaland
Sikkim
Tripura
Union Territory of Jammu & Kashmir
Union Territory of Ladakh
Uttarakhand
West Bengal
Nepal
Project Archive
Maps
Andaman & Nicobar
Arunachal Pradesh
Assam
Himachal Pradesh
Manipur
Meghalaya
Mizoram
Nagaland
Sikkim
Tripura
Union Territory of Jammu & Kashmir
Union Territory of Ladakh
Uttarakhand
West Bengal
Nepal
e Book
NHIDCL 2016
NHIDCL 2015
Guidelines on LA
Infracon
INAM-Pro
INAM-Pro Brochure
BGMS
Sugampath
IT Task Force
Essential Safety for Hill Roads
Standardization of Reporting Responsibilities for AEs & IEs
Appropriate Technologies for Soil & Slope Stabilization
ePace
BIMS Brochure
eAccess
The Motor Vehicles Act, 1988
The Central Motor Vehicles Rules, 1989
Hill Road Manual
Tenders
Current Tenders
Tender Archive
eAuction
Current eAuction
Archive eAuction
Black List / Debarment
Termination
Negative List
Non-Performer
List of Banks
Links
Bank of Ideas
NHIDCL Email
INAM-Pro
INFRACON
BG Management
Bhoomirashi
eDMS
eOffice
SAP
PMIS
BiMS
eProcurement
Grievance Redressal
CPGRAMS
ePACE
India Investment Grid (IIG)
eSamiksha Monitoring
eSamiksha Review
eSuvidha
Ministry of Road Transport & Highways
OCMS
VIP References
IAHE
National Highways Authority of India
IRC
Ministry of External Affairs
Ministry of Shipping
MSME SAMBANDH
Events
Blogs
Images
Videos
Official Language Gallery
Web Portal Videos
Presentation
Employee Portal
Career
Current Openings
Opening Archive
Contact
Corporate Office
Details of NHIDCL Officers & Staff on Deputation/ Contract
Field Offices
Feedback
NHIDCL Directory Application
Home
About
About Us
Our Organisation
Who’s who
Our Mission
Our Vision
Honourable Minister’s Message
Annual Report
2021-2022
2020-2021
2019-2020
2018-2019
2017-2018
2016-2017
2015-2016
2014-2015
CSR
Annual Return of NHIDCL
2020
2021
2022
Skill Development Training Program
International Cooperation
RTI
GST Cell
MoA(Memorandum of Association) & Notices
Dispute Resolution Mechanism
Internal Complaints Committee (ICC)
Chief Vigilance officer (CVO)
Independent External Monitor (IEM)
Projects
Current Status
All States
Andaman & Nicobar
Arunachal Pradesh
Assam
Himachal Pradesh
Manipur
Meghalaya
Mizoram
Nagaland
Sikkim
Tripura
Union Territory of Jammu & Kashmir
Union Territory of Ladakh
Uttarakhand
West Bengal
Nepal
Project Archive
Maps
Andaman & Nicobar
Arunachal Pradesh
Assam
Himachal Pradesh
Manipur
Meghalaya
Mizoram
Nagaland
Sikkim
Tripura
Union Territory of Jammu & Kashmir
Union Territory of Ladakh
Uttarakhand
West Bengal
Nepal
e Book
NHIDCL 2016
NHIDCL 2015
Guidelines on LA
Infracon
INAM-Pro
INAM-Pro Brochure
BGMS
Sugampath
IT Task Force
Essential Safety for Hill Roads
Standardization of Reporting Responsibilities for AEs & IEs
Appropriate Technologies for Soil & Slope Stabilization
ePace
BIMS Brochure
eAccess
The Motor Vehicles Act, 1988
The Central Motor Vehicles Rules, 1989
Hill Road Manual
Tenders
Current Tenders
Tender Archive
eAuction
Current eAuction
Archive eAuction
Black List / Debarment
Termination
Negative List
Non-Performer
List of Banks
Links
Bank of Ideas
NHIDCL Email
INAM-Pro
INFRACON
BG Management
Bhoomirashi
eDMS
eOffice
SAP
PMIS
BiMS
eProcurement
Grievance Redressal
CPGRAMS
ePACE
India Investment Grid (IIG)
eSamiksha Monitoring
eSamiksha Review
eSuvidha
Ministry of Road Transport & Highways
OCMS
VIP References
IAHE
National Highways Authority of India
IRC
Ministry of External Affairs
Ministry of Shipping
MSME SAMBANDH
Events
Blogs
Images
Videos
Official Language Gallery
Web Portal Videos
Presentation
Employee Portal
Career
Current Openings
Opening Archive
Contact
Corporate Office
Details of NHIDCL Officers & Staff on Deputation/ Contract
Field Offices
Feedback
NHIDCL Directory Application
Tender Evaluation Result 2022
Tender Evaluation
Result 2022
Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 169.570 km to 205.974 Km (PKG-7) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode. Dated : 30-12-2022.
Technical Evaluation Result for Consultancy Services for Authority’s Engineer for Supervision of “Construction of Meka-Roing-Hunli from existing Km 16 of Roing Hunli Road to Km 21.5 of Hunli-Anini Road (Total Length = 74.863 Km) to NH double lane specification in Arunachal Pradesh on Engineering Procurement and Construction (EPC) basis.”. Dated : 22-12-2022.
Technical Evaluation Result for Restoration & Rehabilitation of NH-02 of Imphal-Kohima Road from existing chainage Km 287.00 to Km 299.60 [Total Length = 12.60 Km] in the state of Manipur in the FY 2022-23 on Item Rate mode. Dated : 05-12-2022.
Technical Evaluation Result for Installation of View Cutters on elevated structure near BSF Campus in village Paloura from Km. 3+430 to Km. 4+930 for a length of 1.50 km in Jammu-Akhnoor Road section of NH-144A in the UT of Jammu & Kashmir in the FY 2022-23. Dated : 25-11-2022.
Technical Evaluation Result for Snow Clearance from km 143.00 to km 235.00 on Batote-KishtwarChatroo-Sinthanpass-Khanabal road of NH-244, to make road stretch traffic worthy during winter season, in the UT of Jammu & Kashmir, for a period of 5 years (2nd Call). Dated : 25-11-2022.
Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage 50.850 Km to 81.870 Km (Package 3) in the State of Manipur on EPC mode. Dated : 18-11-2022.
Technical Evaluation Result for Improvement/ Up-gradation to 4-Lane Divided Highway from Kuraopokpi to Sekmai section (Pkg-5A) of Imphal Kohima Road (NH-39) (Design Chainage from Km 287+000 to Km 297+700) in the state of Manipur. Dated : 18-11-2022.
Technical Evaluation Result for “Restoration and Repair of NH-39 (new NH-29) from existing Dimapur- Kohima road (Km 156.000 to Km 172.900) [Length=16.90 Km] in the State of Nagaland in the FY 2022-23” – (Percentage Rate and Work Order Basis) – 2nd Call. Dated : 17-11-2022.
Technical Evaluation Result for Upgradation of Existing 2-lane Highway to 4 lane with Paved Shoulder configuration from Km 26.350 (Design Chainage 26+615) (Khati Chowk) to Km 30.097 (Design Chainage 30+359) (Hanuman Chowk) including bridge on Chenab river of Jammu – Akhnoor Section of NH-144A in the UT of Jammu & Kashmir on EPC basis. (Pkg – IIIB). Dated : 25-10-2022.
Technical Evaluation Result for CONSTRUCTION/ UPGRADATION OF EXISTING ROAD TO 2-LANE WITH PAVED SHOULDER INCLUDING GEOMETRIC IMPROVEMENT FROM RANIPOOL TO PAKYONG FROM KM 2.000 TO KM 16.167 (BALANCE WORK) OF NH-717-A ON EPC BASIS UNDER SARDP-NE PHASE-A IN THE STATE OF SIKKIM. Dated : 21-10-2022.
Technical Evaluation Result for Re-Construction/Shifting of affected structures (Boundary Wall) premises to Assam Rifles under Fultali- Jurichhara section of NH-208 in the State of Tripura on percentage basis & work order basis. (2nd Call). Dated : 19-10-2022.
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: Rehabilitation and Upgradation of Nongstoin-Rambrai-Kyrshai road up to Meghalaya-Assam Border from km 0.335 to km 34.039 to 2-Lane under SARDP-NE “Phase-A” in the state of Meghalaya on EPC mode (Package-I). Dated : 03-10-2022.
Technical Evaluation Result for Annual Maintenance Work on NH-10 from Km 66 Singtam Shantinagar to Km 80 Indian Oil Fuel Station in the state of Sikkim on Percentage Contract Basis for FY 2022-23. Dated : 03-10-2022.
Technical Evaluation Result for Annual Maintenance Work on NH-10 from Km 52 Rangpo to Km 66 Singtam Shantinagar in the state of Sikkim on Percentage Contract Basis for FY 2022-23. Dated : 03-10-2022.
Technical Evaluation Result for CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF (I) Construction of a 4 lane flyover with paved shoulder configuration for along with service road from 4 th Tawi bridge (D.Ch. 0.000) near Bhagwati chowk to Canal Head (D.Ch. 1.350) on Jammu-Akhnoor road section of NH-144A in UT of J&K on EPC mode.(P-I)& (II) Upgradadtion of Existing 2-lane Highway to 4 lane with Paved Shoulder configuration from Km 26.350 (Design Chainage 26+615) (Khati Chowk) to Km 30.097 (Design Chainage 30+359) (Hanuman Chowk) including bridge on Chenab river of Jammu – Akhnoor Section of NH 144A in the Union Territory of Jammu & Kashmir on EPC basis. (Pkg – IIIB). Dated : 03-10-2022.
Technical Evaluation Result for Re-Construction/Shifting of affected structures (Boundary Wall) premises to Assam Rifles under Fultali- Jurichhara section of NH-208 in the State of Tripura on percentage basis & work order basis. Dated : 19-09-2022.
Technical Evaluation Result for Four laning of Demow (534.800) to End of Moran bypass (Km 561.700) of NH-37 including Emergency Landing Facility (ELF) in the State of Assam under on EPC Mode. Dated : 19-09-2022.
Technical Evaluation Result for Restoration & Rehabilitation of Imphal-Kohima Road from Km 212.325 to Km 263.00 (Length: 50.675 Km) of NH-02 in the state of Manipur in the year 2022-2023 on EPC mode. Dated : 10-09-2022.
Technical Evaluation Result for award of rate contract for repair and maintenance (including supply of requisite material/parts) of office furniture & fixture misc day to day items, plumbing, carpentry work etc. at National Highways & Infrastructure Development Corporation Ltd (NHIDCL) at its office at Ground, 2nd, 3rd Floor of PTI Building & its office at Jeevan Tara Building, New Delhi and any other office space in Delhi/New Delhi. Dated : 31-08-2022.
Technical Evaluation Result for award of rate contract for misc. electrical maintenance work including providing and fixing of required electrical items at National Highways & Infrastructure Development Corporation Ltd (NHIDCL) at its office at Ground, 2nd, 3rd Floor of PTI Building & its office at Jeevan Tara Building, New Delhi and any other office space in Delhi/New Delhi. Dated : 30-08-2022.
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Improvement/widening to Two laning with earthen shoulder of Nongjri (Design Ch. 30.00km) to Maheshkola (Design Ch. 55.525km) [R-M-B PackageII] on SH-4 section of Ranikor- Maheshkhola-Baghmara Project in the state of Meghalaya on EPC basis. (ii) Improvement/widening to two-lanning of stretch from km 55.525 to km 79.680 of Ranikhor- Baghmara Project in the state of Meghalaya under “SARDP-NE” Phase-A on EPC mode (Package-III). (iii) Improvement/widening to Two-laning with earthen shoulder of Panda (Design Ch. 112.300 km) to Baghmara (Design Ch. 129.385 km) [R-M-B Package-VI] on SH-4 section of Ranikor- Maheshkhola-Baghmara Project in the state of Meghalaya on EPC basis. Dated : 29-08-2022.
Technical Evaluation Result for SELECTION OF CONSULTANTs/ NGOs TO ASSIST IN IMPLEMENTATION OF RESETTLEMENT ACTION PLAN FOR: “UP-GRADATION /WIDENING AND CONSTRUCTION OF 4 – LANE WITH PAVED SHOULDERS FROM SRIRAMPUR TO DHUBRI (LENGTH 54.154 KM) OF NH-127B IN THE STATE OF ASSAM UNDER JICA ODA LOAN ASSISTANCE (PHASE-V) ON EPC MODE.”. Dated : 25-08-2022.
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Km 146+230 to Km 157+460 (Design Chainage 145+712 to Km 156+502) of Dillai to Lahorijan (Package – 7) of NH-29 in the State of Assam on EPC Mode under NH(O)-NE. Dated : 22-08-2022.
Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report and providing Pre- Construction activities for Construction of New NHs the highway starting from its junction with NH-37 near Pailapool connecting Jaipur, Harinagar, Kumarcherra, Zinam, Hagrum and terminating at its junction with NH-137(Mahur-Tamenglomg Road) in the state of Assam. Dated : 22-08-2022.
Technical Evaluation Result for Maintenance & Repairs of NH-39 (new NH-29) from existing Dimapur- Kohima road (Km 156.000 to Km 172.900) [Length=16.90 Km] in the State of Nagaland in the FY 2022-23” – (Percentage Rate and Work Order Basis, at “Risk and Cost” of EPC Contractor). Dated : 20-08-2022.
Technical Evaluation Result for Appointment of a Creative Agency for providing a Creative/communication strategy and creative designs etc to Ministry of Road Transport & Highways and its allied agencies. Dated : 08-08-2022.
Technical Evaluation Result for Ordinary Repair of Ukhrul-Jessami Road section from Km 0.00 to Km 63.00 covering 63.00 Km length on NH 202 in the state of Manipur on Item Rate basis in FY 2022-23. Dated : 05-08-2022.
Final Technical Evaluation Result for CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF i) Up-gradation to two lane with Paved shoulder from Km. 12+850 to Km.20+300 of 7.450 Km. length on Goha-Khellani section and a link road to Goha Village of 2.016 Km on NH-244 in Union Territory of Jammu & Kashmir on EPC mode. (ii) Up-gradation to two lane with paved shoulder from Km 20+300 to Km29+030 of 8.730 Km length on Goha-Khellani section on NH-244 in Union Territory of Jammu & Kashmir on EPC mode. (iii) Construction of Bi-directional Tunnel at “Km 83” of Length 495 m along with approach road of 664 m and a Major Bridge of 110 m between Km 82+675 to Km 82+925 on NH-244 in Union Territory Jammu & Kashmir on EPC mode. Dated : 04-08-2022.
Final Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Construction of Two lanning with Hard Shoulder Road of Ukhrul – Toloi – Tadbui section of NH-102A from Design Chainage 50.850 km to 81.870 km (Package-3) in the State of Manipur on EPC Mode; (ii) Construction of Two lanning with Hard Shoulder Road of Ukhrul – Toloi – Tadbui section of NH-102A from Design Chainage 81.870 km to 105.825 km (Package-4) in the State of Manipur on EPC Mode. Dated : 02-08-2022.
Technical Evaluation Result for Construction of a 4 lane flyover with paved shoulder configuration for along with service road from 4th Tawi bridge (D.Ch. 0.000) near Bhagwati chowk to Canal Head (D.Ch. 1.350) on Jammu-Akhnoor road section of NH-144A in UT of J&K on EPC mode.(P-I). Dated : 01-08-2022.
Technical Evaluation Result for Supply of Pantry Items at National Highways & Infrastructure Development Corporation Ltd (NHIDCL) HQ at its office at PTI Building, Jeevan Tara Building, New Delhi and any other office space in Delhi/New Delhi. Dated : 01-08-2022.
Technical Evaluation Result for Restoration of road by way of clearance of landslides, Snow including construction of R/Wall, B/Wall and laying of WBM-III, BM and BC on Chatroo-Singpora road From km 0.000 to km 19.600 in the UT of Jammu & Kashmir for FY 2022-23. Dated : 28-07-2022.
Technical Evaluation Result for Widening / Improvement to 4 (Four) Lane with Paved Shoulder configuration of existing single lane road from Kachukhana Harichara Paglagaunj to Dhubri – Phulbari Bridge approach (Package-II) of Srirampur – Dhubri Section of NH-127B from existing Km 28.050 to Km 55.060 (Design Km 27.650 to Km 54.154), (Design Length=26.504 Km) on EPC Mode in the State of Assam under JICA – ODA loan assistance. Dated : 28-07-2022.
Technical Evaluation Result for Repair and Maintenance of National Highway (NH-40) (Ch. km 81+740 to km 93+490, Ch. Km 123+800 to km Ch 131+820, Ch km 151+330 to 163+400) along the existing road in the State of Meghalaya for the FY 2022-23 (Item Rate Basis). Dated : 27-07-2022.
Technical Evaluation Result for Restoration & Rehabilitation of Road from Km 21.00 to Km 28.00 on NH-4 (old NH-233) in the Union Territory of Andaman & Nicobar Islands in the FY 2022-23 on EPC Basis. Dated : 25-07-2022.
Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of “Widening to 2 (Two) Lane with Hard shoulder of Jessami to Akhegwo (Package-1 & 2) from (Design Chainage 283+000 Km to 325+440 Km to 340+160 Km) in the State of Nagaland and Manipur on EPC mode under NH(O)-NE.” Dated : 25-07-2022.
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Construction of Two lanning with Hard Shoulder Road of Ukhrul – Toloi – Tadbui section of NH-102A from Design Chainage 50.850 km to 81.870 km (Package-3) in the State of Manipur on EPC Mode; (ii) Construction of Two lanning with Hard Shoulder Road of Ukhrul – Toloi – Tadbui section of NH-102A from Design Chainage 81.870 km to 105.825 km (Package-4) in the State of Manipur on EPC Mode. Dated : 21-07-2022.
Technical Evaluation Result for award of contract for disposal of old/obsolete furniture and other items of National Highways & Infrastructure Development Corporation Ltd (NHIDCL) Corporate Office, 3rd Floor of PTI Building, New Delhi. Dated : 19-07-2022.
Technical Evaluation Result for CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF i) Up-gradation to two lane with Paved shoulder from Km. 12+850 to Km.20+300 of 7.450 Km. length on Goha-Khellani section and a link road to Goha Village of 2.016 Km on NH-244 in Union Territory of Jammu & Kashmir on EPC mode. (ii) Up-gradation to two lane with paved shoulder from Km 20+300 to Km29+030 of 8.730 Km length on Goha-Khellani section on NH-244 in Union Territory of Jammu & Kashmir on EPC mode. (iii) Construction of Bi-directional Tunnel at “Km 83” of Length 495 m along with approach road of 664 m and a Major Bridge of 110 m between Km 82+675 to Km 82+925 on NH-244 in Union Territory Jammu & Kashmir on EPC mode. Dated : 19-07-2022.
Revised Technical Evaluation Result for Four Laning of Jhanji to Demow from Km. 491.050 to Km. 535.250 of NH-37 in the state of Assam under SARDP on Engineering Procurement and Construction (EPC) Mode. Dated : 13-07-2022.
Technical Evaluation Result for Widening / Improvement to 4 (Four) Lane with Paved Shoulder configuration of existing single lane road from Kachukhana Harichara Paglagaunj to Dhubri – Phulbari Bridge approach (Package-II) of Srirampur – Dhubri Section of NH-127B from existing Km 28.050 to Km 55.060 (Design Km 27.650 to Km 54.154), (Design Length=26.504 Km) on EPC Mode in the State of Assam under JICA – ODA loan assistance . Dated : 08-07-2022.
Technical Evaluation Result for Four Laning of Jhanji to Demow from Km. 491.050 to Km. 535.250 of NH-37 in the state of Assam under SARDP on Engineering Procurement and Construction (EPC) Mode. Dated : 27-06-2022.
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: Improvement of existing road to 2 laning with Hard Shoulders of Maram-Peren section (Package-III, length 34.494 km) from Design Chainage km 75+000 to km 109+494 on NH-129A in the State of Manipur on EPC Mode. Dated : 27-06-2022.
Technical Evaluation Result Consultancy Services as Authority’s Engineer for Supervision of :(i)“Rehabilitation and Augmentation of 4 laning of Numaligarh to Jorhat section from Km 402.500 to Km 453.00 of NH-37 except construction of Dergaon Bypass from Km 426.80 to Km 437.42 in the state of Assam under SARDP-NE Phase ‘A’ (ii) “Rehabilitation and Up-gradation of Dergaon Town to 4 laning from km. 426.800 to km 437.420 on NH-37 in the state of Assam on Engineering, Procurement & Construction (EPC) Mode” (iii) Four laning of Jorhat to Jhanji Section of NH-37 from Km 453.000 to Km 491.050 (Design Km 453.000 to 490.800) in the state of Assam under SARDP-NE on Engineering, Procurement and Construction Mode. Dated : 27-06-2022.
Pre-Qualification Result for appointment of a Creative Agency for providing a Creative/communication strategy and creative designs etc to Ministry of Road Transport & Highways and its allied agencies. Dated : 24-06-2022.
Technical Evaluation Result for Special Repairs by Installation of “W” – Metal Beam Crash Barrier(type-A), between km 0+000 to km 107+000 on NH-4 in the Union Territory of Andaman & Nicobar Islands on Item Rate Basis in the FY 2022-23. Dated : 28-05-2022.
Revised Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of “Four laning of Vairengte – N. Kawnpui section (Package-3, 4, 5 & 6) of NH306 & NH-6 from Existing Chainage Km 43.000 to Km 126.315 (Design Chainage Km 46.000 to Km 111.850) in the State of Mizoram under Bharatmala Pariyojna on EPC mode”. Dated : 27-05-2022.
Technical Evaluation Result for Widening to 2 (Two) Lane with Hard shoulder of Akash Bridge – Jessami section of NH-202 for Package-II (Design Chainage 325+440 Km to 340+160 Km) in the State of Manipur on EPC mode under NH(O)-NE. Dated : 25-05-2022.
Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for Tunnel Car Parking at Kampty fall (Mussoorie) in the State of Uttarakhand. Dated : 23-05-2022.
Technical Evaluation Result for Engagement of Consultant For “Collection of Road Inventory & Pavement Condition Data of National Highways in the State of Arunachal Pradesh for uploading on Road Asset Management System (RAMS)”. Dated : 01-05-2022.
Technical Evaluation Result for Repair & Maintenance of the stretch from Jhanji (Km 491.050) to Demow (Km 535.250) of NH-37 in the State of Assam under M&R FY22-23. Dated : 29-04-2022.
Technical Evaluation Result for Restoration & Rehabilitation of Lainey Bridge to Jessami Road from Km 120.367 to Km 132.00 on NH-29 in the state of Manipur in the year 2021-2022 on Item Rate Basis (8th Call). Dated : 28-04-2022.
Revised Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from. km 581+700 of NH 37 to km 606+300 of NH-37 on existing Dibrugarh- Lahoal – Chabua Bypass i.e. from Lepetketa to Kandulibari Grant Gaon section in the State of Assam on EPC mode. AND (ii) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from. Km 606+300 of NH 37 to km 626+030 of NH-37 on existing Lahoal – Chabua Bypass i.e.– Kandulibari Grant Gaon to Nalanihulla section in the State of Assam on EPC mode. Dated : 26-04-2022.
Technical Evaluation Result for Renovation of Central Civil Services Cultural & Sports Board (CCSCSB) Sports Complex at Vinay Marg, New Delhi. Dated : 12-04-2022.
Technical Evaluation Result for Supply of Pantry Items at National Highways & Infrastructure Development Corporation Ltd (NHIDCL) HQ at its office at PTI Building, Jeevan Tara Building, New Delhi and any other office space in Delhi/New Delhi. Dated : 11-04-2022.
Technical Evaluation Result for Construction of Equal Value Assets in Army Area due to upgradation to 4-lane of Jammu Akhnoor (Pkg III) in Jammu-Akhnoor Road section of NH-144A in the UT of Jammu & Kashmir in the FY 2022-23. Dated : 05-04-2022
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Km 606+300 of NH 37 to km 626+030 of NH37 on existing Lahoal – Chabua Bypass i.e.–Kandulibari Grant Gaon to Nalani hulla section (Package 2) in the State of Assam on EPC mode. Dated : 31-03-2022
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from. km 583+350 of NH 37 to km 606+300 of NH-37 on existing Lahoal – Chabua Bypass i.e. Borborua Junction – Kandulibari Grant Gaon section in the State of Assam on EPC mode. Dated : 31-03-2022
Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Ch. from Km 131.280 to Km 169.570 (PKG-6) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode. Dated : 30-03-2022
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from. km 581+700 of NH 37 to km 606+300 of NH-37 on existing Dibrugarh- Lahoal – Chabua Bypass i.e. from Lepetketa to Kandulibari Grant Gaon section in the State of Assam on EPC mode. AND (ii) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from. Km 606+300 of NH 37 to km 626+030 of NH-37 on existing Lahoal – Chabua Bypass i.e.– Kandulibari Grant Gaon to Nalanihulla section in the State of Assam on EPC mode. Dated : 29-03-2022
Technical Evaluation Result for Empanelment of Travel Agency for Booking of Air Tickets and Rail Tickets for journeys of NHIDCL’s officers and staff. Dated : 28-03-2022
Technical Evaluation Result for Ordinary Repairs of NH-4 from Ch 59+400 km to Ch 107+000 km (Jarawa-I) in the Union Territory of Andaman and Nicobar Islands in the year 2022-23. Dated : 26-03-2022
Technical Evaluation Result for Construction of 2 lane with Hard shoulder from Design Chainage Km 283.000 (5- legged junction at Old Akhegwo) to Design Chainage Km 325.440 (Akash Bridge) of Akegwo- Jessami section of NH-202 in the State of Nagaland on EPC Mode (Package-I). Dated : 25-03-2022
Technical Evaluation Result for Supply, Installation, Testing and Commissioning of 01No. Diesel Generator Set (50kVA, Three Phase) for NHIDCL, Regional Office at Imphal, Manipur in FY-2021-2022. Dated : 25-03-2022
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Improvement/widening to Two laning with earthen shoulder of Nongjri (Design Ch. 30.00km) to Maheshkola (Design Ch. 55.525km) [R-M-B Package- II] on SH-4 section of Ranikor- Maheshkhola-Baghmara Project in the state of Meghalaya on EPC basis. (ii) Improvement/widening to two-lanning of stretch from km 55.525 to km 79.680 of Ranikhor- Baghmara Project in the state of Meghalaya under “SARDP-NE” Phase-A on EPC mode (Package-III). (iii) Improvement/widening to Two-laning with earthen shoulder of Panda (Design Ch. 112.300 km) to Baghmara (Design Ch. 129.385 km) [R-M-B Package-VI] on SH-4 section of Ranikor- Maheshkhola-Baghmara Project in the state of Meghalaya on EPC basis. Dated : 24-03-2022
Technical Evaluation Result for Restoration and Repairs of NH-244 by laying Bituminous Concrete in selected stretches from Batote (Km 0.000) to Khellani (Km 45.000) and (Km 0.000) to (Km 8.000) of Paryote-Puldoda stetch (re-alignment portion) [Total length= 29.343 Km] in the UT of Jammu & Kashmir in the FY 2022-23. Dated : 23-03-2022
Technical Evaluation Result for Rehabilitation and up-gradation of road from km 16+077 to km 43+935 of Lalchara- Kanchanpur via Shivbari section of Manu-Simlung road on NH-44A to two lane with paved shoulder in the state of Tripura on EPC basis- (package- II). Dated : 11-03-2022
Technical Evaluation Result for Construction of 08 nos of toilets with kiosks under Swachhata Action plan in the state of Nagaland-2 nd Call. Dated : 08-03-2022
Technical Evaluation Result for onsultancy services for Authority’s Engineer for Supervision of: (i) Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 66.610 km to 101.280 km (Existing Chainage from km 67.496 to km 103.557) (PKG-IV) in the State of Manipur on EPC mode. (ii) Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 101.280 km to 131.280 km (Existing Chainage from km 103.557 to km 134.821) (PKG-V) in the State of Manipur on EPC mode. (iii) Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 131.280 km to 169.570 km (Existing Chainage from km 134.821 to km 175.105) (PKG-VI) in the State of Manipur on EPC mode. (iv) Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 169.570 km to 205.974 km (Existing Chainage from km 175.105 to km 214.289) (PKG-VII) in the State of Manipur on EPC mode. – 2nd Call. Dated : 03-03-2022
Technical Evaluation Result for award of contract for disposal of old/obsolete computer hardware and peripherals of National Highways & Infrastructure Development Corporation Ltd (NHIDCL) Corporate Office, 3rd Floor of PTI Building, New Delhi. Dated : 16-02-2022
Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF “Construction of New Two-Lane Bridge with its approaches from Km 0+000 to Km 4+385 across River Brahmaputra on NH-17 at Jogighopa in the State of Assam on EPC mode. (2nd Call)”. Dated: 14-02-2022.
Technical Evaluation Result for Selection of Placement Agency for providing services of Office Staff (such as Stenographers, Office Assistants, Data Entry Operators, Multi-tasking Staff, etc.) at NHIDCL Headquarters, New Delhi. Dated: 10-02-2022.
Technical Evaluation Result for Restoration & Rehabilitation of NH-02of Imphal-Kohima Road (Daili to Kuraopokpi) from Km 274.610 to Km 297.700 in the state of Manipur on Item Rate Basis. Dated: 09-02-2022.
Technical Evaluation Result for Improvement/widening to Two-laning with earthen shoulder of Nongjri (Design Ch. 30.00km) to Maheshkola (Design Ch. 55.525km )[R-M-B Package-II] on SH-4 section of Ranikor- Maheshkhola-Baghmara Project in the state of Meghalaya on EPC basis. Dated: 07-02-2022.
Technical Evaluation Result for Four laning of Kolasib – Sethawn section (Package-5) of NH-6 from Existing Chainage km 86+000 to km 107+850 (Design Chainage km 77+500 to km 95+500) on Silchar – Vairengte – Sairang road in the State of Mizoram under Bharatmala Pariyojna on EPC mode. Dated: 21-01-2022.
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) “ Rehabilitation and up-gradation of road from km 16+077 to km 43+935 of Lalchara- Kanchanpur via Shivbari section of Manu-Simlung road on NH-44A to two lane with paved shoulder in the state of Tripura on EPC basis- (package-II). (ii) Rehabilitation and up-gradation of road from km 110.119 to km 131.480 (Total length: 19.015 km) of Vaghmun- Simlung section of Manu-Simlung road on NH-44A to two lane with paved shoulder in the state of Tripura on EPC basis- (package-IV). Dated: 20-01-2022.
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Rehabilitation and Upgradation of Nongstoin-Rambrai-Kyrshai road up to Meghalaya-Assam Border from km 0.335 to km 34.039 to 2-Lane under SARDP-NE “Phase-A” in the state of Meghalaya on EPC mode (Package-I) (ii) Rehabilitation and Upgradation of Nongstoin-Rambrai-Kyrshai road up to Meghalaya-Assam Border from km 35+155 to km 72+863 to 2-Lane under NH (O)- NE in the state of Meghalaya on EPC mode (Package-II). Dated: 20-01-2022.
Technical Evaluation Result for Construction of Balance Work of 2 Lane with Paved Shoulders of Joram- Koloriang road (NH 713) on EPC basis from existing Km 138.00 to Km 158.000 (Design Km 122.353 to Km 138.389)[Design length-16.036 Km] in the State of Arunachal Pradesh under SARDP-NE. Dated: 12-01-2022.
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 146+246 to Km 157+460 (Design Chainage145+712 to 156+634) of Dillai- Lahorijan (Package-7) of NH 29 in the state of Assam on EPC mode. Dated: 10-01-2022.