GST No. 07AAECN7759E1Z7
CIN : U45400DL2014GOI269062
A+
A+
A+
A+
National Portal
English
हिन्दी
(
Hindi
)
National Highways & Infrastructure Development Corporation Ltd.
Ministry of Road Transport & Highways, Government of India
Home
About
About Us
Our Organisation
Who’s who
Our Mission
Our Vision
Honourable Minister’s Message
Annual Report
2021-2022
2020-2021
2019-2020
2018-2019
2017-2018
2016-2017
2015-2016
2014-2015
CSR
Annual Return of NHIDCL
2020
2021
2022
Skill Development Training Program
International Cooperation
RTI
GST Cell
MoA(Memorandum of Association) & Notices
Dispute Resolution Mechanism
Internal Complaints Committee (ICC)
Chief Vigilance officer (CVO)
Independent External Monitor (IEM)
Projects
Current Status
All States
Andaman & Nicobar
Arunachal Pradesh
Assam
Himachal Pradesh
Manipur
Meghalaya
Mizoram
Nagaland
Sikkim
Tripura
Union Territory of Jammu & Kashmir
Union Territory of Ladakh
Uttarakhand
West Bengal
Nepal
Project Archive
Maps
Andaman & Nicobar
Arunachal Pradesh
Assam
Himachal Pradesh
Manipur
Meghalaya
Mizoram
Nagaland
Sikkim
Tripura
Union Territory of Jammu & Kashmir
Union Territory of Ladakh
Uttarakhand
West Bengal
Nepal
e Book
NHIDCL 2016
NHIDCL 2015
Guidelines on LA
Infracon
INAM-Pro
INAM-Pro Brochure
BGMS
Sugampath
IT Task Force
Essential Safety for Hill Roads
Standardization of Reporting Responsibilities for AEs & IEs
Appropriate Technologies for Soil & Slope Stabilization
ePace
BIMS Brochure
eAccess
The Motor Vehicles Act, 1988
The Central Motor Vehicles Rules, 1989
Tenders
Current Tenders
Tender Archive
eAuction
Current eAuction
Archive eAuction
Black List / Debarment
Termination
Negative List
Non-Performer
List of Banks
Links
Bank of Ideas
NHIDCL Email
INAM-Pro
INFRACON
BG Management
Bhoomirashi
eDMS
eOffice
SAP
PMIS
BiMS
eProcurement
Grievance Redressal
CPGRAMS
ePACE
India Investment Grid (IIG)
eSamiksha Monitoring
eSamiksha Review
eSuvidha
Ministry of Road Transport & Highways
OCMS
VIP References
IAHE
National Highways Authority of India
IRC
Ministry of External Affairs
Ministry of Shipping
MSME SAMBANDH
Events
Images
Videos
Official Language Gallery
Web Portal Videos
Presentation
Employee Portal
Career
Current Openings
Opening Archive
Contact
Corporate Office
Details of NHIDCL Officers & Staff on Deputation/ Contract
Field Offices
Feedback
Home
About
About Us
Our Organisation
Who’s who
Our Mission
Our Vision
Honourable Minister’s Message
Annual Report
2021-2022
2020-2021
2019-2020
2018-2019
2017-2018
2016-2017
2015-2016
2014-2015
CSR
Annual Return of NHIDCL
2020
2021
2022
Skill Development Training Program
International Cooperation
RTI
GST Cell
MoA(Memorandum of Association) & Notices
Dispute Resolution Mechanism
Internal Complaints Committee (ICC)
Chief Vigilance officer (CVO)
Independent External Monitor (IEM)
Projects
Current Status
All States
Andaman & Nicobar
Arunachal Pradesh
Assam
Himachal Pradesh
Manipur
Meghalaya
Mizoram
Nagaland
Sikkim
Tripura
Union Territory of Jammu & Kashmir
Union Territory of Ladakh
Uttarakhand
West Bengal
Nepal
Project Archive
Maps
Andaman & Nicobar
Arunachal Pradesh
Assam
Himachal Pradesh
Manipur
Meghalaya
Mizoram
Nagaland
Sikkim
Tripura
Union Territory of Jammu & Kashmir
Union Territory of Ladakh
Uttarakhand
West Bengal
Nepal
e Book
NHIDCL 2016
NHIDCL 2015
Guidelines on LA
Infracon
INAM-Pro
INAM-Pro Brochure
BGMS
Sugampath
IT Task Force
Essential Safety for Hill Roads
Standardization of Reporting Responsibilities for AEs & IEs
Appropriate Technologies for Soil & Slope Stabilization
ePace
BIMS Brochure
eAccess
The Motor Vehicles Act, 1988
The Central Motor Vehicles Rules, 1989
Tenders
Current Tenders
Tender Archive
eAuction
Current eAuction
Archive eAuction
Black List / Debarment
Termination
Negative List
Non-Performer
List of Banks
Links
Bank of Ideas
NHIDCL Email
INAM-Pro
INFRACON
BG Management
Bhoomirashi
eDMS
eOffice
SAP
PMIS
BiMS
eProcurement
Grievance Redressal
CPGRAMS
ePACE
India Investment Grid (IIG)
eSamiksha Monitoring
eSamiksha Review
eSuvidha
Ministry of Road Transport & Highways
OCMS
VIP References
IAHE
National Highways Authority of India
IRC
Ministry of External Affairs
Ministry of Shipping
MSME SAMBANDH
Events
Images
Videos
Official Language Gallery
Web Portal Videos
Presentation
Employee Portal
Career
Current Openings
Opening Archive
Contact
Corporate Office
Details of NHIDCL Officers & Staff on Deputation/ Contract
Field Offices
Feedback
Home
About
About Us
Our Organisation
Who’s who
Our Mission
Our Vision
Honourable Minister’s Message
Annual Report
2021-2022
2020-2021
2019-2020
2018-2019
2017-2018
2016-2017
2015-2016
2014-2015
CSR
Annual Return of NHIDCL
2020
2021
2022
Skill Development Training Program
International Cooperation
RTI
GST Cell
MoA(Memorandum of Association) & Notices
Dispute Resolution Mechanism
Internal Complaints Committee (ICC)
Chief Vigilance officer (CVO)
Independent External Monitor (IEM)
Projects
Current Status
All States
Andaman & Nicobar
Arunachal Pradesh
Assam
Himachal Pradesh
Manipur
Meghalaya
Mizoram
Nagaland
Sikkim
Tripura
Union Territory of Jammu & Kashmir
Union Territory of Ladakh
Uttarakhand
West Bengal
Nepal
Project Archive
Maps
Andaman & Nicobar
Arunachal Pradesh
Assam
Himachal Pradesh
Manipur
Meghalaya
Mizoram
Nagaland
Sikkim
Tripura
Union Territory of Jammu & Kashmir
Union Territory of Ladakh
Uttarakhand
West Bengal
Nepal
e Book
NHIDCL 2016
NHIDCL 2015
Guidelines on LA
Infracon
INAM-Pro
INAM-Pro Brochure
BGMS
Sugampath
IT Task Force
Essential Safety for Hill Roads
Standardization of Reporting Responsibilities for AEs & IEs
Appropriate Technologies for Soil & Slope Stabilization
ePace
BIMS Brochure
eAccess
The Motor Vehicles Act, 1988
The Central Motor Vehicles Rules, 1989
Tenders
Current Tenders
Tender Archive
eAuction
Current eAuction
Archive eAuction
Black List / Debarment
Termination
Negative List
Non-Performer
List of Banks
Links
Bank of Ideas
NHIDCL Email
INAM-Pro
INFRACON
BG Management
Bhoomirashi
eDMS
eOffice
SAP
PMIS
BiMS
eProcurement
Grievance Redressal
CPGRAMS
ePACE
India Investment Grid (IIG)
eSamiksha Monitoring
eSamiksha Review
eSuvidha
Ministry of Road Transport & Highways
OCMS
VIP References
IAHE
National Highways Authority of India
IRC
Ministry of External Affairs
Ministry of Shipping
MSME SAMBANDH
Events
Images
Videos
Official Language Gallery
Web Portal Videos
Presentation
Employee Portal
Career
Current Openings
Opening Archive
Contact
Corporate Office
Details of NHIDCL Officers & Staff on Deputation/ Contract
Field Offices
Feedback
Tender Evaluation Result 2021
Tender Evaluation
Result 2021
Technical Evaluation Result for Selection of Manpower Placement Agency for providing services of Outsourced manpower on monthly basis for NHIDCL at Regional Office- Port Blair, its PMUs and site offices in the Union Territory of Andaman & Nicobar Islands – 6TH Call. Dated: 30-12-2021.
Technical Evaluation Result for EXPRESSION OF INTEREST (EOI) for Authority’s Engineer for “Up-gradation /widening and construction of 4 – lane with paved shoulders from Srirampur to Dhubri (Length 54.154 km) of National Highway (NH-127B) in the State of Assam under JICA ODA Loan assistance (Phase-V) on EPC mode. Dated: 29-12-2021.
Technical Evaluation Result for Improvement/widening to Two-laning with earthen shoulder of Panda (Design Ch. 112.300 km) to Baghmara (Design Ch. 129.385 km )[R-M-B Package-VI] on SH-4 section of Ranikor- Maheshkhola-Baghmara Project in the state of Meghalaya on EPC basis. Dated: 22-12-2021.
Technical Evaluation Result for Four laning of Sethawn – N. Kawnpui section (Package-6) of NH-6 from Existing Chainage km 107+850 to km 126+315 (Design Chainage km 95+500 to km 111+850) on Silchar – Vairengte – Sairang road in the State of Mizoram under Bharatmala Pariyojna on EPC mode. Dated: 13-12-2021.
Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ram- Mandir to Arrowa section of NH-113 from Design Km 0.000 to Km 2.910 (Existing Km 65.080 to Km 68.550) of total length 2.755 km excluding Tidding Bridge (154.725 m) in the State of Arunachal Pradesh on EPC mode. Dated: 09-12-2021.
Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of Highway 8.5 Km. Tunnel including approaches at Pir Ki Gali Pass From Km.31.100 to Km.49.300 on Mughal road connecting Shopian with Bafliaz in Poonch District road in the Union Territory of Jammu & Kashmir. Dated: 09-12-2021.
Technical Evaluation Result for Four laning of Vairengte – Chhimluang section (Package-3) of NH-306 from Existing Chainage km 43+000 to km 59+700 (Design Chainage km 46+000 to km 60+850) on Silchar – Vairengte – Sairang road in the State of Mizoram under Bharatmala Pariyojna on EPC mode. Dated: 06-12-2021.
Technical Evaluation Result for Up-gradation to 2 lane with paved shoulders of Pawlrang – Rulchawm section of NH-102B of Aizawl – Imphal Economic Corridor from Existing Chainage km 72.030 to km 104.129 including 2.459 km re-alignment section from Tuivawl River to Rulchawm connecting km 48.150 of NH-6 [Design Chainage km 68.170 to km 98.579] (Package-III) in the State of Mizoram under Bharatmala Pariyojna on EPC mode. Dated: 03-12-2021.
Technical Evaluation Result for Up-gradation to 2 lane with paved shoulders of Ngopa – Pawlrang section of NH-102B of Aizawl – Imphal Economic Corridor from Existing Chainage km 32.796 to km 72.030 [Design Chainage km 31.280 to km 68.170] (Package-II) in the State of Mizoram under Bharatmala Pariyojna on EPC mode. Dated: 30-11-2021.
Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Ch. from Km 101+280 to Km 131+280 (PKG-5) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode. Dated: 30-11-2021.
Technical Evaluation Result for Construction of 2 lane Minor Bridge at Km 26.700 (Dhanikhadi) in CRZ area on NH-4 in the Union Territory of Andaman & Nicobar Islands on EPC basis. Dated: 27-11-2021.
Technical Evaluation Result for Ordinary repair of NH-208 of length 22.731 Km in the stretches from Ch. 208.800 km (Jatanbari Tri-junction) to Ch. 231.530 (Ailmara Tri-junction) in the state of Tripura in the FY 2021-22 on work order basis (3rd Call). Dated: 24-11-2021.
Technical Evaluation Result for Restoration &Rehabilitation of Ukhrul-Toloi-Tadubi road section from Km 60.00 to Km 115.00 covering Km 55.00 length on NH-102A in the state of Manipur in the year 2021-2022 on Item Rate Basis. Dated: 18-11-2021.
Technical Evaluation Result for Restoration & Rehabilitation of Ukhrul-Toloi-Tadubi Road from Km 0.00 to Km 60.00 covering length 60 Km on NH-102A in the state of Manipur in the year 2021-2022 on Item Rate Basis (2 nd Call). Dated: 18-11-2021.
Technical Evaluation Result for Restoration & Rehabilitation of Lainey Bridge to Jessami Road from Km 120.367 to Km 132.00 on NH-29 in the state of Manipur in the year 2021-2022 on Item Rate Basis (2nd Call). Dated: 18-11-2021.
Technical Evaluation Result for Hiring of Vehicles on Monthly Basis for PMU BOMDILA, Arunachal Pradesh. Dated: 13-11-2021.
Technical Evaluation Result for Restoration & Repairs of Jammu-Akhnoor road section in NH-144A from (Thati Chowk) to (Hanuman Chowk) (km 26.350 to Km 30.097) [Total Length 3.747 km] in the UT of Jammu & Kashmir in the year 2021-22. Dated: 08-11-2021.
Technical Evaluation Result for Restoration and Repair of Helmet top realignment road from Km 1.570 to 2.570 by way of construction of R/wall, Crate wall, Box culvert and Laying of WBM-III, BM & BC in the UT of Jammu & Kashmir for FY 2021-2022. Dated: 13-11-2021.
Technical Evaluation Result for Hiring of Vehicles on Monthly Basis for PMU-DIPHU, Assam. Second Call. Dated: 03-11-2021.
Technical Evaluation Result for Rehabilitation and Upgradation of Nongstoin-Rambrai- Kyrshai road up to Meghalaya-Assam Border from km 0.335 to km 34.039 to 2-Lane under SARDP-NE “Phase-A” in the state of Meghalaya on EPC mode (Package-I). Dated: 05-11-2021.
Technical Evaluation Result for Consultancy Services for Identification & Preparation of Detailed Project Report for Slope Protection work on Hill & Valley Side, Sinking Zones and Bridges in between Km 368.000 to Km 468.000 (NH-07), in the State of Uttarakhand. Dated: 02-11-2021.
Technical Evaluation Result for MAINTENANCE/ IMPROVEMENT WORK OF CONSTRUCTION OF TWO- LANE WITH PAVED SHOULDERS OF JORAM-KOLORIANG ROAD (NH-713) ON EPC BASIS FROM EXISTING KM 138.00 TO KM 158.00 (DESIGN KM 122.353 TO KM 138.389) [DESIGN LENGTH – 16.036 KM] IN THE STATE OF ARUNACHAL PRADESH. Dated: 29-10-2021.
Technical Evaluation Result for Restoration and Repair by way of Providing, Installing and Construction of Road safety Item Retaining wall, Breast/wall, Metallic Crash Barrier, Retroreflective Sign Board, Overhead Signs/Gantry Sign Board from Km 97.00 to Km 124.00 on Dulhasti – Kishtwar- Bandarkoot existing section of NH-244 in the UT of Jammu & Kashmir for FY 2021-2022. Dated: 28-10-2021.
Technical Evaluation Result for Restoration & Repair by way installing and construction of Road safety Item viz. Retaining wall, Breast/wall, Metallic Crash Barrier, Retroreflective Sign Board, Overhead Signs/Gantry Sign Board from Km 0.000 to Km 45.00 on Batote- Khellani stretch and km 0.000 to km 8.000 of Paryote-Puldoda stretch (re-alignment portion) on NH244 in the UT of Jammu & Kashmir for FY 2021-2022. Dated: 28-10-2021.
Technical Evaluation Result for CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF FOLLOWING PROJECTS IN THE UNION TERRITORY OF LADAKH. (i) Up-gradation to Intermediate lane of NH-301 Kargil-Zanskar road from km 87.000 to km 98.524 in the UT of Ladakh on EPC mode under [ job No: NH- 301-J&K-2019-20-74] (Package-IV). (ii) Up-gradation to Intermediate lane of NH-301 Kargil-Zanskar road from km 98.524 to km 117.180 in the UT of Ladakh on EPC mode under [ job No: NH- 301-J&K-2019-20-75] (Package-V). (iii) Up-gradation to Intermediate lane of NH-301 Kargil-Zanskar road from km 117.180 to km 148.320 in the UT of Ladakh on EPC mode under [ job No: NH- 301-J&K-2019-20-76] (Package-VI). (iv) Up-gradation to Intermediate lane of NH-301 Kargil-Zanskar road from km 148.320 to km 196.250 in the UT of Ladakh on EPC mode under [job No: NH- 301-J&K-2019-20-80] (Package-VII). Dated: 13-10-2021.
Technical Evaluation Result for CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF (I) Widening/Up-Gradation to 2 lane with Paved shoulder of NH301 Kargil- Zanskar Road from Design km 0.000 (Existing km 0.000) to Design km 30.040 (Existing km 30.000) in the UT of Ladakh on EPC mode (Package-I) (II) Widening/Up-Gradation to 2 lane with Paved shoulder of NH301 Kargil- Zanskar Road from Design km 30.040 (Existing km 30.000) to Design km 57.000 (Existing km 57.905) in the UT of Ladakh on EPC mode (Package-II) (III) Widening/Up-Gradation to 2 lane with Paved shoulder of NH301 Kargil- Zanskar Road from Design km 57.000 (Existing km 57.905) to Design km 87.000 (Existing km 88.249) in the UT of Ladakh on EPC mode (Package-III) & (IV) Widening/Up-Gradation to 2 lane with Paved shoulder of NH-301 Kargil Zanskar Road from Design km 196.250 (Existing km 194.790) to Design km 230.020 (Existing km 231.692) in the UT of Ladakh on EPC mode (Package-VIII). Dated: 13-10-2021.
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder of Daboka Dimapur stretch from km 113+300 to km 146+250 (Design Chainage 113+830 to 145+712) of Kwaram Taro Village – Manja Section – (Package-6) of NH-29 in the state of Assam on EPC mode. and (ii) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 146+250 to Km 157+460 (Design Chainage145+712 to 156+502) of DillaiLahorijan (Package-7) of NH 29 in the state of Assam on EPC mode. Dated: 11-10-2021.
Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage 50.850 Km to 81.870 Km (Package 3) in the State of Manipur on EPC mode-2nd Call. Dated: 11-10-2021.
Technical Evaluation Result for Restoration & Rehabilitation of NH -37 of Imphal-Jiribam Road (Km 145.00 to Km 221.138) [Total Length = 76.138 km] in the state of Manipur in the year 2021-2022 (3 rd Call). Dated: 08-10-2021.
Technical Evaluation Result for Restoration of Road by way of Clearance of Snow from Km 143.00 to Km 204.00 on Kishtwar-Sinthanpass-Anantanag road (NH-244) in the UT of Jammu & Kashmir. Dated: 05-10-2021.
Technical Evaluation Result for Snow Restoration of Road Clearance by way of Clearance of Snow from Km 204.00 to Km 235.00 & Km 256.00 to Km 265.00 on Sinthanpass- Anantanag road (NH-244) in the UT of Srinagar & Kashmir. Dated: 05-10-2021.
Technical Evaluation Result for Rehabilitation and Upgradation of Nongstoin-Rambrai- Kyrshai road up to Meghalaya-Assam Border from km 0.335 to km 34.039 to 2-Lane under SARDP-NE “Phase-A” in the state of Meghalaya on EPC mode (Package-I).. Dated: 06-10-2021.
Technical Evaluation Result for CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF (I)Construction & Upgradation to 2-lane /4lane with paved shoulder from Design Km 148+589 (Existing km 235+070) (Vailoo )to Design Km 176+532 (Existing km 263+070) Donipawa of 27.943 km length on Khellani-Khanabal section of NH-244 in the Union Territory of Jammu & Kashmir on EPC mode.(Pkg-VI). & (II) Construction of New 2-Lane bypass from Design km 176+532(Existing km 263+070) (Donipawa) on NH-244 to Design Km 185+002 (Near Khudwani on NH-44 at existing km 238+500)(Ashajipora) of 8.470km length i.e. to connecting NH-244 & NH-44 in the Union Territory of Jammu & Kashmir on EPC mode. (Pkg–VII) & (III) Strengthening & Upgradation of existing carriageway to intermediate lane from Km.0.00 to Km.42.820 of length 42.820 Kms on Baramulla-Gulmarg section of NH-701A in the Union Territory of Jammu & Kashmir on EPC mode. Dated: 30-09-2021.
Technical Evaluation Result for Maintenance & Repair work of Ranipool to Pakyong stretch from km 2.000 to km 16.000 at NH-717A on Percentage Rate Contract in the state of Sikkim for FY 2021-22. Dated: 29-09-2021.
Technical Evaluation Result for Tender for award of rate contract for misc. electrical maintenance work including providing and fixing of required electrical items at National Highways & Infrastructure Development Corporation Ltd (NHIDCL) at its office at Ground, 2nd , 3 rd Floor of PTI Building & its office at Jeevan Tara Building, New Delhi and any other office space in Delhi/New Delhi. Dated: 29-09-2021.
Technical Evaluation Result for Award of rate contract for repair and maintenance (including supply of requisite materials/part) of office furniture & fixture and day to day items, plumbing, carpentry work, etc. at National Highways Infrastructure Development Corporation Ltd (NHIDCL) at its office at Ground, 2nd, 3rd, Floor of PTI Building & its office at Jeevan Tara Building, New Delhi and any other office space in Delhi/New Delhi. Dated: 29-09-2021.
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Improvement and Widening to two lane with paved shoulder of Manu – Simlung section of NH-44A in the state of Tripura on Engineering, Procurement & Construction (EPC) mode – Package-II starting near Lalchara at km 16+077 and ending near Kanchanpur at km 43+935. (ii) Rehabilitation and up-gradation of road from km 110.119 to km 131.480 (Total length: 19.015 km) of Vaghmun- Simlung section of Manu-Simlung road on NH-44A to two lane with paved shoulder in the state of Tripura on EPC basis- (package-IV). Dated: 28-09-2021.
Technical Evaluation Result for Construction of North East Regional Office of National Highways & Infrastructure Development Corporation Ltd. at Guwahati, Assam on EPC mode. Dated: 27-09-2021.
Technical Evaluation Result for Construction of Two Major bridges at Existing Ch. 23+650 (design Ch. 23+550) and Ch. 28+200 (design Ch. 28+200) each bridge of span 160 m along the Existing Hunli-Anini Road from Km 21.500 to Km 37.500 in the State of Arunachal Pradesh on EPC Mode under SARDP-3 rd call. Dated: 23-09-2021.
Technical Evaluation Result for Restoration and Repairs (R&R)/Strengthening to Single Lane with Earthen Shoulder of Srirampur to Dhubri section of Newly declared NH-127B (old Village road) from Existing Km 7.700 to Km 24.400 (Gossaigaon- Tamahat Road), Existing Km 0.000 to Km 24.000 (Dhubri –Kachugaon Road) and Existing Km 1.000 to Km 16.200 (Dhubri-Kacharihat-Balajan Road) in the State of Assam under M&R in FY:21-22. Dated: 22-09-2021.
Technical Evaluation Result for Four laning of Dolabari to Jamuguri section from km 17.3 of NH-37A to km 182.0 of NH-52 in the State of Assam under SARDP-NE, Phase A on EPC Mode. Dated: 22-09-2021.
Technical Evaluation Result for Construction of Balance Work of 2 Lane with Paved Shoulders of Joram- Koloriang road (NH 713) on EPC basis from existing Km 138.00 to Km 158.000 (Design Km 122.353 to Km 138.389)[Design length-16.036 Km] in the State of Arunachal Pradesh under SARDP-NE. Dated: 21-09-2021.
Technical Evaluation Result for Detailed survey of various roads using Network Survey Vehicle (NSV) in the State of Uttarakhand. Dated: 20-09-2021.
Technical Evaluation Result for Four laning of Jorhat – Jhanji section of NH-37 from km 453.000 to km 491.050 (Design km 453.000 to km 491.800) in the State of Assam under SARDP-NE, on EPC basis. Dated: 20-09-2021.
Technical Evaluation Result for Four laning from Biswanath Chariali by-pass (Km 208.00 to Gohpur Km 265.50 in the state of Assam on EPC basis Under SARDP-NE. Dated: 20-09-2021.
Technical Evaluation Result for Development of Inland Water Transport (IWT) Terminal at MMLP Jogighopa, Assam on EPC mode. Dated: 20-09-2021.
Technical Evaluation Result for Re-award of construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 0.00 to design Km 10.500 [Design Length – 10.500 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package I). Dated: 18-09-2021.
Technical Evaluation Result for Ordinary Repairs of NH-4 from Ch 21+000 km to Ch 28+000 km in the Union Territory of Andaman and Nicobar Islands in the year 2021-22, 2 nd Call. Dated: 13-09-2021.
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Construction of two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur starting from km 54.180 near Azuram to km 80.630 near Mandeu (Package-5) on EPC mode. (ii) Construction of two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur starting from km 80.630 near Mandeu to km 96.870 near Jiri River (Package-6) on EPC mode. Dated: 10-09-2021.
Technical Evaluation Result for Lease of Office Premises of NHIDCL, Project Monitoring Unit – Jorhat (Assam). Dated: 08-09-2021.
Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF “Construction of New Two-Lane Bridge with its approaches from Km 0+000 to Km 4+385 across River Brahmaputra on NH-17 at Jogighopa in the State of Assam on EPC mode.” Dated: 09-09-2021.
Technical Evaluation Result for Restoration & Rehabilitation of NH-39A of Imphal-Kohima Road (Design Alignment) from Km 287.00 to Km 297.70 (Total Length: 10.70 Km) in the state of Manipur on Item Rate Basis in the FY 2021-22 (3rd call). Dated: 09-09-2021.
Technical Evaluation Result for Installation of wire mesh fencing on NH land from km 0+350 to km 0+480 and km 2+300 to km 2+580 (old alignment MJB No. 2) of Chenani-Sudhmahadev road section of NH-244 in the UT of Jammu & Kashmir in the year 2021-22. Dated: 09-09-2021.
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 113+300 to Km 146+250 (Design Chainage 113+830 to 145+712) of Kwaram Taro Village – Dillai Section (Package-6) of NH 29 in the state of Assam on EPC mode. Dated: 07-09-2021.
Technical Evaluation Result for Consultancy services as Authority’s Engineer for supervision of Construction of (i) Connecting road from Z-Morh Tunnel to Zojila Tunnel and (ii) 14.150 km long bi-directional tunnel across Zojila Pass on Sonamarg-Kargil section of NH-01 on EPC mode in the Union Territories of Jammu & Kashmir and Ladakh. Dated: 07-09-2021.
Technical Evaluation Result for Balance work of Construction of Two-lane with hard shoulders of Merangkong-Tamlu-Mon Road on EPC basis from existing Km 76.640 to Km 98.065 [Design Km. 63.800 to Km. 86.835] (Design length-23.035 km) in the state of Nagaland under SARDP-NE Phase A. Dated: 07-09-2021.
Technical Evaluation Result for Construction of two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur starting from km 80.630 near Mandeu to km 96.870 near Jiri River (Package-6) on EPC mode. Dated: 07-09-2021.
Technical Evaluation Result for Repair & Rehabilitation work of Minor Bridge at Km 15.120 of NH31B of Tulungia-Jogighopa Section in the State of Assam in FY 21-22 (4th Call). Dated: 06-09-2021.
Technical Evaluation Result for Selection of Manpower Placement Agency for providing services of Semi-skilled and skilled manpower on monthly basis for NHIDCL Regional Office (RO) -Itanagar and various PMUs and Site Offices under RO-Itanagar. Dated: 06-09-2021.
Technical Evaluation Result for Special Repair of NH-702, from Mon to Tizit Stretch (from Km 133.00 to Km 177.00) [Total Length = 44.00 Km] in the State of Nagaland for the FY 2021-22 – 2 nd Call. Dated: 03-09-2021.
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Construction of two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur starting from km 54.180 near Azuram to km 80.630 near Mandeu (Package-5) on EPC mode. (ii) Construction of two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur starting from km 80.630 near Mandeu to km 96.870 near Jiri River (Package-6) on EPC mode. Dated: 02-09-2021.
Technical Evaluation Result for CONSTRUCTION OF FOOT TRACK FROM BASAM TO TATHI FROM KM 0.000 TO KM 32.060 IN UPPER SUBANSIRI VALLEY DISTRICT OF THE STATE OF ARUNACHAL PRADESH ON EPC MODE. Dated: 01-09-2021.
Technical Evaluation Result for CONSTRUCTION OF FOOT TRACK FROM BRUNI TO LAMA FROM KM 0.000 TO KM 32.800 IN ANINI DISTRICT OF THE STATE OF ARUNACHAL PRADESH ON EPC MODE. Dated: 01-09-2021.
Technical Evaluation Result for Up-gradation to 2 lane with paved shoulders of Ngopa – Pawlrang section of NH-102B of Aizawl – Imphal Economic Corridor from Existing Chainage Km 32.796 to Km 72.030 [Design Chainage Km 31.280 to Km 68.170] (Package-II) in the State of Mizoram under Bharatmala Pariyojna on EPC mode. Dated: 31-08-2021.
Technical Evaluation Result for Up-gradation to 2 lane with paved shoulders of Khawkawn(from Bridge across River Tuivai) – Ngopa section of NH102B of Aizawl – Imphal Economic Corridor from Existing Chainage Km 0.000 to km 32.796 [Design Chainage Km 0.000 to Km 31.280] (Package-I) in the State of Mizoram under Bharatmala Pariyojna on EPC mode. Dated: 29-08-2021.
Technical Evaluation Result for Special Repair work of construction of RCC Cover drain, earthen drain and Pipe culverts at different location under Sabroom Sub-Division, South Tripura District along the National Highway – 08 in the State of Tripura. Dated: 26-08-2021.
Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage 50.850 Km to 81.870 Km (Package 3) in the State of Manipur on EPC mode. Dated: 26-08-2021.
Technical Evaluation Result for Selection of Manpower placement Agency for providing services of Staff and Supporting Staffs in Site Offices (SOs) / Project Monitoring Units (PMUs) / Regional Offices (RO), Manipur-2nd Call. Dated: 26-08-2021.
Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage 81.870 Km to 105.825 Km (Package 4) in the State of Manipur on EPC mode. Dated: 26-08-2021.
Technical Evaluation Result for Detailed survey of NH-4 from Km 0.00 to Km 330.7 using Network Survey Vehicle (NSV) in the Union Territory of Andaman & Nicobar Islands; 5th Call.. Dated: 25-08-2021.
Technical Evaluation Result for Improvement of existing road to 2 laning with Hard Shoulders of Maram-Peren section (Package-III, length34.494 Km) from Design Chainage Km 75+000 to 109+494 km on NH-129A in the State of Manipur on EPC Mode. Dated: 24-08-2021.
Final Technical Evaluation Result for Consultancy services as Authority’s Engineer for Supervision of “Upgradation to 2 lane with Paved shoulders of Tuivai – Keifang road, NH-102B of Aizawl – Imphal Economic Corridor from Existing Chainage Km 0.000 (Bridge across Tuivai River at Manipur Mizoram Border) to Km 119.108 (Near Keifang Village) [Design Chainage Km 0.000 to Km 98.579] (Package-I, II & III) in the State of Mizoram under Bharatmala Pariyojna on EPC mode”. Dated: 23-08-2021.
Technical Evaluation Result for Detailed survey of various roads under RO Srinagar using Network Survey Vehicle (NSV) in the UT of Jammu & Kashmir. Dated: 23-08-2021.
Technical Evaluation Result for Construction of two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur starting from km 54.180 near Azuram to km 80.630 near Mandeu (Package-5) on EPC mode. Dated: 18-08-2021.
Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 66.110 km to 101.280 Km (Existing Chainage km 67.496 to Km 103.557) (PKG-4) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode-2 nd Call. Dated: 18-08-2021.
Technical Evaluation Result for CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF (I) Construction & Upgradation to 2 lane with paved shoulder from Design Km. 67.805 (at the end of Km 83rd tunnel near Dhrabshala) to Km 80.675 (Dulhasti) of 12.87 Km length on Khellani – Kishtwar –Chattroo section of NH-244 in the Union Territory of Jammu & Kashmir on EPC mode (Pkg –III). & (II) Construction of Kishtwar bypass with 2 lane with paved shoulder from Design Km. 80.675 (Dulhasti) to Km 95.550 (bandarkoot ) of 14.88 Km length on Khellani – Kishtwar – Chattroo section and a link road to Kishtwar town of 1.871 km on NH-244 in the Union Territory of Jammu & Kashmir on EPC mode (Pkg –IV). & (III) Construction /Up gradation 2 lane with paved shoulder from Design Km 95.55 (Bandarkoot ) to Km. 111.06 (Chattroo) of 15.52 Km length on Khellani – Kishtwar –Chattroo section on NH-244 in the Union Territory of Jammu & Kashmir on EPC mode (Pkg –V). Dated: 17-08-2021.
Technical Evaluation Result for Consultancy services as Authority’s Engineer for Supervision of “Upgradation to 2 lane with Paved shoulders of Tuivai – Keifang road, NH-102B of Aizawl – Imphal Economic Corridor from Existing Chainage Km 0.000 (Bridge across Tuivai River at Manipur Mizoram Border) to Km 119.108 (Near Keifang Village) [Design Chainage Km 0.000 to Km 98.579] (Package-I, II & III) in the State of Mizoram under Bharatmala Pariyojna on EPC mode”. Dated: 12-08-2021.
Technical Evaluation Result for Construction, Supply, Transportation, Installation, Testing and Commissioning of Steel Pontoons and Gangways using suitable Steel Enveloped HDPE / FRP floating material for providing floating Terminal facilities at various locations on NW – 2 (Brahmaputra River) on EPC mode. Dated: 16-08-2021.
Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for 2 laning with paved shoulder in the UT of Jammu & Kashmir and Ladakh.(Package 5: Khanabal- Baltal). Dated: 13-08-2021.
Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for 2 laning with paved shoulder in the UT of Jammu & Kashmir and Ladakh. (Package 4: Lamayuru-Leh). Dated: 13-08-2021.
Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for 2 laning with paved shoulder in the UT of Jammu & Kashmir and Ladakh. (Package 3: Kargil-Lamayuru). Dated: 13-08-2021.
Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for 2 laning with paved shoulder in the UT of Jammu & Kashmir and Ladakh. (Package 2: Minamarg-Kargil). Dated: 13-08-2021.
Revised Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of “Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Design Chainage 69+875 km to 121+769 Km (PKG-3) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode. Dated: 12-08-2021.
Technical Evaluation Result for Supply, Installation, Testing and Commissioning of 01No. Diesel Generator Set (30kVA, Single Phase) for NHIDCL, Regional Office at Itanagar. Dated: 11-08-2021.
Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for 2 laning with paved shoulder in the UT of Jammu & Kashmir and Ladakh. (Package 1: Srinagar-Minamarg). Dated: 10-08-2021.
Technical Evaluation Result for Repair & Maintenance of NH-37 Missa Army Area from Km 301.800 to Km 307.700 under Risk & Cost of the EPC Contractor.(Item Rate and Work Order Basis). Dated: 07-08-2021.
Technical Evaluation Result for Construction of New Two-Lane Bridge with its approaches from Km 0+000 to Km 4+385 across River Brahmaputra on NH-17 at Jogighopa in the State of Assam on EPC mode. Dated: 07-08-2021.
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of “Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Design Chainage 69+875 km to 121+769 Km (PKG-3) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode. Dated: 05-08-2021.
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: i) Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 3.275 km to 15.940 Km (Total length=12.665 Km) (PKG- 1) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode. (ii) Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 15.940 km to 33.120 Km (Total length=17.180 Km) (PKG-2) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode. (iii) Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 33.000 km to 66.390 Km (Existing Chainage from km 33.395 to km 67.496) (PKG-III) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode. (iv) Construction of 4-Lane Bridge over Irang River on Imphal- Jiribam road section (95.500Km) NH-37 (Old NH-53) in the State of Manipur on EPC mode. Dated: 03-08-2021.
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: Widening/Improvement to 4 (Four) Lane with Paved Shoulder of Daboka – Khatkhati stretch of NH-29 of Package 5 starting from Near Ganpath Gaur Gaon at Km 95+400 to Kwaram Taro village at Km 113+330 (Design KM 96+400 to Km 113+830) in the state of Assam on EPC mode. Dated: 02-08-2021.
Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF (I)Construction of Uni-Directional Khellani Tunnel of length 1.574 Km & its approach Road from Km 29.030 to Km 31.449 of total length of 2.419 Km on NH-244 in Union Territory of Jammu & Kashmir on EPC Mode. & (II) Construction & Upgradation to 2 lane with paved shoulder from Design Km. 31.449 (Khellani) (Ex. Km 44.946) to Km 51.700 (Prem Nagar) (Ex. Km 68+617) of 20.251 Km length on Khellani – Kishtwar – Chattroo section of NH-244 in the Union Territory of Jammu & Kashmir on EPC mode. & (III) Construction & Up gradation to 2 lane with paved shoulder from Design Km. 51.700 (Prem Nagar) to Km 66.535 (New Thathri) of 14.84 Km length on Khellani – Kishtwar –Chattroo section of NH-244 in the Union Territory of Jammu & Kashmir on EPC mode (Pkg –II). Dated: 29-07-2021.
Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF: (i) Construction of High Altitude Hill road from Tedadege TO Henkaer from KM 0.000 to KM 28.550 in West Siang District of the state of Arunachal Pradesh on EPC Mode. (ii) Construction of High Altitude Hill road from Doginala TO Gau from KM 0.000 to KM 15.320 in Upper Subansiri District of the state of Arunachal Pradesh on EPC Mode. Dated: 29-07-2021.
Technical Evaluation Result for CONSTRUCTION OF FOOT TRACK FROM LAMINO TO LONGCHU FROM KM 0.000 TO KM 60.514 IN EAST KAMENG IN THE STATE OF ARUNACHAL PRADESH ON ENGINEERING, PROCUREMENT AND CONSTRUCTION (THE “EPC”) MODE. Dated: 29-07-2021.
Technical Evaluation Result for Restoration & Rehabilitation of NH-129A of Maram-Peren Road (Old Alignment/Existing Alignment) from Km 93.00 to Km 107.200 [Total Length= 14.200 km] in the state of Manipur (2nd Call). Dated: 28-07-2021.
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 52.470 km to Ch.71.500 km (Design Ch.48.655 km to Ch.67.556 km) of TulungiaJogighopa Bridge Approach Section (Package-5) of Bilasipura- Guwahati road (NH-17) in the state of Assam under Bharatmala Pariyojana on EPC mode. (ii) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 88.000km to Ch.99.930 km (Design Ch.84.100km to Ch.96.000km) of the Sagunbashi forest (near Nichinta) Bypass to the starting of Krishnai Bypass Section (Package-7) of Bilasipura- Guwahati road (NH 17) in the state of Assam on EPC mode. Dated: 28-07-2021.
Technical Evaluation Result for CONSTRUCTION OF FOOT TRACK FROM GOILIANG VILLAGE – DUDHAKARU VIA GLOTONG LA FOR TOTAL LENGTH OF KM 15.500 TO KM 87.91 IN THE STATE OF ARUNACHAL PRADESH ON ENGINEERING, PROCUREMENT AND CONSTRUCTION (THE “EPC”) MODE. Dated: 27-07-2021.
Technical Evaluation Result for CONSTRUCTION OF FOOT TRACK FROM MIPI TO ANDRA LA OMKAR FROM KM 0.000 TO KM 35.100 IN ANINI DISTRICT OF THE STATE OF ARUNACHAL PRADESH ON EPC MODE. Dated: 22-07-2021.
Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for 2 lane road from Tetwal (Kashmir) to Drass (Ladakh) in the UT of Jammu & Kashmir and Ladakh. Dated: 22-07-2021.
Minutes of Financial Evaluation Committee for Empanelment of banks for implementing – Central land acquisition compensation fund management system.
Technical Evaluation Result for Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 126.775 to Km 146.208 (Length – 19.433 Km) in the state of Nagaland on EPC mode (Pkg – II) under NH(O) – TSP. Dated: 16-07-2021.
Technical Evaluation Result for Construction of two lane with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur from km 43.480 near Phelong Village to km 54.180 near Azuram Village (Length- 10.700 km) (Package-4) on EPC mode. (2nd Call). Dated: 16-07-2021.
Technical Evaluation Result for Construction of two lane with paved shoulders road from Tameglong to Mahur (NH-137) in the State of Manipur from km 0.000 at Tamenglong to km 10.000 near Dialong (Length- 10.000 km) (Package-1) on EPC mode. (2nd Call). Dated: 16-07-2021.
Technical Evaluation Result for CONSTRUCTION OF FOOT TRACK FROM TUNGRI TO SAMCHUNG FROM KM 0.000 TO KM 29.546 IN EAST KAMENG IN THE STATE OF ARUNACHAL PRADESH ON ENGINEERING, PROCUREMENT AND CONSTRUCTION (THE “EPC”) MODE. Dated: 16-07-2021.
Technical Evaluation Result for Restoration and Repairs of NH-244 from Goha (km 0.000) to Khellani (km 29.800) [Total length = 28.185 km] in the UT of Jammu & Kashmir in the FY 2021-22. Dated: 15-07-2021.
Technical Evaluation Result for Construction of two lane with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur from km 43.480 near Phelong Village to km 54.180 near Azuram Village (Length- 10.700 km) (Package-4) on EPC mode. (2nd Call). Dated: 14-07-2021.
Technical Evaluation Result for Construction & Upgradation to 2 lane with paved shoulder from Design Km. 51.700 (Prem Nagar) to Km 66.535 (New Thathri) of 14.84 Km length on Khellani – Kishtwar –Chattroo section of NH-244 in the Union Territory of Jammu & Kashmir on EPC mode (Pkg –II).-3rd call. Dated: 14-07-2021.
Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 33.000 km to 66.390 Km (Existing Chainage from km 33.395 to km 67.496) (PKG-III) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode. Dated: 13-07-2021.
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 51+246to Km 66+000 (Design Chainage 50+710 to 65+923) of Parokhuwa – Dokmoka Section(Package 2) of NH 29 in the state of Assam on EPC mode. Dated: 13-07-2021.
Technical Evaluation Result for Construction /Up gradation 2 lane with paved shoulder from Design Km 95.55 (Bandarkoot ) to Km. 111.06 (Chattroo) of 15.52 Km length on Khellani – Kishtwar – Chattroo section on NH-244 in the Union Territory of Jammu & Kashmir on EPC mode (Pkg –V).2 nd call. Dated: 08-07-2021.
Technical Evaluation Result for Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Design Chainage 69+875 km to 121+769 Km (PKG-3) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode. Dated: 09-07-2021.
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: i) Improvement of existing road to 2 laning with Hard Shoulders of Maram- Peren section (Package-IA, length- 22.340 Km) from Design Chainage 0.000 km to 22.340 Km on NH-129A in the State of Manipur on EPC Mode. (ii) Improvement of existing road to 2 laning with Hard Shoulders of Maram- Peren section (Package-IB, length- 17.660 Km) from Design Chainage 22.340 Km to Km 40.000 on NH-129A in the State of Manipur on EPC mode. (iii) Improvement of existing road to 2 laning with Hard Shoulders of 2 laning of Maram-Peren section (Package-IIA, length- 16.840 Km) from Design Chainage 40.000 km to 56.840 Km on NH-129A in the State of Manipur on EPC mode. (iv) Improvement of existing road to 2 laning with Hard Shoulders of 2 laning of Maram- Peren section (Package-IIB, length- 18.160 Km) from Design Chainage 56.840 km to km 75.000 on NH-129A in the State of Manipur on EPC mode. Dated: 09-07-2021.
Technical Evaluation Result for Construction of Two-Lane with hard shoulders of Merangkong Tamlu Mon road (Wakching Town portion) on EPC basis from existing Km 59+000 to Km 73+640 [Design Km. 59+000 to Km. 72+450] (Design Length – 13.450 Km)(Package V) in the state of Nagaland under SARDP NH(O) – NE under EPC mode. Dated: 09-07-2021.
Technical Evaluation Result for Empanelment of banks for implementing – Central land acquisition compensation fund management system. Dated: 08-07-2021.
Technical Evaluation Result for Construction of two lane with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur from km 10.000 near Dialong Village to km 31.430 near Barak River (Length – 21.43 km) (Package-2) on EPC mode. (2nd Call). Dated: 08-07-2021.
Technical Evaluation Result for Restoration & Rehabilitation of NH-37 of Imphal-Jiribam Road from Km 75.00 to Km 145.00 in the state of Manipur on Item Rate Basis in the FY 2021-22 (2nd Call). Dated: 06-07-2021.
Technical Evaluation Result for Restoration & Rehabilitation of NH-37 of Imphal-Jiribam Road from Km 3.00 to Km 75.00 in the state of Manipur on Item Rate Basis in the FY 2021-22 (2nd Call). Dated: 06-07-2021.
Technical Evaluation Result for Balance work for Four-laning of NH-39 Dimapur — Kohima Road from Design Km 152.490 to Km 166.700 (Existing Km 156.000 to Km 172.900), in the state of Nagaland under SARDP-NE through an Engineering, Procurement and Construction (EPC) Contract (Package-III). Dated: 06-07-2021.
Technical Evaluation Result for Construction/Upgradation of Existing road to 2 lane with paved shoulder including Geometric Improvement from Ranipool to Pakyong from km 2.000 to km 16.167 (Balance Work) of NH-717-A on EPC basis under SARDP-NE Phase ‘A’. Dated: 05-07-2021.
Technical Evaluation Result for Improvement of existing road to 2 laning with Hard Shoulders of 2 laning of Maram-Peren section (Package-IIA, length- 16.840 Km) from Design Chainage 40.000 km to 56.840 Km on NH-129A in the State of Manipur on EPC mode. Dated: 02-07-2021.
Technical Evaluation Result for Consultancy services as Authority’s Engineer for Supervision of “Up-gradation to 2 lane with paved shoulders of Dulte – Champhai road (International Corridor) of NH-6 from Design Chainage Km 54.400 to km 111.580 (Package-I, II & III) in the State of Mizoram under Bharatmala Pariyojna on EPC mode. Dated: 02-07-2021.
Technical Evaluation Result for Supply of Pantry Items at National Highways & Infrastructure Development Corporation Ltd (NHIDCL) HQ at its office at PTI Building, Jeevan Tara Building, New Delhi and any other office space in Delhi/New Delhi. Dated: 01-07-2021.
Technical Evaluation Result for Development of Inland Water Transport (IWT) Terminal at MMLP Jogighopa, Assam on EPC mode. Dated: 01-07-2021.
Technical Evaluation Result for Consultancy services as Authority’s Engineer for Supervision of “Construction of 2 laning with hard shoulder configuration of Lunglei – Chhumkhum – Tlabung road of NH-302 from Design Chainage Km 0.000 to km 74.950 (Package- A & B) in the State of Mizoram under Bharatmala Pariyojna on EPC mode”. Dated: 01-07-2021.
Technical Evaluation Result for Construction of Kishtwar bypass with 2 lane with paved shoulder from Design Km. 80.675 (Dulhasti) to Km 95.550 (bandarkoot ) of 14.88 Km length on Khellani – Kishtwar –Chattroo section and a link road to Kishtwar town of 1.871 km on NH- 244 in the Union Territory of Jammu & Kashmir on EPC mode (Pkg –IV).-2nd call. Dated: 30-06-2021.
Technical Evaluation Result for CONSTRUCTION OF BALANCE WORK OF 2 LANING OF AKAJAN-LIKABALI-BAME ROAD ON EPC BASIS FROM DESIGN KM 33.00 TO KM 65.810 (EXISTING KM 36.00 TO KM 71.00) IN THE STATE OF ARUNACHAL PRADESH UNDER SARDP-NE). Dated: 28-06-2021.
Technical Evaluation Result for Construction of Two Major bridges at Existing Ch. 23+650 (designed Ch. 23+550) and Ch. 28+200 (designed Ch. 28+200) of bridge span 160 m along the Existing Hunli-Anini Road from Km 21.500 to Km 37.500 in the State of Arunachal Pradesh on EPC Mode under SARDP-2 nd call. Dated: 22-06-2021.
Technical Evaluation Result for Special Repair of NH-329A from Sangtamtilla to Pimla Junction Section (Km 38.000 to Km 70.270) [Total Length: 32.270] in the State of Nagaland in the FY 2021-22. Dated: 18-06-2021.
Technical Evaluation Result for Construction of North East Regional Office of National Highways & Infrastructure Development Corporation Ltd. at Guwahati, Assam on EPC mode. Dated: 16-06-2021.
Technical Evaluation Result for CONSTRUCTION OF FOOT TRACK FROM MIPI TO ANDRA LA OMKAR FROM KM 0.000 TO KM 35.100 IN ANINI DISTRICT OF THE STATE OF ARUNACHAL PRADESH ON EPC MODE. Dated: 11-06-2021.
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: (i) Construction of two lane with paved shoulders road of Tamenglong to Muhur in the state of Manipur from km 0.000 at Tamenglong to km 10.000 near Dialong (Length-10.00km) (PKG-1) on EPC mode. (ii) Construction of two lane with paved shoulders road of Tamenglong Mahur section in the state of Manipur from km 10.000 at Dialong to km 20.500 near Old Tamenglong (Length10.5km) (PKG-2) on EPC mode. (iii) Construction of two lane with paved shoulders road of Tamenglong Mahur section in the state of Manipur from km 20.500 at Old Tamenglong to km 30.800 ending near Phelong (Length-10.3km) (PKG-3) on EPC mode. (iv) Construction of two lane with paved shoulders road of Tamenglong Mahur section in the state of Manipur from km 30.800 at Phelong to km 41.450 ending near Azuram (Length10. 65km) (PKG-4) on EPC mode. Dated: 10-06-2021.
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of i) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 146.208 to Km 163.592 (Length – 17.384 Km) in the state of Nagaland on EPC mode (Pkg – III) under NH(O) – TSP (ii) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 163.592 to Km 173.850 (Length – 10.258 Km) in the state of Nagaland on EPC mode (Pkg – IV) under NH (O) – TSP (iii) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 173.850 to Km 190.850 (Length – 17.00 Km) in the state of Nagaland on EPC mode (Pkg – V) under NH(O) – TSP. Dated: 01-06-2021.
Technical Evaluation Result for Special Repair of NH-702, from Mon to Tizit Stretch (from Km 133.00 to Km 177.00) [Total Length = 44.00 Km] in the State of Nagaland for the FY 2021-22. Dated: 01-06-2021.
Technical Evaluation Result for Selection of agency/ agencies for entering into Annual Rate Contract for providing services of Designing, Printing of document(s) etc., for NHIDCL, New Delhi. Dated: 31-05-2021.
Technical Evaluation Result for Restoration of existing road from km 76.350 to km 79.700 of NH-717A(i.e. start of Pedong Bypass to Reshi Border) in the State of West Bengal on EPC Mode. Dated: 31-05-2021.
Technical Evaluation Result for REPAIR AND MAINTAINANCE OF ROAD FROM ARROWA TRI- JUNCTION (RAMMANDIR) TO TIDDING OF NH-113 IN THE STATE OF ARUNACHAL PRADESH. Dated: 27-05-2021.
Technical Evaluation Result for Procurement of 200Nos. D-Type (46.7L) Medical Oxygen Cylinders with valve and cap for NHIDCL RO-Itanagar. Dated: 24-05-2021.
Technical Evaluation Result for Maintenance & Repair work of Ranipool to Pakyong stretch from km 2.000 to km 6.000 at NH-717A on Percentage Rate Contract in the state of Sikkim for FY 2021-22. Dated: 19-05-2021.
Technical Evaluation Result for strengthening works on NH-10 from km. 52.000 to Km 80.000 on Item Rate Contract Basis in the state of Sikkim for FY 2021-22. Dated: 17-05-2021.
Technical Evaluation Result for Restoration and Repairs of NH-39 (new NH-29) from existing Dimapur-Kohima road (Km 156.000 to Km 172.900) [Length=16.90 Km] in the State of Nagaland in the FY 2021-22 – 2nd Call. Dated: 19-05-2021.
Technical Evaluation Result for Strengthening from: Km 912.348 to Km 912.780, Km 916.000 to Km 928.000, Km 938.000 to Km 945.400, Km 946.500 to Km 947.300 & Km 947.700 to Km 948.000 of Bilasipara-Tulungia of NH-31 (New NH-17) in the State of Assam in FY 21-22. Dated: 14-05-2021.
Technical Evaluation Result for Strengthening from: Km 6.180 to Km 7.380 & Km 18.835 to Km 30.675 (Length=13.130 Km) and Km 30.765 to Km 42.000 (Length=11.235) of Bilasipara to Guwahati Section of NH-17 (Old NH-37) in the State of Assam in FY 21-22. Dated: 14-05-2021.
Technical Evaluation Result for Strengthening of the Section from Km 40.300 to Km 42.000 of SilcharVaringte, NH-306 in FY 21-22: Second Call. Dated: 13-05-2021.
Technical Evaluation Result for Construction of Two Major bridges at Existing Ch. 23+650 (designed Ch. 23+550) and Ch. 28+200 (designed Ch. 28+200) of bridge span 160 m along the Existing Hunli-Anini Road from Km 21.500 to Km 37.500 in the State of Arunachal Pradesh on EPC Mode under SARDP. Dated: 13-05-2021.
Technical Evaluation Result for Detailed survey of NH-4 from Km 0.00 to Km 330.7 using Network Survey Vehicle (NSV) in the Union Territory of Andaman & Nicobar Islands; 4th Call. Dated: 05-05-2021.
Technical Evaluation Result for Vegetation Clearance, Drain Clearance with Pot Patch Repair Work including Protection works in Financial Year 2021 on NH10 (From KM 52 to KM 80) in the state of Sikkim on Percentage Contract Basis. Dated: 04-05-2021.
Technical Evaluation Result for Notice Inviting Bid for Lease of Office Premises of NHIDCL, Project Monitoring Unit – Silchar (Assam). Dated: 17-04-2021.
Technical Evaluation Result for Maintenance & Repair work of Ranipool to Pakyong stretch from km 2.000 to km 6.000 at NH-717A in the state of Sikkim for FY 2021-22. Dated: 27-04-2021.
Technical Evaluation Result for Re-construction of Structures viz. compound wall, Guard Posts and Transformer Platform in Doordarshan Campus, Paloura, in Jammu-Akhnoor road section of NH-144A, in the UT of Jammu & Kashmir. Dated: 27-04-2021.
Technical Evaluation Result for Selection of Manpower Placement Agency for providing services of Outsourced manpower on monthly basis for NHIDCL at Regional Office- Port Blair, its PMUs and site offices in the Union Territory of Andaman & Nicobar Islands-4th Call. Dated: 26-04-2021.
Technical Evaluation Result for Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 126.775 to Km 146.208 (Length – 19.433 Km) in the state of Nagaland on EPC mode (Pkg – II) under NH(O) – TSP. Dated: 16-04-2021.
Technical Evaluation Result for Notice Inviting Bid for Lease of Office Premises of NHIDCL, Project Monitoring Unit – Bongaigaon (Assam) – 3rd Call. Dated: 16-04-2021.
Technical Evaluation Result for Notice Inviting Bid for Lease of Office Premises of NHIDCL, Project Monitoring Unit – Silchar (Assam). Dated: 15-04-2021.
Technical Evaluation Result for Balance work for Four-laning of NH-39 Dimapur — Kohima Road from Design Km 152.490 to Km 166.700 (Existing Km 156.000 to Km 172.900), in the state of Nagaland under SARDP-NE through an Engineering, Procurement and Construction(EPC) Contract (Package-III). Dated: 13-04-2021.
Technical Evaluation Result for Restoration and Repairs from km 184.000 to km 203.000 in Kishtwar-Sinthanpass of NH-244 [Total length = 19.00 km] in the UT of Jammu & Kashmir in the FY 2021-22. Dated: 12-04-2021.
Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF: (i) Construction of High Altitude Hill road from Dembuen TO Bruni from KM 0.000 to KM 36.300 in Anini District of the state of Arunachal Pradesh on EPC Mode. (ii) Construction of High Altitude Hill road from Mipi TO Mathun (Basam) from KM 0.000 to KM 16.730 in Anini District of the state of Arunachal Pradesh on EPC Mode. Dated: 08-04-2021.
Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF “Construction of High Altitude Hill road from Ladda (Graziang) TO Basai from KM 0.000 to KM 35.260 in East Kameng District of the state of Arunachal Pradesh on EPC Mode”. Dated: 08-04-2021.
Technical Evaluation Result for Rehabilitation of section from Km 298.00 to Km 330.662 (Karala to Kalipur) of NH-04 to Intermediate lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands (Total Length 32.662 km) on EPC Mode (Package- VIII) (Re-tender). Dated: 07-04-2021.
Technical Evaluation Result for Hiring of Machine/Labour etc for clearance of landslides in Rainy Season 2020 on NH-10 from Km 52 to Km 66, Km 66 to Km 80, Indira Bypass 0.00 to Km 10.117, Sirwani Km 0.00 to Dalep Km 2.30 for Project Monitoring Unit(PMU) at Ranipool in the state of Sikkim for Year 2021-20 nd call. Dated: 05-04-2021.
Technical Evaluation Result for Construction & Upgradation to 2 lane with paved shoulder from Design Km. 51.700 (Prem Nagar) to Km 66.535 (New Thathri) of 14.84 Km length on Khellani – Kishtwar –Chattroo section of NH-244 in the Union Territory of Jammu & Kashmir on EPC mode (Pkg –II). Dated: 30-03-2021.
Technical Evaluation Result for Notice Inviting Bid for Lease of Office Premises of NHIDCL, Project Monitoring Unit – Bongaigaon (Assam)- 2nd Call. Dated: 30-03-2021.
Technical Evaluation Result for Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Design Chainage 69+875 km to 88+980 Km (PKG-3A) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode. Dated: 28-03-2021.
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 88.000km to Ch.99.930 km (Design Ch.84.100km to Ch.96.000km) of the Sagunbashi forest (near Nichinta) Bypass to the starting of Krishnai Bypass Section (Package-7) of Bilasipura- Guwahati road (NH 17) in the state of Assam on EPC mode. Dated: 28-03-2021.
Technical Evaluation Result for Construction of Kishtwar bypass with 2 lane with paved shoulder from Design Km. 80.675 (Dulhasti) to Km 95.550 (bandarkoot ) of 14.88 Km length on Khellani – Kishtwar –Chattroo section and a link road to Kishtwar town of 1.871 km on NH244 in the Union Territory of Jammu & Kashmir on EPC mode (Pkg –IV). Dated: 28-03-2021.
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder of Daboka – Khatkhati stretch of NH-29 of Package 5 starting from Near Ganpath Gaur Gaon at Km 95+400 to Kwaram Taro village at Km 113+330 (Design KM 96+400 to Km 113+830) in the state of Assam on EPC mode. Dated: 28-03-2021.
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 131+500 to Km 146+250 (Design Chainage 131+152 to 145+712) of Manja – Dillai Section (Package-7) of NH 29 in the state of Assam on EPC mode. Dated: 28-03-2021.
Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 3.275 km to 15.940 Km (Total length=12.665 Km) (PKG-1) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode. Dated: 28-03-2021.
Technical Evaluation Result for Construction of two lane with paved shoulders road from Tamenglong to Mahur in the state of Manipur from km 10.000 near Dialong Village to km 21.900 near Old Tamenglong Village (Length- 11.90 km) (Package-2A) on EPC mode. Dated: 28-03-2021.
Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 66.110 km to 83.800 Km (Total length= 17.69 Km) (PKG-5) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode. Dated: 28-03-2021.
Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 33.120 km to 49.140 Km (Total length=16.02 Km) (PKG-3) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode. Dated: 28-03-2021.
Technical Evaluation Result for CONSTRUCTION OF BALANCE WORK OF TWO – LANE WITH HARD SHOULDERS OF EXISTING HAYULIANG – HAWAI ROAD (NH-113) FROM DESIGN KM 51.825 TO KM 63.131 (EXISTING KM 45.050 OF HAYULIANG – HAWAI ROAD TO HAWAI TOWN)(11.306 KM) ON EPC BASIS IN THE STATE OF ARUNACHAL PRADESH PACKAGE OF SARDP – NE(GREEN FIELD ALIGNMENT). Dated: 28-03-2021.
Revised Technical Evaluation Result-II for Up-gradation to 2 lane with paved shoulders of Dulte – Champhai road (International Corridor) of NH-6 from Design Chainage Km 84.800 to km 111.580 (Package-III) in the State of Mizoram under Bharatmala Pariyojna on EPC mode. Dated: 27-03-2021.
Revised Technical Evaluation Result-II for Rehabilitation and Up-gradation to 2 lane with paved shoulders of Dulte – Champhai road (International Corridor) of NH-6 from Design Chainage Km 72.350 to Km 84.800 (Package-II) in the State of Mizoram under Bharatmala Pariyojna on EPC mode. Dated: 27-03-2021.
Revised Technical Evaluation Result-II for Up-gradation to 2 lane with paved shoulders of Dulte – Champhai road (International Corridor) of NH-6 from Design Chainage Km 54.400 to km 72.350 (Package-I) in the State of Mizoram under Bharatmala Pariyojna on EPC mode. Dated: 27-03-2021.
Revised Technical Evaluation Result-II for Widening/Up-Gradation to 2 lane with Paved shoulder of NH-301 KargilZanskar Road from Design km 196.250 (Existing km 194.790) to Design km 230.020 (Existing km 231.692) in the UT of Ladakh on EPC mode (Package-VIII). Dated: 27-03-2021.
Revised Technical Evaluation Result for Widening/Up-Gradation to 2 lane with Paved shoulder of NH-301 KargilZanskar Road from Design km 196.250 (Existing km 194.790) to Design km 230.020 (Existing km 231.692) in the UT of Ladakh on EPC mode (Package-VIII). Dated: 26-03-2021.
Revised Technical Evaluation Result for Widening/Up-Gradation to 2 lane with Paved shoulder of NH301 Kargil-Zanskar Road from Design km 57.000 (Existing km 57.905) to Design km 87.000 (Existing km 88.249) in the UT of Ladakh on EPC mode (Package-III). Dated: 26-03-2021.
Revised Technical Evaluation Result for Widening/Up-Gradation to 2 lane with Paved shoulder of NH301 Kargil-Zanskar Road from Design km 30.040 (Existing km 30.000) to Design km 57.000 (Existing km 57.905) in the UT of Ladakh on EPC mode (Package-II). Dated: 26-03-2021.
Revised Technical Evaluation Result for Widening/Up-Gradation to 2 lane with Paved shoulder of NH301 Kargil-Zanskar Road from Design km 0.000 (Existing km 0.000) to Design km 30.040 (Existing km 30.000) in the UT of Ladakh on EPC mode (Package-I). Dated: 26-03-2021.
Revised Technical Evaluation Result for Construction of 2-laning with hard shoulder configuration of Chhumkhum to Tlabung from Design Chainage Km 37.420 to Km 74.950 [Pkg-B] for Lunglei-Tlabung section of NH-302 in the State of Mizoram under ‘Bharatmala Pariyojana’ on EPC Mode. Dated: 26-03-2021.
Revised Technical Evaluation Result for Construction of 2-laning with hard shoulder configuration of Lunglei to Chhumkhum from Design Chainage Km 0.000 (Hrangchalkawn) to Km 37.420 [Pkg-A] for Lunglei-Tlabung section of NH-302 in the State of Mizoram under ‘Bharatmala Pariyojana’ on EPC Mode. Dated: 26-03-2021.
Revised Technical Evaluation Result for Up-gradation to 2 lane with paved shoulders of Dulte – Champhai road (International Corridor) of NH-6 from Design Chainage Km 84.800 to km 111.580 (Package-III) in the State of Mizoram under Bharatmala Pariyojna on EPC mode. Dated: 26-03-2021.
Revised Technical Evaluation Result for Rehabilitation and Up-gradation to 2 lane with paved shoulders of Dulte – Champhai road (International Corridor) of NH-6 from Design Chainage Km 72.350 to Km 84.800 (Package-II) in the State of Mizoram under Bharatmala Pariyojna on EPC mode. Dated: 26-03-2021.
Revised Technical Evaluation Result for Up-gradation to 2 lane with paved shoulders of Dulte – Champhai road (International Corridor) of NH-6 from Design Chainage Km 54.400 to km 72.350 (Package-I) in the State of Mizoram under Bharatmala Pariyojna on EPC mode. Dated: 26-03-2021.
Technical Evaluation Result for Construction & Upgradation to 2 lane with paved shoulder from Design Km. 67.805 (at the end of Km 83rd tunnel near Dhrabshala) to Km 80.675 (Dulhasti) of 12.87 Km length on Khellani – Kishtwar –Chattroo section of NH-244 in the Union Territory of Jammu & Kashmir on EPC mode (Pkg –III). Dated: 26-03-2021.
Technical Evaluation Result for Improvement/ Up-gradation of existing 2-Lane road to 4-Lane Divided Highway from Sekmai to Nilkhuthi section (Pkg-5B) of Imphal Kohima Road (Design Chainage from Km 297+700 to Km 308+460) of NH-39 in the state of Manipur on EPC Mode. Dated: 26-03-2021.
Technical Evaluation Result for Construction /Up gradation 2 lane with paved shoulder from Design Km 95.55 (Bandarkoot ) to Km. 111.08 (Chattroo) of 15.54 Km length on Khellani – Kishtwar – Chattroo section on NH-244 in the Union Territory of Jammu & Kashmir on EPC mode (Pkg –V). Dated: 25-03-2021.
Technical Evaluation Result for Construction of 2-laning with hard shoulder configuration of Chhumkhum to Tlabung from Design Chainage Km 37.420 to Km 74.950 [Pkg-B] for Lunglei-Tlabung section of NH-302 in the State of Mizoram under ‘Bharatmala Pariyojana’ on EPC Mode. Dated: 25-03-2021.
Technical Evaluation Result for construction of 2-laning with hard shoulder configuration of Lunglei to Chhumkhum from Design Chainage Km 0.000 (Hrangchalkawn) to Km 37.420 [Pkg-A] for Lunglei-Tlabung section of NH-302 in the State of Mizoram under ‘Bharatmala Pariyojana’ on EPC Mode. Dated: 25-03-2021.
Technical Evaluation Result for Construction of two lane with paved shoulders road of Tamenglong Mahur section in the state of Manipur from km 20.500 at Old Tamenglong to km 30.800 ending near Phelong (Length-10.3km) (PKG-3) on EPC mode. Dated: 25-03-2021.
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 113+300 to km 131+500 (Design Chainage 113+830 to 131+152) of Kwaram Taro Village – Manja Section – (Package- 6) of NH-29 in the state of Assam under Bharatmala Pariyojana on EPC mode. Dated: 25-03-2021.
Technical Evaluation Result for Up-gradation to 2 lane with paved shoulders of Dulte – Champhai road (International Corridor) of NH-6 from Design Chainage Km 84.800 to km 111.580 (Package-III) in the State of Mizoram under Bharatmala Pariyojna on EPC mode. Dated: 25-03-2021.
Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 15.940 km to 33.120 Km (Total length=17.180 Km) (PKG-2) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode. Dated: 24-03-2021.
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 51+246to Km 66+000 (Design Chainage 50+710 to 65+923) of Parokhuwa – Dokmoka Section (Package 2) of NH 29 in the state of Assam on EPC mode. Dated: 24-03-2021.
Technical Evaluation Result for Widening/Up-Gradation to 2 lane with Paved shoulder of NH301 Kargil-Zanskar Road from Design km 0.000 (Existing km 0.000) to Design km 30.040 (Existing km 30.000) in the UT of Ladakh on EPC mode (Package-I). Dated: 24-03-2021.
Technical Evaluation Result for Widening/Up-Gradation to 2 lane with Paved shoulder of NH-301 KargilZanskar Road from Design km 196.250 (Existing km 194.790) to Design km 230.020 (Existing km 231.692) in the UT of Ladakh on EPC mode (Package-VIII). Dated: 24-03-2021.
Technical Evaluation Result for Widening/Up-Gradation to 2 lane with Paved shoulder of NH301 Kargil-Zanskar Road from Design km 57.000 (Existing km 57.905) to Design km 87.000 (Existing km 88.249) in the UT of Ladakh on EPC mode (Package-III). Dated: 24-03-2021.
Technical Evaluation Result for Widening/Up-Gradation to 2 lane with Paved shoulder of NH301 Kargil-Zanskar Road from Design km 30.040 (Existing km 30.000) to Design km 57.000 (Existing km 57.905) in the UT of Ladakh on EPC mode (Package-II). Dated: 24-03-2021.
Technical Evaluation Result for Construction of Two-Lane with hard shoulders of Merangkong Tamlu Mon road (Wakching Town portion) on EPC basis from existing Km 59+000 to Km 73+640 [Design Km. 59+000 to Km. 72+450] (Design Length – 13.450 Km)(Package V) in the state of Nagaland under SARDP-NE Phase A on EPC Mode. Dated: 24-03-2021.
Technical Evaluation Result for Up-gradation to 2 lane with paved shoulders of Dulte – Champhai road (International Corridor) of NH-6 from Design Chainage Km 54.400 to km 72.350 (Package-I) in the State of Mizoram under Bharatmala Pariyojna on EPC mode. Dated: 24-03-2021.
Technical Evaluation Result for Rehabilitation and Up-gradation to 2 lane with paved shoulders of Dulte – Champhai road (International Corridor) of NH-6 from Design Chainage Km 72.350 to Km 84.800 (Package-II) in the State of Mizoram under Bharatmala Pariyojna on EPC mode. Dated: 24-03-2021.
Technical Evaluation Result for Construction of New 2-Lane bypass from Design km 176+532(Existing km 263+070) (Donipawa) on NH-244 to Design Km 185+002 (Near Khudwani on NH-44 at existing km 238+500)(Alstop) Via Ashajipora of 8.470km length i.e. to connecting NH-244 & NH-44 in the Union Territory of Jammu & Kashmir on EPC mode. (Pkg–VII). Dated: 24-03-2021.
Technical Evaluation Result for Strengthening of entrusted section of NH 208 from (Kalyanpur) to (Khowai Chowmuhuni, Teliamura) (Km. 124.000 to Km. 139.600) [Total Length 15.600 Km.] in the State of Tripura in the FY 2021-22. Dated: 24-03-2021.
Technical Evaluation Result for Improvement and Widening to two lane with paved shoulder of Manu – Simlung section of NH-44A starting near Vaghmun at km 66.845 and ending near Simlung at km 85.125(Length-18.28km) in the state of Tripura on Engineering, Procurement & Construction (EPC) mode – Package-IV. Dated: 24-03-2021.
Technical Evaluation Result for Improvement/widening to two-lanning of stretch from km 55.525 to km 79.680 of Ranikhor- Baghmara Project in the state of Meghalaya under “SARDP-NE” Phase-A on EPC mode (Package-III). Dated: 23-03-2021.
Technical Evaluation Result for Strengthening of entrusted section of NH 208 from (Khowai) to (Kalyanpur) (Km. 108.600 to Km. 124.000) [Total Length 15.400 Km.] in the State of Tripura in the FY 2021-22. Dated: 22-03-2021.
Technical Evaluation Result for Construction of High Altitude Hill road from Ladda (Graziang) TO Basai from KM 0.000 to KM 35.260 in East Kameng District of the state of Arunachal Pradesh on EPC Mode. Dated: 19-03-2021.
Technical Evaluation Result for Construction of two lane with paved shoulders road of Tamenglong Mahur section in the state of Manipur from km 30.800 at Phelong to km 41.450 ending near Azuram (Length10. 65km) (PKG-4) on EPC mode. Dated: 19-03-2021.
Technical Evaluation Result for Strengthening of entrusted section of NH 208 from (Amarpur TSR Camp) to (Jatanbari) (Km. 194.400 to Km. 208.800) [Total Length 14.400 Km.] in the State of Tripura in the FY 2021-22. Dated: 18-03-2021.
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 52.470 km to Ch.71.500 km (Design Ch.48.655 km to Ch.67.556 km) of Tulungia- Jogighopa Bridge Approach Section (Package-5) of Bilasipura- Guwahati road (NH-17) in the state of Assam under Bharatmala Pariyojana on EPC mode. Dated: 18-03-2021.
Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF “Improvement of existing road to 2 laning with Hard Shoulders of Maram- Peren section on NH-129A in the State of Manipur on EPC Mode for following pkgs.: (i) (Package-IA, length- 22.340 Km) from Design Chainage 0.000 km to km 22.340 (ii) (Package-IB, length- 17.660 Km) from Design Chainage 22.340 Km to Km 40.000 (iii) (Package-IIA, length- 16.840 Km) from Design Chainage 40.000 km to 56.840 Km (iv) (Package-IIB, length- 18.160 Km) from Design Chainage 56.840 km to km 75.000 (v) (Package-3A, length- 12.35 Km) from Design Chainage 75.000 km to 87.350 Km (vi) (Package-3B, length- 22.144 Km) from Design Chainage 87.350 km to 109.494 Km. Dated: 18-03-2021.
Technical Evaluation Result for Construction of two lane with paved shoulders road of Tamenglong to Muhur in the state of Manipur from km 0.000 at Tamenglong to km 10.000 near Dialong (Length-10.00km) (PKG-1) on EPC mode. Dated: 17-03-2021.
Technical Evaluation Result for Widening and Improvement of Imphal-Moreh section of NH-39 from Km 406.000 to Km 425.411 to Two (2) lane with paved shoulders configuration in the State of Manipur (Package-IV) on Engineering, Procurement & Construction (EPC) mode. Dated: 17-03-2021.
Technical Evaluation Result for Widening and Improvement of Imphal-Moreh section of NH- 39 from Km 395.680 to Km 406.000 to Two (2) lane with paved shoulders configuration in the State of Manipur (Package-III) on Engineering, Procurement & Construction (EPC) mode. Dated: 17-03-2021.
Technical Evaluation Result for Appointment of Financial Consultancy Services for Agartala to Sabroom section of NH-08 from CH 6.8 Km to 128.712 Km including Feni Bridge at international border of India and Bangladesh in the state of Tripura undertaken by NHIDCL on OMT basis. Dated: 16-03-2021.
Technical Evaluation Result for Shifting of 33KV, 11 KV and LT line on Jammu-Akhnoor section of NH-144 A in the UT of Jammu & Kashmir. Dated: 16-03-2021.
Technical Evaluation Result for Construction & Upgradation to 2 lane with paved shoulder from Design Km. 51.700 (Prem Nagar) to Km 66.535 (New Thathri) of 14.84 Km length on Khellani – Kishtwar –Chattroo section of NH-244 in the Union Territory of Jammu & Kashmir on EPC mode (Pkg –II). Dated: 15-03-2021.
Technical Evaluation Result for Selection of Manpower Placement Agency for providing services of Outsourced manpower on monthly basis for NHIDCL at Regional Office- Port Blair, its PMUs and site offices in the Union Territory of Andaman & Nicobar Islands-3rd Call. Dated: 12-03-2021.
Technical Evaluation Result for Detailed survey of NH-4 from Km 0.00 to Km 330.7 using Network Survey Vehicle (NSV) in the Union Territory of Andaman & Nicobar Islands- 3rd Call. Dated: 12-03-2021.
Technical Evaluation Result for Construction of various RCC infrastructure works for Ladakh Police in the Union Territory of Ladakh. Dated: 12-03-2021.
Technical Evaluation Result for Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 163.592 to Km 173.850 (Length – 10.258 Km) in the state of Nagaland on EPC mode (Pkg – IV) under NH (O) – TSP. Dated: 11-03-2021.
Technical Evaluation Result for CONSTRUCTION OF HIGH ALTITUDE HILL ROAD FROM TAKSING TO GHORA FROM KM 0.000 TO KM 7.090 IN UPPER SUBANSIRI DISTRICT OF THE STATE OF ARUNACHAL PRADESH ON EPC MODE. Dated: 09-03-2021.
Technical Evaluation Result for Reconstruction of 94 Nos. of culverts in the stretch from Km 298.00 to km 330.662 (Karala to Kalipur) of NH-04 in the Union Territory of Andaman & Nicobar Islands on EPC Mode. Dated: 05-03-2021.
Technical Evaluation Result for Consultancy Services for planning and design of various infrastructures work located at Leh and Kargil for Social Tribal Welfare Department in the Union territory of Ladakh. Dated: 05-03-2021.
Technical Evaluation Result for Construction and upgradation of existing road to 2-lane with paved shoulder from Km 37+600 (New Rolep bridge) to Km 52+000 (Chochenpheri) of Rhenok-Menla spur (NH717B) Package-IIC on EPC basis under SARDP-NE Phase ‘A’ in the State of Sikkim.- (2nd Call). Dated: 03-03-2021.
Technical Evaluation Result for Ordinary Repairs of NH-4 from Ch 21+000 km to Ch 28+000 km in the Union Territory of Andaman and Nicobar Islands in the year 2020-21-6th Call. Dated: 19-02-2021.
Technical Evaluation Result for Purchase of 15 KVA DG set with installation for Project Monitoring Unit- Rhenock in State of Sikkim on e-tendering mode. Dated: 16-02-2021.
Technical Evaluation Result for Detailed survey of various roads using Network Survey Vehicle (NSV) in the UT of Ladakh. Dated: 17-02-2021.
Technical Evaluation Result for Consultancy Services for Preparation of Inception Report & Detailed Project Report (DPR) for Development of Multi Modal Logistics Park at Silchar in the State of Assam under Bharatmala Pariyojana. Dated: 15-02-2021.
Technical Evaluation Result for Improvement of existing road to 2 laning with Hard Shoulders of 2 laning of Maram- Peren section (Package-IIB , length- 18.160 Km) from Design Chainage 56.840 km to km 75.000 on NH-129A in the State of Manipur on EPC mode. Dated: 10-02-2021.
Technical Evaluation Result for Construction of Uni-Directional Khellani Tunnel of length 1.574 Km & its approach Road from Km 29.030 to Km 31.449 of total length of 2.419 Km on NH-244 in Union Territory of Jammu & Kashmir on EPC Mode. (Pkg-III). Dated: 08-02-2021.
Technical Evaluation Result for Improvement of existing road to 2 laning with Hard Shoulders of 2 laning of Maram-Peren section (Package-IIA, length- 16.840 Km) from Design Chainage 40.000 km to 56.840 Km on NH-129A in the State of Manipur on EPC mode. Dated: 08-02-2021.
Technical Evaluation Result for Detailed survey of NH-4 from Km 0.00 to Km 330.7 using Network Survey Vehicle (NSV) in the Union Territory of Andaman & Nicobar Islands-2 Call. Dated: 03-02-2021.
Technical Evaluation Result for Improvement of existing road to 2 laning with Hard Shoulders of Maram- Peren section (Package-IA, length- 22.340 Km) from Design Chainage 0.000 km to 22.340 Km on NH-129A in the State of Manipur on EPC Mode. Dated: 03-02-2021.
Technical Evaluation Result for Improvement of existing road to 2 laning with Hard Shoulders of Maram- Peren section (Package-IB, length- 17.660 Km) from Design Chainage 22.340 Km to Km 40.000 on NH-129A in the State of Manipur on EPC mode. Dated: 02-02-2021.
Technical Evaluation Result for Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 173.850 to Km 190.850 (Length – 17.00 Km) in the state of Nagaland on EPC mode (Pkg – V) under NH(O) – TSP. Dated: 02-02-2021.
Technical Evaluation Result for Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 146.208 to Km 163.592 (Length – 17.384 Km) in the state of Nagaland on EPC mode (Pkg – III) under NH(O) – TSP. Dated: 02-02-2021.
Technical Evaluation Result for Realignment of NH717A from Design CH: 0.00 (Km 77.800 of NH-10) to Design CH: 2.00 (Km 3.100 of NH-717A) with two lane paved shoulder including Major Bridge of 680 m in the State of Sikkim on EPC Mode. Dated: 02-02-2021.
Technical Evaluation Result for Rehabilitation and up-gradation of road from design km 19.300 to km 31.300 (Total length: 12.000 km) of Agartala – Khowai section on NH 108 B to two lane with paved shoulder in the state of Tripura on EPC basis (Package-II). Dated: 02-02-2021.
Technical Evaluation Result for Construction & Upgradation to 2-lane /4lane with paved shoulder from Design Km 148+589 (Existing km 235+070) (Vailoo )to Design Km 176+532 (Existing km 263+070) Donipawa of 27.943 km length on Khellani-Khanabal section of NH-244 in the Union Territory of Jammu & Kashmir on EPC mode. (Pkg–VI. Dated: 01-02-2021.
Technical Evaluation Result for Ordinary Repair of Ukhrul-Toloi-Tadubi road from km 00.000 to km 60.000 covering 60.00 Km length on NH-102A in the state of Manipur on Item Rate Basis. Dated: 01-02-2021.
Technical Evaluation Result for Ordinary Repair of Ukhrul-Toloi-Tadubi road from km 60.000 to km 115.000 covering length of 55.00 Km on NH-102A in the state of Manipur on Item Rate Basis. Dated: 01-02-2021.
Technical Evaluation Result for Rehabilitation of section from Km 298.00 to Km 330.662 (Karala to Kalipur) of NH-04 to Intermediate lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands (Total Length 32.662 km) on EPC Mode (Package- VIII). Dated: 01-02-2021.
Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF: (i) Construction of two lane with hard shoulders of Arrowa-Khupa-Hayuliang Section of NH-113 from Ch 68.550 Km to 91.633 in the state of Arunachal Pradesh on EPC Mode under NH(O)-NE. (ii) Construction of two lane with hard shoulders of Demwe-Brahmkund section of NH- 13 from Ch 0.000 Km to 18.464 in the state of Arunachal Pradesh on EPC Mode under NH(O)-NE. Dated: 01-02-2021.
Technical Evaluation Result for Consultancy Services for Authority’s Engineer for Supervision of (i)“Construction of 2 laning with Hard shoulder of Peren- Dimapur section on NH 129A from Design Km 109.494 to Km 126.775 (Length – 17.281 Km) in the state of Nagaland on EPC mode (Package I) under NH(O)- TSP) (ii) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 126.775 to Km 146.450 (Length – 19.675 Km) in the state of Nagaland on EPC mode (Pkg – II) under Bharatmala NH(O) – TSP. Dated: 01-02-2021.
Technical Evaluation Result for CONSTRUCTION OF BALANCE WORK OF TWO – LANE WITH HARD SHOULDERS OF EXISTING HAYULIANG – HAWAI ROAD (NH-113) FROM DESIGN KM 51.825 TO KM 63.131 (EXISTING KM 45.050 OF HAYULIANG – HAWAI ROAD TO HAWAI TOWN)(11.306 KM) ON EPC BASIS IN THE STATE OF ARUNACHAL PRADESH PACKAGE OF SARDP – NE(GREEN FIELD ALIGNMENT). Dated: 29-01-2021.
Technical Evaluation Result for CONSTRUCTION OF BALANCE WORK OF 2 LANING OF AKAJAN-LIKABALI-BAME ROAD ON EPC BASIS FROM DESIGN KM 33.00 TO KM 65.810 (EXISTING KM 36.00 TO KM 71.00) IN THE STATE OF ARUNACHAL PRADESH UNDER SARDP-NE). Dated: 29-01-2021.
Technical Evaluation Result for Construction & Upgradation to 2 lane with paved shoulder from Design Km. 31.449 (Khellani) (Ex. Km 44.946) to Km 51.700 (Prem Nagar) (Ex. Km 68+617) of 20.251 Km length on Khellani – Kishtwar – Chattroo section of NH-244 in the Union Territory of Jammu & Kashmir on EPC mode (Pkg –I). Dated: 25-01-2021.
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 81+000 to km 95+400 (Design Chainage 80+930 to 96+400) of Loring Thepi – Ganapath Gaur Gaon Section – (Package-4) of NH-29 in the state of Assam under Bharatmala Pariyojana on EPC mode. Dated: 19-01-2021.
Technical Evaluation Result for Construction, Operation & Maintenance of Automated Site adjoining Co Construction, Operation & Maintenance of Automated multilevel car parking facility At Site adjoining Co-op Dept. Building, Kacheripady, Kochi, Kerala. Dated: 15-01-2021.
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of“Construction and Upgradation of existing road on NH-510 between Rabangla to Gyalshing to 2-lane with paved shoulder configuration in the State of Sikkim under SARDP-NE Phase ‘A’ on EPC mode for (i) Km 32+500 to Km 33+600 (Package-III), (ii) Km 33+600 to Km 58+840 (Package IV), (iii) Km 58+840 to Km 75+000 (Package V) & (iv) Km 75+000 to Km 90+210(Package VI)” (2nd Call). Dated: 12-01-2021.
Technical Evaluation Result for Construction and upgradation of existing road to 2-lane with Paved shoulder from km. 20.340 (Rongli Bazzar) to km. 26.588 (Rongli Bypass End) and upgradation of existing road at km 20.600 & km 26.400 for length of 0.520 km & 0.554 km of Rhenok – Menla spur (NH-717B) Package-II A on EPC Basis under SARDP- NE Phase ‘A’ in the State of Sikkim. Dated: 11-01-2021.
Technical Evaluation Result for Procurement of Ambulances- Fully equipped Ambulances for Highway patrolling under the jurisdiction of NHIDCL’s Regional Offices located in NER States, UT of Ladakh, J&K, A&N Islands and Uttarakhand. Dated: 11-01-2021.
Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF (i) WIDENING/IMPROVEMENT TO 4 (FOUR) LANE WITH PAVED SHOULDER FROM KM 66+000 TO KM 81+000 (DESIGN CHAINAGE 65+923 TO 80+930) OF DOKMOKA – LORINGTHEPI SECTION (PACKAGE-3) OF NH-29 IN THE STATE OF ASSAM UNDER BHARATMALA PARIYOJNA ON EPC MODE And (ii) WIDENING/IMPROVEMENT TO 4 (FOUR) LANE OF DABOKA DIMAPUR STRETCH FROM KM 81+000 TO KM 95+400 (DESIGN CHAINAGE 80+930 TO 96+400) OF LORING THEPI – GANAPATH GAUR GAON SECTION – (PACKAGE-4) OF NH-29 IN THE STATE OF ASSAM ON EPC MODE. Dated: 08-01-2021.
Technical Evaluation Result for Construction of High Altitude Hill road from Ladda to Basai from KM 0.000 to KM 32.260 in East Kameng District of the state of Arunachal Pradesh on EPC Mode. Dated: 08-01-2021.
Technical Evaluation Result for Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 126.775 to Km 146.450 (Length – 19.675 Km) in the state of Nagaland on EPC mode (Pkg – II) under Bharatmala NH(O) – TSP . Dated: 07-01-2021.
Technical Evaluation Result for Consultancy Services for supervision of “Special repair of NH 202, Mokokchung-Tuensang Road (from Km 0.000 to 95.000 Km) [Total length – 95.00 Km] in the state of Nagaland for the FY 2020-21-3rd Call. Dated: 07-01-2021.
Technical Evaluation Result for Consultancy Services for supervision of Special repair of NH 702-D, Mokokchung-Mariani Road (from Km 0.000 to 63.000 Km) [Total length – 63.00 Km] in the state of Nagaland for the FY 2020-21-3rd Call. Dated: 07-01-2021.
Technical Evaluation Result for Instructions to tenderers and from of tender for PART DESIGN, CONSTRUCTION, OPERATION & MAINTENANCE (For a Period of 5 Years) OF FULLY AUTOMATIC MULTI-LEVEL CAR PARKING SYSTEM AT CENTRAL CIVIL SECRETARIAT, ITANAGAR, ARUNACHAL PRADESH (4th call). Dated: 04-01-2021.
Technical Evaluation Result for Restoration/ Rehabilitation Of Ukhrul To Nagaland Border Via Jessami Road From Km 95.00 To Km 111.00 (Length 16 Km) NH-150 In The State Of Manipur-2nd call. Dated: 02-01-2021.
Technical Evaluation Result for Restoration/ Rehabilitation Of Ukhrul To Nagaland Border Via Jessami Road From Km 79.00 To Km 95.00 (Length 16 Km) NH-150 In The State Of Manipur-2nd Call. Dated: 02-01-2021.