  1. Financial Bid Opening for Consultancy Services for Preparation, Submission & Clearance of Land Acquisition Plan, Utility Shifting proposals for 2 lane widening Kohima – Jessami from Km 7.88 to Km 117.20 based on DPR prepared by M/s Feedback Infra Pvt. Ltd in the State of Nagaland. Dated: 26-06-2020.
  2. Financial Bid Opening for Consultancy services for Authority’s Engineer for Supervision of (i) Widening and Improvement of Imphal-Moreh section from Km 395.680 to Km 425.411 to Two (2) lane with paved shoulders on NH-39 in the State of Manipur (Package-3) on EPC mode under ADB (SASEC) loan under Tranche-3. (ii) Construction of Moreh Bypass to Two Lane with paved shoulder from Km 421.950 to Km 425.411 (Length = 2.52 Km) on NH-39 near Indo-Myanmar border in the State of Manipur on EPC mode. (iii) Widening/Strengthening to Two laning with hard shoulder of Pallel- Chandel section From Km 0.000 to Km 18.292 of NH-102C in the state of Manipur on Engineering, Procurement & Construction (EPC) Mode. Dated: 25-06-2020.
  3. Financial Bid Opening for Widening and Improvement of Imphal-Moreh section from Km 395.680 to Km 425.411 to Two (2) lane with paved shoulders on NH-39 in the State of Manipur (Package-3) on EPC mode under ADB (SASEC) loan. Dated: 25-06-2020.
  4. Technical Evaluation Result for Restoration and Repair Work of Batote-Kishtwar- Sinthan Pass road in the Union Territory of Jammu and Kashmir from km 155.00 to km 170.00 (Total Length under R&R = 15 km) and other Misc. works. Dated: 25-06-2020.
  5. Technical Evaluation Result for Provision of Paved Shoulder in Selected Length, Footpath, Road Safety & Road Furniture and other miscellaneous items from Rangpo to Ranipool from Km 52+000 to Km 80+000 of NH-10 in the State of Sikkim on Item Rate Contract. Dated: 24-06-2020.
  6. Financial Bid Opening for Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Km 48.587 to Km 69.875 (Package-2B) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode” under Bharatmala. Dated: 22-06-2020.
  7. Financial Bid Opening for Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Km 130+000 to Km 141+029 (Package-4B) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode.” under Bharatmala. Dated: 22-06-2020.
  8. Financial Bid Opening for Restoration and Repairs of NH-129A from Manipur/Nagaland Border (Dzuko Bridge) to Mhainamtsi (Km 0.0 to 39.0) [Length=39 Km] in the State of Nagaland in the FY 2020-21. Dated: 16-06-2020.
  9. Financial Bid Opening for Restoration and Repairs of NH-129A from 7th-mile junction, Dimapur to Mhaikam (Km 0.0 to 16.0) [Length=16 Km] in the State of Nagaland in the FY 2020-21. Dated: 16-06-2020.
  10. Financial Bid Opening for Construction of 4-Lane Bridge over Irang River on Imphal- Jiribam road section (95.500Km) NH-37 (Old NH-53) in the State of Manipur on EPC mode” under NH(O). Dated: 10-06-2020.
  11. Technical Evaluation Result for Construction and upgradation of existing road to 2-lane with paved shoulder of Bagrakot-Kafer section of NH-717A from Km. 13.000 to Km. 25.600 on EPC basis under SARDP-NE Phase A in the State of West Bengal (Package-IV B).. Dated: 08-06-2020.
  12. Technical Evaluation Result for Ordinary Repair of NH -102A from Toloi-Tadubi (Km 28.00 to Km 115.00) km [Total Length = 87.00 km] in the state of Manipur in the year 2020-2021. Dated: 08-06-2020.
  13. Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of Highway Tunnel including approaches across Shinkun La, Tanglang La & Lachalung La in the Union Territory of Ladakh. Dated: 03-06-2020.
  14. Technical Evaluation Result for Development of External Trunk Connectivity and Internal Infrastructure Works at Multi-Model Logistics Park at Jogighopa in the state of Assam on Engineering, Procurement & Construction (EPC) Mode” (Package-I: Road and Utility Works). Dated: 03-06-2020.
  15. Technical Evaluation Result for Development of Internal Infrastructure Works at Multi-Model Logistics Park at Jogighopa in the state of Assam on Engineering, Procurement & Construction (EPC) Mode (Package-II). Dated: 03-06-2020.
  16. Technical Evaluation Result Consultancy services as Authority’s Engineer for Supervision of “Rehabilitation and Up-gradation to 2 lane with paved shoulders of Seling-Dulte section (Economic Corridor) of NH-6 from Existing chainage Km 0+000 to Km 69+015 (Design Chainage Km 0+000 to Km 62+200) in the State of Mizoram under Bharatmala Pariyojna on EPC mode.Dated: 28-05-2020.
  17. Technical Evaluation Result Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of Highway Tunnel including approaches across Shinkun La, Tanglang La & Lachalung La in the Union Territory of Ladakh. Dated: 22-05-2020.
  18. Technical Evaluation Result of the tender “M&R works for Akhegwo to Jessami (Aakash Bridge) of NH-202 from Km.283+000 to Km. 326+000, L=43 Km in the State of Nagaland on Item Rate and Work Order Basis. Dated: 21-05-2020.
  19. Technical Evaluation Result for providing telecom services at NHIDCL Headquarter, Corporate Office, Regional Offices, Project Monitoring Unit and Site Office (Second Call). Dated: 19-05-2020.
  20. Technical Evaluation Result for Restoration of Road by construction of Pucca Drain in selected stretches from km 0.000 to km 170.000 on Batote -Kishtwar- Sinthan Pass Road on NH-244 in the Union Territory of Jammu & Kashmir. Dated: 15-05-2020.
  21. Technical Evaluation Result for Beautification of Indira Bye-pass Road from Km 0.000 (Amdo-Golai) to Km 10.117 (Bhojoghari-Phatak) in the state of Sikkim on Item Rate Basis. Dated: 14-05-2020.
  22. Technical Evaluation Result for Routine maintenance of Changtongya – Longleng road (NH 702 New) from existing km 00.000 to km 29.530 (length 29.530 km) in the State of Nagaland on Item Rate Basis.Dated: 14-05-2020.
  23. Technical Evaluation Result for Restoration of Road by way of snow clearance, clearance of consolidated slips, surface boulders, side drain, culverts, including the construction of Retaining wall and Breast wall in selected stretches on Goha-Khellani Road (Ch. 0.000 to Ch. 29.800) of new alignment of NH-244 in the Union territory of Jammu & Kashmir. Dated: 13-05-2020.
  24. Technical Evaluation Result for  Maintenance of Kohima to Mao, (Nagaland/ Manipur border) section of NH-2 from Km. 185.000 to Km. 212.700, L=27.700 km in the State of Nagaland on Item Rate and Work Order Basis.Dated: 12-05-2020.
  25. Technical Evaluation Result for Restoration of Road by providing & laying of WBMIII, Bituminous Macadam & Bituminous Concrete including construction of Protection walls, Cross Drainage works in selected stretches& Fixtures of Road safety Furniture from K.m. 170.000 to K.m. 265.000 on Batote-Kishtwar-Sinthanpass road (NH-244) in the Union territory of Jammu & Kashmir.Dated: 02-05-2020.
  26. Technical Evaluation Result for Routine maintenance of Kohima-Jessami road NH-29 (Old NH 150) from km 0.000 to km 120.000 (length 120 km) in the State of Nagaland on Item Rate Basis and Work Order Basis- Retender.Dated: 09-04-2020.
  27. Technical Evaluation Result for Construction and up gradation of 4 lane of existing 2 lane with paved shoulder from Hapachara to Tulungia road of NH-117 of existing Km 0.00 to Km 14.050 and (Design KM 0.000 to Km 14.660), (Design length – 14.660 Km) on EPC basis in the State of Assam under Bharatmala Pariyojana in Economic Corridors.Dated: 24-03-2020.
  28. Technical Evaluation Result for Maintenance of NHIDCL Website & Handling of Social Media accounts of NHIDCL.Dated: 23-03-2020.
  29. Technical Evaluation Result for RFP for Widening /Improvement to 2 (Two) Lane with Earthen Shoulder of Yaingangpokpi-Finch Corner Section from km 0.00 to 16.900 (length 16.900km) of NH 202 in the State of Manipur on EPC mode. Dated: 23-03-2020. 
  30. Technical Evaluation Result for  Widening /Improvement to 2 (Two) Lane with Earthen Shoulder of Yaingangpokpi-Finch Corner Section from km 16.900 to 30.970 (length 14.070km) of NH 202 in the State of Manipur on EPC mode. Dated: 23-03-2020. 
  31. Technical Evaluation Result for Short Term Improvement of the Road from Km 0.00 (Sirwani Road) to Km 3.00 (Dalep Turning) of NH-510 in the State of Sikkim on Item Rate Basis. Dated: 21-03-2020. 
  32. Technical Evaluation Result for Beautification of Indira Bye-pass Road from Km 0.000 (Amdo-Golai) to Km 10.117  (Bhojoghari Phatak) in the state of Sikkim on Item Rate Basis. Dated: 21-03-2020.
  33. Technical Evaluation Result for Construction of two lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) from existing km 76.320 (near Mesulumi Village) to existing km 98.380 (near Chizami Village) [Design Length – 21.50 Km] in the state of Nagaland Under Bharatmala Pariyojana on EPC Mode (Package IV). Dated: 20-03-2020.
  34. Technical Evaluation Result for Construction of two lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) from existing km 98.380 (near Chizami Village) to existing km 120.367 (Nagaland/Manipur Border) [Design Km 95.700 to design Km 117.200] [Design Length – 21.500 Km] in the state of Nagaland Under Bharatmala Pariyojna on EPC Mode (Package V).Dated: 20-03-2020. 
  35. Technical Evaluation Result for Rehabilitation and up-gradation of road from design km 6.500 to km 19.300 (Total length: 12.800 km) of Agartala – Khowai section on NH 108 B to two lane with paved shoulder in the state of Tripura on EPC basis.Dated: 20-03-2020.
  36. Technical Evaluation Result for Rehabilitation and up-gradation of road from design km 19.300 to km 31.300 (Total length: 12.000 km) of Agartala – Khowai section on NH 108 B to two lane with paved shoulder in the state of Tripura on EPC basis.  Dated: 20-03-2020.
  37. Technical Evaluation Result for Rehabilitation and up-gradation of road from design km 31.300 to km 45.300 (Total length: 14.000 km) of Agartala – Khowai section on NH 108 B to two lane with paved shoulder in the state of Tripura on EPC basis. Dated: 20-03-2020.
  38. Technical Evaluation Result for Four Laning of NH-37 from Nagaon By-pass to Teliagaon (km 278.600 to km 288.600) in the state of Assam under SARDP-NE Phase-A on EPC mode – Package – 1. Dated: 18-03-2020.
  39. Technical Evaluation Result for  Widening / Strengthening to Two laning with hard shoulder of Pallel- Chandel section From Km 0.000 to Km 18.292 of NH-102C in the state of Manipur on Engineering, Procurement & Construction (EPC) Mode under NH(O). Dated: 17-03-2020. 
  40. Technical Evaluation Result for Four Laning of NH-37 from Teliagaon to Rangagara (km 288.600 to km 297.000) in the state of Assam under SARDP-NE Phase-A on EPC mode – Package – 2. Dated: 17-03-2020. 
  41. Financial Bid Opening for Construction of two-lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) From existing km 30.474 (near Kidwema road Chakahabama) to existing km 53.220 (near Kikruma Village) [ Design Km 29.6 to design Km 51.5] [Design Length – 21.90 Km] in the state of Nagaland under Bharatmala Pariyojna on EPC Mode (Package II). Dated: 16-03-2020. 
  42. Technical Evaluation Result for Rehabilitation and Up-gradation of Dergaon Town to 4 laning from km. 426.800 to km 437.400 on NH-37 in the state of Assam on Engineering, Procurement & Construction (EPC) Mode. Dated: 16-03-2020.
  43. Technical Evaluation Result for the project of Construction of two lane with hard shoulder of Kohima-jessami Road on NH-29 (Old NH-150) from existing km 53.220 (near Kikruma Village) to existing km 76.320 (near Mesulumi Village) [ Design Km 51.5 to design Km 74.2] [Design Length – 22.7 Km] in the state of Nagaland Under Bharatmala Pariyojna on EPC Mode (Package III). Dated: 11-03-2020. 
  44. New Technical Evaluation Result for the project of Rehabilitation of section from Km 298.00 to Km 330.662 (Karala to Kalipur) of NH-04 to Intermediate lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands (Total Length 32.36 km) on EPC Mode (Package- VIII)[Re-Tender]. Dated: 06-03-2020. 
  45. Technical Evaluation Result for the project of Appointment of Creative Agency By The National Highways & Infrastructure Development Corporation Ltd. (NHIDCL). Dated: 06-03-2020. 
  46. Financial opening letter for the project of Improvement and Widening to two lanes with paved shoulders of Jolaibari – Belonia (from km 0.000 to km 21.412) section of NH-108A in the state of Tripura on Engineering, Procurement & Construction (EPC) mode. Dated: 03-03-2020.
  47. Evaluation Result for Routine maintenance of KohimaJessami road NH-29 (Old NH 150) from km 0.000 to km 120.000 (length 120 km) in the State of Nagaland on Item Rate Basis. Dated: 26-02-2020.
  48. Financial Bid Opening for Construction of two-Lane with hard shoulders of Changtongya – Longleng Road on EPC basis from existing Km 16.530 to Km 29.530 [Design Km. 18+779 to Km. 33+428] (Design Length –14+649 Km) in the state of Nagaland (Pkg-2) under NH (O) Plan .  Dated: 25-02-2020.
  49. Financial Bid Opening for Construction of two-Lane with hard shoulders of Changtongya Longleng Road on EPC basis from existing Km 0.0 to Km 16.592 [Design Km. 0+000 to Km. 18+779] (Design Length – 18.779 Km) in the state of Nagaland (Pkg-1)” under NH (O) Plan.  Dated: 25-02-2020. 
  50. Financial Bid Opening for Special Protection Work on Rehabilitation and restoration of Sinking/Sliding Zone from Km 70+900 to Km 71+100 and Km 71+550 to Km 71+850 with JICA Technical Assistance including widening of Narrow Zone from Km 53+775 to Km 54+100 and from Km 63+045 to Km 63+470 on NH-10 (Rangpo To Ranipool section) in the State of Sikkim. Dated: 24-02-2020. 
  51. Technical evaluation result for the Authority’s Engineer for the Meghalaya project(Tura Dalu). Dated: 20-02-2020. 
  52. Technical evaluation result for Empanelment of Advertising Agencies for managing print media advertisements of  National Highways & Infrastructure   Development Corporation Limited in   National and other dailies at DAVP or lesser rates. Dated: 19-02-2020.
  53. Technical evaluation result for Empanelment of Consultants for preparation of Feasibility Report, Architectural & Structural Design of Automated Multilevel Car Parking System at various locations in India (2nd Phase).  Dated: 17-02-2020.
  54. Technical evaluation result for Construction of Bi-directional Tunnel at “Km 83” of Length 495 m including approaches road of 664 m and a Major Bridge of 110 m from Km 82+675 to Km 82+925 on NH-244 in Jammu & Kashmir on EPC mode. Dated: 05-02-2020.
  55. Technical evaluation result for the Authority’s Engineer for the Meghalaya project(Tura Dalu). Dated: 03-02-2020.
  56. Technical evaluation result for Hiring of Vehicles and drivers for the office use in NHIDCL, HQ, PTI Building, New Delhi on monthly rental basis as well as for as and when requirement.Dated: 16-01-2020.
  57. Technical evaluation result for selection of Manpower Placement Agency for providing services of Office Staff (such as Stenographers, Office Assistants, Data Entry Operators, Multi-tasking Staff, etc.) at NHIDCL Headquarters, New Delhi. Dated: 09-01-2020.