GST No. 07AAECN7759E1Z7
NATIONAL HIGHWAYS & INFRASTRUCTURE DEVELOPMENT CORPORATION LTD.
Ministry of Road Transport & Highways, Government of India
 

Tender Evaluation Result 2021

Tender Evaluation Result 2021


  1. Technical Evaluation Result for Construction of Kishtwar bypass with 2 lane with paved shoulder from Design Km. 80.675 (Dulhasti) to Km 95.550 (bandarkoot ) of 14.88 Km length on Khellani –  Kishtwar –Chattroo section and a link road to Kishtwar town of 1.871 km on NH- 244 in the Union Territory of Jammu & Kashmir on EPC mode (Pkg –IV).-2nd call. Dated: 30-06-2021.
  2. Technical Evaluation Result for CONSTRUCTION OF BALANCE WORK OF 2 LANING OF AKAJAN-LIKABALI-BAME ROAD ON EPC BASIS FROM DESIGN KM 33.00 TO KM 65.810 (EXISTING KM 36.00 TO KM 71.00) IN THE STATE OF ARUNACHAL PRADESH UNDER SARDP-NE). Dated: 28-06-2021.
  3. Technical Evaluation Result for Construction of Two Major bridges at Existing Ch. 23+650 (designed Ch. 23+550) and Ch. 28+200 (designed Ch. 28+200) of bridge span 160 m along the Existing Hunli-Anini Road from Km 21.500 to Km 37.500 in the State of Arunachal Pradesh on EPC Mode under SARDP-2 nd call. Dated: 22-06-2021.
  4. Technical Evaluation Result for Special Repair of NH-329A from Sangtamtilla to Pimla Junction  Section (Km 38.000 to Km 70.270) [Total Length: 32.270] in the State of  Nagaland in the FY 2021-22. Dated: 18-06-2021.
  5. Technical Evaluation Result for Construction of North East Regional Office of National Highways & Infrastructure Development Corporation Ltd. at Guwahati, Assam on EPC mode. Dated: 16-06-2021.
  6. Technical Evaluation Result for CONSTRUCTION OF FOOT TRACK FROM MIPI TO ANDRA LA  OMKAR FROM KM 0.000 TO KM 35.100 IN ANINI DISTRICT OF  THE STATE OF ARUNACHAL PRADESH ON EPC MODE. Dated: 11-06-2021.
  7. Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Construction of two lane with paved shoulders road of Tamenglong to Muhur in the state of Manipur from km 0.000 at Tamenglong to km 10.000 near Dialong (Length-10.00km) (PKG-1) on EPC mode. (ii) Construction of two lane with paved shoulders road of Tamenglong Mahur section in the state of Manipur from km 10.000 at Dialong to km 20.500 near Old Tamenglong (Length10.5km) (PKG-2) on EPC mode. (iii) Construction of two lane with paved shoulders road of Tamenglong Mahur section in the state of Manipur from km 20.500 at Old Tamenglong to km 30.800 ending near Phelong (Length-10.3km) (PKG-3) on EPC mode. (iv) Construction of two lane with paved shoulders road of Tamenglong Mahur section in the state of Manipur from km 30.800 at Phelong to km 41.450 ending near Azuram (Length10. 65km) (PKG-4) on EPC mode. Dated: 10-06-2021.
  8. Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of  i) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 146.208 to Km 163.592 (Length – 17.384 Km) in the state of Nagaland on EPC mode (Pkg – III) under NH(O) – TSP (ii) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 163.592 to Km 173.850 (Length – 10.258 Km) in the state of Nagaland on EPC mode (Pkg – IV) under NH (O) – TSP (iii) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 173.850 to Km 190.850 (Length – 17.00 Km) in the state of Nagaland on EPC mode (Pkg – V) under NH(O) – TSP. Dated: 01-06-2021.
  9. Technical Evaluation Result for Special Repair of NH-702, from Mon to Tizit Stretch (from Km 133.00  to Km 177.00) [Total Length = 44.00 Km] in the State of Nagaland for  the FY 2021-22. Dated: 01-06-2021.
  10. Technical Evaluation Result for Selection of agency/ agencies for entering into Annual Rate Contract for providing services of Designing, Printing of document(s) etc., for NHIDCL, New Delhi. Dated: 31-05-2021.
  11. Technical Evaluation Result for Restoration of existing road from km 76.350 to km 79.700 of NH-717A(i.e. start of Pedong Bypass to Reshi Border) in the State of West Bengal on EPC Mode. Dated: 31-05-2021.
  12. Technical Evaluation Result for REPAIR AND MAINTAINANCE OF ROAD FROM ARROWA TRI- JUNCTION (RAMMANDIR) TO TIDDING OF NH-113 IN THE STATE  OF ARUNACHAL PRADESH. Dated: 27-05-2021.
  13. Technical Evaluation Result for Procurement of 200Nos. D-Type (46.7L) Medical Oxygen Cylinders with valve and cap for NHIDCL RO-Itanagar. Dated: 24-05-2021.
  14. Technical Evaluation Result for Maintenance & Repair work of Ranipool to Pakyong stretch from km 2.000 to  km 6.000 at NH-717A on Percentage Rate Contract in the state of Sikkim for FY 2021-22. Dated: 19-05-2021.
  15. Technical Evaluation Result for strengthening works on NH-10 from km. 52.000 to Km 80.000 on Item  Rate Contract Basis in the state of Sikkim for FY 2021-22. Dated: 17-05-2021.
  16. Technical Evaluation Result for Restoration and Repairs of NH-39 (new NH-29) from existing Dimapur-Kohima  road (Km 156.000 to Km 172.900) [Length=16.90 Km] in the State of Nagaland in  the FY 2021-22 – 2nd Call. Dated: 19-05-2021.
  17. Technical Evaluation Result for Strengthening from: Km 912.348 to Km 912.780, Km 916.000 to Km 928.000, Km 938.000 to Km 945.400, Km 946.500 to Km 947.300 & Km 947.700 to Km 948.000 of Bilasipara-Tulungia of NH-31 (New NH-17) in the State of Assam in FY 21-22. Dated: 14-05-2021.
  18. Technical Evaluation Result for Strengthening from: Km 6.180 to Km 7.380 & Km 18.835 to Km 30.675 (Length=13.130 Km) and Km 30.765 to Km 42.000 (Length=11.235) of Bilasipara to Guwahati Section of NH-17 (Old NH-37) in the State of Assam in FY 21-22. Dated: 14-05-2021.
  19. Technical Evaluation Result for Strengthening of the Section from Km 40.300 to Km 42.000 of SilcharVaringte, NH-306 in FY 21-22: Second Call. Dated: 13-05-2021.
  20. Technical Evaluation Result for Construction of Two Major bridges at Existing Ch. 23+650 (designed Ch. 23+550) and Ch. 28+200 (designed Ch. 28+200) of bridge span 160 m along  the Existing Hunli-Anini Road from Km 21.500 to Km 37.500 in the State  of Arunachal Pradesh on EPC Mode under SARDP. Dated: 13-05-2021.
  21. Technical Evaluation Result for Detailed survey of NH-4 from Km 0.00 to Km 330.7 using Network Survey Vehicle (NSV) in the Union Territory of Andaman & Nicobar Islands; 4th Call. Dated: 05-05-2021.
  22. Technical Evaluation Result for Vegetation Clearance, Drain Clearance with Pot Patch Repair Work including Protection works in Financial Year 2021 on NH10 (From KM 52 to KM 80) in the state of Sikkim on  Percentage Contract Basis. Dated: 04-05-2021.
  23. Technical Evaluation Result for Notice Inviting Bid for Lease of Office Premises of NHIDCL, Project Monitoring Unit – Silchar (Assam). Dated: 17-04-2021.
  24. Technical Evaluation Result for Maintenance & Repair work of Ranipool to Pakyong stretch from km 2.000 to km 6.000 at NH-717A in the state of Sikkim for FY 2021-22. Dated: 27-04-2021.
  25. Technical Evaluation Result for Re-construction of Structures viz. compound wall, Guard Posts  and Transformer Platform in Doordarshan Campus, Paloura, in  Jammu-Akhnoor road section of NH-144A, in the UT of Jammu &  Kashmir. Dated: 27-04-2021.
  26. Technical Evaluation Result for Selection of Manpower Placement Agency for providing services of Outsourced manpower on monthly basis for NHIDCL at Regional Office- Port Blair, its PMUs and site offices in the Union Territory of Andaman & Nicobar Islands-4th Call. Dated: 26-04-2021.
  27. Technical Evaluation Result for Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 126.775 to Km 146.208 (Length – 19.433 Km) in the state of Nagaland on EPC mode (Pkg – II) under NH(O) – TSP. Dated: 16-04-2021.
  28. Technical Evaluation Result for Notice Inviting Bid for Lease of Office Premises of NHIDCL, Project Monitoring Unit – Bongaigaon (Assam) – 3rd Call. Dated: 16-04-2021.
  29. Technical Evaluation Result for Notice Inviting Bid for Lease of Office Premises of NHIDCL, Project Monitoring Unit – Silchar (Assam). Dated: 15-04-2021.
  30. Technical Evaluation Result for Balance work for Four-laning of NH-39 Dimapur — Kohima Road from Design Km 152.490 to Km 166.700 (Existing Km 156.000 to Km 172.900), in the state of Nagaland under SARDP-NE through an Engineering, Procurement and Construction(EPC) Contract (Package-III). Dated: 13-04-2021.
  31. Technical Evaluation Result for Restoration and Repairs from km 184.000 to km 203.000 in Kishtwar-Sinthanpass of NH-244 [Total length = 19.00 km] in the UT of Jammu & Kashmir in the FY 2021-22. Dated: 12-04-2021.
  32. Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF: (i) Construction of High Altitude Hill road from Dembuen TO Bruni from KM 0.000 to KM 36.300 in Anini District of the state of Arunachal Pradesh on EPC Mode. (ii) Construction of High Altitude Hill road from Mipi TO Mathun (Basam) from KM 0.000 to KM 16.730 in Anini District of the state of Arunachal Pradesh on EPC Mode. Dated: 08-04-2021.
  33. Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF “Construction of High Altitude Hill road from Ladda (Graziang) TO Basai from KM 0.000 to KM 35.260 in East Kameng District of the state of Arunachal Pradesh on EPC Mode”. Dated: 08-04-2021.
  34. Technical Evaluation Result for Rehabilitation of section from Km 298.00 to Km 330.662 (Karala to Kalipur) of NH-04 to Intermediate lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands (Total Length 32.662 km) on EPC Mode (Package- VIII) (Re-tender). Dated: 07-04-2021.
  35. Technical Evaluation Result for Hiring of Machine/Labour etc for clearance of landslides in Rainy  Season 2020 on NH-10 from Km 52 to Km 66, Km 66 to Km 80,  Indira Bypass 0.00 to Km 10.117, Sirwani Km 0.00 to Dalep Km  2.30 for Project Monitoring Unit(PMU) at Ranipool in the state of  Sikkim for Year 2021-20 nd call. Dated: 05-04-2021.
  36. Technical Evaluation Result for Construction & Upgradation to 2 lane with paved shoulder from Design Km. 51.700 (Prem Nagar) to Km 66.535 (New Thathri) of 14.84 Km length on Khellani – Kishtwar –Chattroo section of NH-244 in the Union Territory of Jammu & Kashmir on EPC mode (Pkg –II). Dated: 30-03-2021.
  37. Technical Evaluation Result for Notice Inviting Bid for Lease of Office Premises of NHIDCL, Project Monitoring Unit – Bongaigaon (Assam)- 2nd Call. Dated: 30-03-2021.
  38. Technical Evaluation Result for Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Design Chainage 69+875 km to 88+980 Km (PKG-3A) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode. Dated: 28-03-2021.
  39. Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 88.000km to Ch.99.930 km (Design Ch.84.100km to Ch.96.000km) of the Sagunbashi forest (near Nichinta) Bypass to the starting of Krishnai Bypass Section (Package-7) of Bilasipura- Guwahati road (NH 17) in the state of Assam on EPC mode. Dated: 28-03-2021.
  40. Technical Evaluation Result for Construction of Kishtwar bypass with 2 lane with paved shoulder from Design Km. 80.675 (Dulhasti) to Km 95.550 (bandarkoot ) of 14.88 Km length on Khellani – Kishtwar –Chattroo section and a link road to Kishtwar town of 1.871 km on NH244 in the Union Territory of Jammu & Kashmir on EPC mode (Pkg –IV). Dated: 28-03-2021.
  41. Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder of Daboka – Khatkhati stretch of NH-29 of Package 5 starting from Near Ganpath Gaur Gaon at Km 95+400 to Kwaram Taro village at Km 113+330 (Design KM 96+400 to Km 113+830) in the state of Assam on EPC mode. Dated: 28-03-2021.
  42. Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 131+500 to Km 146+250 (Design Chainage 131+152 to 145+712) of Manja – Dillai Section (Package-7) of NH 29 in the state of Assam on EPC mode. Dated: 28-03-2021.
  43. Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 3.275 km to 15.940 Km (Total length=12.665 Km) (PKG-1) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode. Dated: 28-03-2021.
  44. Technical Evaluation Result for Construction of two lane with paved shoulders road from  Tamenglong to Mahur in the state of Manipur from km 10.000 near  Dialong Village to km 21.900 near Old Tamenglong Village (Length- 11.90 km) (Package-2A) on EPC mode. Dated: 28-03-2021.
  45. Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to  Jiribam section of NH-37 from Design Chainage 66.110 km to  83.800 Km (Total length= 17.69 Km) (PKG-5) in the State of  Manipur on Engineering, Procurement & Construction (EPC)  mode. Dated: 28-03-2021.
  46. Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 33.120 km to 49.140 Km (Total length=16.02 Km) (PKG-3) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode. Dated: 28-03-2021.
  47. Technical Evaluation Result for CONSTRUCTION OF BALANCE WORK OF TWO – LANE WITH HARD SHOULDERS OF EXISTING HAYULIANG – HAWAI ROAD (NH-113) FROM DESIGN KM 51.825 TO KM 63.131 (EXISTING KM 45.050 OF HAYULIANG – HAWAI ROAD TO HAWAI TOWN)(11.306 KM) ON EPC BASIS IN THE STATE OF ARUNACHAL PRADESH PACKAGE OF SARDP – NE(GREEN FIELD ALIGNMENT). Dated: 28-03-2021.
  48. Revised Technical Evaluation Result-II for Up-gradation to 2 lane with paved shoulders of Dulte – Champhai road  (International Corridor) of NH-6 from Design Chainage Km 84.800 to km  111.580 (Package-III) in the State of Mizoram under Bharatmala  Pariyojna on EPC mode. Dated: 27-03-2021.
  49. Revised Technical Evaluation Result-II for Rehabilitation and Up-gradation to 2 lane with paved shoulders of Dulte  – Champhai road (International Corridor) of NH-6 from Design Chainage  Km 72.350 to Km 84.800 (Package-II) in the State of Mizoram under  Bharatmala Pariyojna on EPC mode. Dated: 27-03-2021.
  50. Revised Technical Evaluation Result-II for Up-gradation to 2 lane with paved shoulders of Dulte – Champhai road  (International Corridor) of NH-6 from Design Chainage Km 54.400 to km  72.350 (Package-I) in the State of Mizoram under Bharatmala Pariyojna  on EPC mode. Dated: 27-03-2021.
  51. Revised Technical Evaluation Result-II for Widening/Up-Gradation to 2 lane with Paved shoulder of NH-301 KargilZanskar Road from Design km 196.250 (Existing km 194.790) to Design km 230.020 (Existing km 231.692) in the UT of Ladakh on EPC mode (Package-VIII). Dated: 27-03-2021.
  52. Revised Technical Evaluation Result for Widening/Up-Gradation to 2 lane with Paved shoulder of NH-301 KargilZanskar Road from Design km 196.250 (Existing km 194.790) to Design km 230.020 (Existing km 231.692) in the UT of Ladakh on EPC mode (Package-VIII). Dated: 26-03-2021.
  53. Revised Technical Evaluation Result for Widening/Up-Gradation to 2 lane with Paved shoulder of NH301 Kargil-Zanskar Road from Design km 57.000 (Existing km 57.905) to Design km 87.000 (Existing km 88.249) in the UT of Ladakh on EPC mode (Package-III). Dated: 26-03-2021.
  54. Revised Technical Evaluation Result for Widening/Up-Gradation to 2 lane with Paved shoulder of NH301 Kargil-Zanskar Road from Design km 30.040 (Existing km 30.000) to Design km 57.000 (Existing km 57.905) in the UT of Ladakh on EPC mode (Package-II). Dated: 26-03-2021.
  55. Revised Technical Evaluation Result for Widening/Up-Gradation to 2 lane with Paved shoulder of NH301 Kargil-Zanskar Road from Design km 0.000 (Existing km 0.000) to Design km 30.040 (Existing km 30.000) in the UT of Ladakh on EPC mode (Package-I). Dated: 26-03-2021.
  56. Revised Technical Evaluation Result for Construction of 2-laning with hard shoulder configuration of Chhumkhum to Tlabung from Design Chainage Km 37.420 to Km 74.950 [Pkg-B] for Lunglei-Tlabung section of NH-302 in the State of Mizoram under ‘Bharatmala Pariyojana’ on EPC Mode. Dated: 26-03-2021.
  57. Revised Technical Evaluation Result for Construction of 2-laning with hard shoulder configuration of Lunglei to Chhumkhum from Design Chainage Km 0.000 (Hrangchalkawn) to Km 37.420 [Pkg-A] for Lunglei-Tlabung section of NH-302 in the State of Mizoram under ‘Bharatmala Pariyojana’ on EPC Mode. Dated: 26-03-2021.
  58. Revised Technical Evaluation Result for Up-gradation to 2 lane with paved shoulders of Dulte – Champhai road  (International Corridor) of NH-6 from Design Chainage Km 84.800 to km  111.580 (Package-III) in the State of Mizoram under Bharatmala  Pariyojna on EPC mode. Dated: 26-03-2021.
  59. Revised Technical Evaluation Result for Rehabilitation and Up-gradation to 2 lane with paved shoulders of Dulte  – Champhai road (International Corridor) of NH-6 from Design Chainage  Km 72.350 to Km 84.800 (Package-II) in the State of Mizoram under  Bharatmala Pariyojna on EPC mode. Dated: 26-03-2021.
  60. Revised Technical Evaluation Result for Up-gradation to 2 lane with paved shoulders of Dulte – Champhai road  (International Corridor) of NH-6 from Design Chainage Km 54.400 to km  72.350 (Package-I) in the State of Mizoram under Bharatmala Pariyojna  on EPC mode. Dated: 26-03-2021.
  61. Technical Evaluation Result for Construction & Upgradation to 2 lane with paved shoulder from Design Km. 67.805 (at the end of Km 83rd tunnel near Dhrabshala) to Km 80.675 (Dulhasti) of 12.87 Km length on Khellani – Kishtwar –Chattroo section of NH-244 in the Union Territory of Jammu & Kashmir on EPC mode (Pkg –III). Dated: 26-03-2021.
  62. Technical Evaluation Result for Improvement/ Up-gradation of existing 2-Lane road to 4-Lane Divided Highway from Sekmai to Nilkhuthi section (Pkg-5B) of Imphal Kohima Road (Design Chainage from Km 297+700 to Km 308+460) of NH-39 in the state of Manipur on EPC Mode. Dated: 26-03-2021.
  63. Technical Evaluation Result for Construction /Up gradation 2 lane with paved shoulder from Design Km 95.55 (Bandarkoot ) to Km. 111.08 (Chattroo) of 15.54 Km length on Khellani – Kishtwar – Chattroo section on NH-244 in the Union Territory of Jammu & Kashmir on EPC mode (Pkg –V). Dated: 25-03-2021.
  64. Technical Evaluation Result for Construction of 2-laning with hard shoulder configuration of Chhumkhum to Tlabung from Design Chainage Km 37.420 to Km 74.950 [Pkg-B] for Lunglei-Tlabung section of NH-302 in the State of Mizoram under ‘Bharatmala Pariyojana’ on EPC Mode. Dated: 25-03-2021.
  65. Technical Evaluation Result for construction of 2-laning with hard shoulder configuration of Lunglei to Chhumkhum from Design Chainage Km 0.000 (Hrangchalkawn) to Km 37.420 [Pkg-A] for Lunglei-Tlabung section of NH-302 in the State of Mizoram under ‘Bharatmala Pariyojana’ on EPC Mode. Dated: 25-03-2021.
  66. Technical Evaluation Result for Construction of two lane with paved shoulders road of Tamenglong Mahur section in the state of Manipur from km 20.500 at Old Tamenglong to km 30.800 ending near Phelong (Length-10.3km) (PKG-3) on EPC mode. Dated: 25-03-2021.
  67. Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 113+300 to km 131+500 (Design Chainage 113+830 to 131+152) of Kwaram Taro Village – Manja Section – (Package- 6) of NH-29 in the state of Assam under Bharatmala Pariyojana on EPC mode. Dated: 25-03-2021.
  68. Technical Evaluation Result for Up-gradation to 2 lane with paved shoulders of Dulte – Champhai road (International Corridor) of NH-6 from Design Chainage Km 84.800 to km 111.580 (Package-III) in the State of Mizoram under Bharatmala Pariyojna on EPC mode. Dated: 25-03-2021.
  69. Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 15.940 km to 33.120 Km (Total length=17.180 Km) (PKG-2) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode. Dated: 24-03-2021.
  70. Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 51+246to Km 66+000 (Design Chainage 50+710 to 65+923) of Parokhuwa – Dokmoka Section (Package 2) of NH 29 in the state of Assam on EPC mode. Dated: 24-03-2021.
  71. Technical Evaluation Result for Widening/Up-Gradation to 2 lane with Paved shoulder of NH301 Kargil-Zanskar Road from Design km 0.000 (Existing km 0.000) to Design km 30.040 (Existing km 30.000) in the UT of Ladakh on EPC mode (Package-I). Dated: 24-03-2021.
  72. Technical Evaluation Result for Widening/Up-Gradation to 2 lane with Paved shoulder of NH-301 KargilZanskar Road from Design km 196.250 (Existing km 194.790) to Design km 230.020 (Existing km 231.692) in the UT of Ladakh on EPC mode (Package-VIII). Dated: 24-03-2021.
  73. Technical Evaluation Result for Widening/Up-Gradation to 2 lane with Paved shoulder of NH301 Kargil-Zanskar Road from Design km 57.000 (Existing km 57.905) to Design km 87.000 (Existing km 88.249) in the UT of Ladakh on EPC mode (Package-III). Dated: 24-03-2021.
  74. Technical Evaluation Result for Widening/Up-Gradation to 2 lane with Paved shoulder of NH301 Kargil-Zanskar Road from Design km 30.040 (Existing km 30.000) to Design km 57.000 (Existing km 57.905) in the UT of Ladakh on EPC mode (Package-II). Dated: 24-03-2021.
  75. Technical Evaluation Result for Construction of Two-Lane with hard shoulders of Merangkong Tamlu Mon road (Wakching Town portion) on EPC basis from existing Km 59+000 to Km 73+640 [Design Km. 59+000 to Km. 72+450] (Design Length – 13.450 Km)(Package V) in the state of Nagaland under SARDP-NE Phase A on EPC Mode. Dated: 24-03-2021.
  76. Technical Evaluation Result for Up-gradation to 2 lane with paved shoulders of Dulte – Champhai road (International Corridor) of NH-6 from Design Chainage Km 54.400 to km 72.350 (Package-I) in the State of Mizoram under Bharatmala Pariyojna on EPC mode. Dated: 24-03-2021.
  77. Technical Evaluation Result for Rehabilitation and Up-gradation to 2 lane with paved shoulders of Dulte – Champhai road (International Corridor) of NH-6 from Design Chainage Km 72.350 to Km 84.800 (Package-II) in the State of Mizoram under Bharatmala Pariyojna on EPC mode. Dated: 24-03-2021.
  78. Technical Evaluation Result for Construction of New 2-Lane bypass from Design km 176+532(Existing km 263+070) (Donipawa) on NH-244 to Design Km 185+002 (Near Khudwani on NH-44 at existing km 238+500)(Alstop) Via Ashajipora of 8.470km length i.e. to connecting NH-244 & NH-44 in the Union Territory of Jammu & Kashmir on EPC mode. (Pkg–VII). Dated: 24-03-2021.
  79. Technical Evaluation Result for Strengthening of entrusted section of NH 208 from (Kalyanpur) to (Khowai Chowmuhuni, Teliamura) (Km. 124.000 to Km. 139.600) [Total Length 15.600 Km.] in the State of Tripura in the FY 2021-22. Dated: 24-03-2021.
  80. Technical Evaluation Result for Improvement and Widening to two lane with paved shoulder of Manu – Simlung section of NH-44A starting near Vaghmun at km 66.845 and ending near Simlung at km 85.125(Length-18.28km) in the state of Tripura on Engineering, Procurement & Construction (EPC) mode – Package-IV. Dated: 24-03-2021.
  81. Technical Evaluation Result for Improvement/widening to two-lanning of stretch from km 55.525 to km 79.680 of Ranikhor- Baghmara Project in the state of Meghalaya under “SARDP-NE” Phase-A on EPC mode (Package-III). Dated: 23-03-2021.
  82. Technical Evaluation Result for Strengthening of entrusted section of NH 208 from (Khowai) to (Kalyanpur) (Km. 108.600 to Km. 124.000) [Total Length 15.400 Km.] in the State of Tripura in the FY 2021-22. Dated: 22-03-2021.
  83. Technical Evaluation Result for Construction of High Altitude Hill road from Ladda (Graziang) TO Basai from KM 0.000 to KM 35.260 in East Kameng District of the state of Arunachal Pradesh on EPC Mode. Dated: 19-03-2021.
  84. Technical Evaluation Result for Construction of two lane with paved shoulders road of Tamenglong Mahur section in the state of Manipur from km 30.800 at Phelong to km 41.450 ending near Azuram (Length10. 65km) (PKG-4) on EPC mode. Dated: 19-03-2021.
  85. Technical Evaluation Result for Strengthening of entrusted section of NH 208 from (Amarpur TSR Camp) to (Jatanbari) (Km. 194.400 to Km. 208.800) [Total Length 14.400 Km.] in the State of Tripura in the FY 2021-22. Dated: 18-03-2021.
  86. Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 52.470 km to Ch.71.500 km (Design Ch.48.655 km to Ch.67.556 km) of Tulungia- Jogighopa Bridge Approach Section (Package-5) of Bilasipura- Guwahati road (NH-17) in the state of Assam under Bharatmala Pariyojana on EPC mode. Dated: 18-03-2021.
  87. Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF “Improvement of existing road to 2 laning with Hard Shoulders of Maram- Peren section on NH-129A in the State of Manipur on EPC Mode for following pkgs.: (i) (Package-IA, length- 22.340 Km) from Design Chainage 0.000 km to km 22.340 (ii) (Package-IB, length- 17.660 Km) from Design Chainage 22.340 Km to Km 40.000 (iii) (Package-IIA, length- 16.840 Km) from Design Chainage 40.000 km to 56.840 Km (iv) (Package-IIB, length- 18.160 Km) from Design Chainage 56.840 km to km 75.000 (v) (Package-3A, length- 12.35 Km) from Design Chainage 75.000 km to 87.350 Km (vi) (Package-3B, length- 22.144 Km) from Design Chainage 87.350 km to 109.494 Km. Dated: 18-03-2021.
  88. Technical Evaluation Result for Construction of two lane with paved shoulders road of Tamenglong to Muhur in the state of Manipur from km 0.000 at Tamenglong to km 10.000 near Dialong (Length-10.00km) (PKG-1) on EPC mode. Dated: 17-03-2021.
  89. Technical Evaluation Result for Widening and Improvement of Imphal-Moreh section of NH-39 from Km 406.000 to Km 425.411 to Two (2) lane with paved shoulders configuration in the State of Manipur (Package-IV) on Engineering, Procurement & Construction (EPC) mode. Dated: 17-03-2021.
  90. Technical Evaluation Result for Widening and Improvement of Imphal-Moreh section of NH- 39 from Km 395.680 to Km 406.000 to Two (2) lane with paved shoulders configuration in the State of Manipur (Package-III) on Engineering, Procurement & Construction (EPC) mode. Dated: 17-03-2021.
  91. Technical Evaluation Result for Appointment of Financial Consultancy Services for Agartala to Sabroom section of NH-08 from CH 6.8 Km to 128.712 Km including Feni Bridge at international border of India and Bangladesh in the state of Tripura undertaken by NHIDCL on OMT basis. Dated: 16-03-2021.
  92. Technical Evaluation Result for Shifting of 33KV, 11 KV and LT line on Jammu-Akhnoor section of NH-144 A in the UT of Jammu & Kashmir. Dated: 16-03-2021.
  93. Technical Evaluation Result for Construction & Upgradation to 2 lane with paved shoulder from Design Km. 51.700 (Prem Nagar) to Km 66.535 (New Thathri) of 14.84 Km length on Khellani – Kishtwar –Chattroo section of NH-244 in the Union Territory of Jammu & Kashmir on EPC mode (Pkg –II). Dated: 15-03-2021.
  94. Technical Evaluation Result for Selection of Manpower Placement Agency for providing services of Outsourced manpower on monthly basis for NHIDCL at Regional Office- Port Blair, its PMUs and site offices in the Union Territory of Andaman & Nicobar Islands-3rd Call. Dated: 12-03-2021.
  95. Technical Evaluation Result for Detailed survey of NH-4 from Km 0.00 to Km 330.7 using Network Survey Vehicle (NSV) in the Union Territory of Andaman & Nicobar Islands- 3rd Call. Dated: 12-03-2021.
  96. Technical Evaluation Result for Construction of various RCC infrastructure works for Ladakh Police in the Union Territory of Ladakh. Dated: 12-03-2021.
  97. Technical Evaluation Result for Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 163.592 to Km 173.850 (Length – 10.258 Km) in the state of Nagaland on EPC mode (Pkg – IV) under NH (O) – TSP. Dated: 11-03-2021.
  98. Technical Evaluation Result for CONSTRUCTION OF HIGH ALTITUDE HILL ROAD FROM TAKSING TO GHORA FROM KM 0.000 TO KM 7.090 IN UPPER SUBANSIRI DISTRICT OF THE STATE OF ARUNACHAL PRADESH ON EPC MODE. Dated: 09-03-2021.
  99. Technical Evaluation Result for Reconstruction of 94 Nos. of culverts in the stretch from Km 298.00 to km 330.662 (Karala to Kalipur) of NH-04 in the Union Territory of Andaman & Nicobar Islands on EPC Mode. Dated: 05-03-2021.
  100. Technical Evaluation Result for Consultancy Services for planning and design of various infrastructures work located at Leh and Kargil for Social Tribal Welfare Department in the Union territory of Ladakh. Dated: 05-03-2021.
  101. Technical Evaluation Result for Construction and upgradation of existing road to 2-lane with paved shoulder from Km 37+600 (New Rolep bridge) to Km 52+000 (Chochenpheri) of Rhenok-Menla spur (NH717B) Package-IIC on EPC basis under SARDP-NE Phase ‘A’ in the State of Sikkim.- (2nd Call). Dated: 03-03-2021.
  102. Technical Evaluation Result for Ordinary Repairs of NH-4 from Ch 21+000 km to Ch 28+000 km in the Union Territory of Andaman and Nicobar Islands in the year 2020-21-6th Call. Dated: 19-02-2021.
  103. Technical Evaluation Result for Purchase of 15 KVA DG set with installation for Project Monitoring Unit- Rhenock in State of Sikkim on e-tendering mode. Dated: 16-02-2021.
  104. Technical Evaluation Result for Detailed survey of various roads using Network Survey Vehicle (NSV) in the UT of Ladakh. Dated: 17-02-2021.
  105. Technical Evaluation Result for Consultancy Services for Preparation of Inception Report & Detailed Project Report (DPR) for Development of Multi Modal Logistics Park at Silchar in the State of Assam under Bharatmala Pariyojana. Dated: 15-02-2021.
  106. Technical Evaluation Result for Improvement of existing road to 2 laning with Hard Shoulders of 2 laning of Maram- Peren section (Package-IIB , length- 18.160 Km) from Design Chainage 56.840 km to km 75.000 on NH-129A in the State of Manipur on EPC mode. Dated: 10-02-2021.
  107. Technical Evaluation Result for Construction of Uni-Directional Khellani Tunnel of length 1.574 Km & its approach Road from Km 29.030 to Km 31.449 of total length of 2.419 Km on NH-244 in Union Territory of Jammu & Kashmir on EPC Mode. (Pkg-III). Dated: 08-02-2021.
  108. Technical Evaluation Result for Improvement of existing road to 2 laning with Hard Shoulders of 2 laning of Maram-Peren section (Package-IIA, length- 16.840 Km) from Design Chainage 40.000 km to 56.840 Km on NH-129A in the State of Manipur on EPC mode. Dated: 08-02-2021.
  109. Technical Evaluation Result for Detailed survey of NH-4 from Km 0.00 to Km 330.7 using Network Survey Vehicle (NSV) in the Union Territory of Andaman & Nicobar Islands-2 Call. Dated: 03-02-2021.
  110. Technical Evaluation Result for Improvement of existing road to 2 laning with Hard Shoulders of Maram- Peren section (Package-IA, length- 22.340 Km) from Design Chainage 0.000 km to 22.340 Km on NH-129A in the State of Manipur on EPC Mode. Dated: 03-02-2021.
  111. Technical Evaluation Result for Improvement of existing road to 2 laning with Hard Shoulders of Maram- Peren section (Package-IB, length- 17.660 Km) from Design Chainage 22.340 Km to Km 40.000 on NH-129A in the State of Manipur on EPC mode. Dated: 02-02-2021.
  112. Technical Evaluation Result for Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 173.850 to Km 190.850 (Length – 17.00 Km) in the state of Nagaland on EPC mode (Pkg – V) under NH(O) – TSP. Dated: 02-02-2021.
  113. Technical Evaluation Result for Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 146.208 to Km 163.592 (Length – 17.384 Km) in the state of Nagaland on EPC mode (Pkg – III) under NH(O) – TSP. Dated: 02-02-2021.
  114. Technical Evaluation Result for Realignment of NH717A from Design CH: 0.00 (Km 77.800 of NH-10) to Design CH: 2.00 (Km 3.100 of NH-717A) with two lane paved shoulder including Major Bridge of 680 m in the State of Sikkim on EPC Mode. Dated: 02-02-2021.
  115. Technical Evaluation Result for Rehabilitation and up-gradation of road from design km 19.300 to km 31.300 (Total length: 12.000 km) of Agartala – Khowai section on NH 108 B to two lane with paved shoulder in the state of Tripura on EPC basis (Package-II). Dated: 02-02-2021.
  116. Technical Evaluation Result for Construction & Upgradation to 2-lane /4lane with paved shoulder from Design Km 148+589 (Existing km 235+070) (Vailoo )to Design Km 176+532 (Existing km 263+070) Donipawa of 27.943 km length on Khellani-Khanabal section of NH-244 in the Union Territory of Jammu & Kashmir on EPC mode. (Pkg–VI. Dated: 01-02-2021.
  117. Technical Evaluation Result for Ordinary Repair of Ukhrul-Toloi-Tadubi road from km 00.000 to km 60.000 covering 60.00 Km length on NH-102A in the state of Manipur on Item Rate Basis. Dated: 01-02-2021.
  118. Technical Evaluation Result for Ordinary Repair of Ukhrul-Toloi-Tadubi road from km 60.000 to km 115.000 covering length of 55.00 Km on NH-102A in the state of Manipur on Item Rate Basis. Dated: 01-02-2021.
  119. Technical Evaluation Result for Rehabilitation of section from Km 298.00 to Km 330.662 (Karala to Kalipur) of NH-04 to Intermediate lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands (Total Length 32.662 km) on EPC Mode (Package- VIII). Dated: 01-02-2021.
  120. Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF: (i) Construction of two lane with hard shoulders of Arrowa-Khupa-Hayuliang Section of NH-113 from Ch 68.550 Km to 91.633 in the state of Arunachal Pradesh on EPC Mode under NH(O)-NE. (ii) Construction of two lane with hard shoulders of Demwe-Brahmkund section of NH- 13 from Ch 0.000 Km to 18.464 in the state of Arunachal Pradesh on EPC Mode under NH(O)-NE. Dated: 01-02-2021.
  121. Technical Evaluation Result for Consultancy Services for Authority’s Engineer for Supervision of (i)“Construction of 2 laning with Hard shoulder of Peren- Dimapur section on NH 129A from Design Km 109.494 to Km 126.775 (Length – 17.281 Km) in the state of Nagaland on EPC mode (Package I) under NH(O)- TSP) (ii) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 126.775 to Km 146.450 (Length – 19.675 Km) in the state of Nagaland on EPC mode (Pkg – II) under Bharatmala NH(O) – TSP. Dated: 01-02-2021.
  122. Technical Evaluation Result for CONSTRUCTION OF BALANCE WORK OF TWO – LANE WITH HARD SHOULDERS OF EXISTING HAYULIANG – HAWAI ROAD (NH-113) FROM DESIGN KM 51.825 TO KM 63.131 (EXISTING KM 45.050 OF HAYULIANG – HAWAI ROAD TO HAWAI TOWN)(11.306 KM) ON EPC BASIS IN THE STATE OF ARUNACHAL PRADESH PACKAGE OF SARDP – NE(GREEN FIELD ALIGNMENT). Dated: 29-01-2021.
  123. Technical Evaluation Result for CONSTRUCTION OF BALANCE WORK OF 2 LANING OF AKAJAN-LIKABALI-BAME ROAD ON EPC BASIS FROM DESIGN KM 33.00 TO KM 65.810 (EXISTING KM 36.00 TO KM 71.00) IN THE STATE OF ARUNACHAL PRADESH UNDER SARDP-NE). Dated: 29-01-2021.
  124. Technical Evaluation Result for Construction & Upgradation to 2 lane with paved shoulder from Design Km. 31.449 (Khellani) (Ex. Km 44.946) to Km 51.700 (Prem Nagar) (Ex. Km 68+617) of 20.251 Km length on Khellani – Kishtwar – Chattroo section of NH-244 in the Union Territory of Jammu & Kashmir on EPC mode (Pkg –I). Dated: 25-01-2021.
  125. Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 81+000 to km 95+400 (Design Chainage 80+930 to 96+400) of Loring Thepi – Ganapath Gaur Gaon Section – (Package-4) of NH-29 in the state of Assam under Bharatmala Pariyojana on EPC mode. Dated: 19-01-2021.
  126. Technical Evaluation Result for Construction, Operation & Maintenance of Automated Site adjoining Co Construction, Operation & Maintenance of Automated multilevel car parking facility At Site adjoining Co-op Dept. Building, Kacheripady, Kochi, Kerala. Dated: 15-01-2021.
  127. Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of“Construction and Upgradation of existing road on NH-510 between Rabangla to Gyalshing to 2-lane with paved shoulder configuration in the State of Sikkim under SARDP-NE Phase ‘A’ on EPC mode for (i) Km 32+500 to Km 33+600 (Package-III), (ii) Km 33+600 to Km 58+840 (Package IV), (iii) Km 58+840 to Km 75+000 (Package V) & (iv) Km 75+000 to Km 90+210(Package VI)” (2nd Call). Dated: 12-01-2021.
  128. Technical Evaluation Result for Construction and upgradation of existing road to 2-lane with Paved shoulder from km. 20.340 (Rongli Bazzar) to km. 26.588 (Rongli Bypass End) and upgradation of existing road at km 20.600 & km 26.400 for length of 0.520 km & 0.554 km of Rhenok – Menla spur (NH-717B) Package-II A on EPC Basis under SARDP- NE Phase ‘A’ in the State of Sikkim. Dated: 11-01-2021.
  129. Technical Evaluation Result for Procurement of Ambulances- Fully equipped Ambulances for Highway patrolling under the jurisdiction of NHIDCL’s Regional Offices located in NER States, UT of Ladakh, J&K, A&N Islands and Uttarakhand. Dated: 11-01-2021.
  130. Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF (i) WIDENING/IMPROVEMENT TO 4 (FOUR) LANE WITH PAVED SHOULDER FROM KM 66+000 TO KM 81+000 (DESIGN CHAINAGE 65+923 TO 80+930) OF DOKMOKA – LORINGTHEPI SECTION (PACKAGE-3) OF NH-29 IN THE STATE OF ASSAM UNDER BHARATMALA PARIYOJNA ON EPC MODE And (ii) WIDENING/IMPROVEMENT TO 4 (FOUR) LANE OF DABOKA DIMAPUR STRETCH FROM KM 81+000 TO KM 95+400 (DESIGN CHAINAGE 80+930 TO 96+400) OF LORING THEPI – GANAPATH GAUR GAON SECTION – (PACKAGE-4) OF NH-29 IN THE STATE OF ASSAM ON EPC MODE. Dated: 08-01-2021.
  131. Technical Evaluation Result for Construction of High Altitude Hill road from Ladda to Basai from KM 0.000 to KM 32.260 in East Kameng District of the state of Arunachal Pradesh on EPC Mode. Dated: 08-01-2021.
  132. Technical Evaluation Result for Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 126.775 to Km 146.450 (Length – 19.675 Km) in the state of Nagaland on EPC mode (Pkg – II) under Bharatmala NH(O) – TSP . Dated: 07-01-2021.
  133. Technical Evaluation Result for Consultancy Services for supervision of “Special repair of NH 202, Mokokchung-Tuensang Road (from Km 0.000 to 95.000 Km) [Total length – 95.00 Km] in the state of Nagaland for the FY 2020-21-3rd Call. Dated: 07-01-2021.
  134. Technical Evaluation Result for Consultancy Services for supervision of Special repair of NH 702-D, Mokokchung-Mariani Road (from Km 0.000 to 63.000 Km) [Total length – 63.00 Km] in the state of Nagaland for the FY 2020-21-3rd Call. Dated: 07-01-2021.
  135. Technical Evaluation Result for Instructions to tenderers and from of tender for PART DESIGN, CONSTRUCTION, OPERATION & MAINTENANCE (For a Period of 5 Years) OF FULLY AUTOMATIC MULTI-LEVEL CAR PARKING SYSTEM AT CENTRAL CIVIL SECRETARIAT, ITANAGAR, ARUNACHAL PRADESH (4th call). Dated: 04-01-2021.
  136. Technical Evaluation Result for Restoration/ Rehabilitation Of Ukhrul To Nagaland Border Via Jessami Road From Km 95.00 To Km 111.00 (Length 16 Km) NH-150 In The State Of Manipur-2nd call. Dated: 02-01-2021.
  137. Technical Evaluation Result for Restoration/ Rehabilitation Of Ukhrul To Nagaland Border Via Jessami Road From Km 79.00 To Km 95.00 (Length 16 Km) NH-150 In The State Of Manipur-2nd Call. Dated: 02-01-2021.