GST No. 07AAECN7759E1Z7
CIN : U45400DL2014GOI269062
A+
A+
A+
A+
National Portal
English
हिन्दी
(
Hindi
)
National Highways & Infrastructure Development Corporation Ltd.
Ministry of Road Transport & Highways, Government of India
Home
About
About Us
Our Organisation
Who’s who
Our Mission
Our Vision
Honourable Minister’s Message
Annual Report
2021-2022
2020-2021
2019-2020
2018-2019
2017-2018
2016-2017
2015-2016
2014-2015
CSR
Annual Return of NHIDCL
2020
2021
2022
Skill Development Training Program
International Cooperation
RTI
GST Cell
MoA(Memorandum of Association) & Notices
Dispute Resolution Mechanism
Internal Complaints Committee (ICC)
Chief Vigilance officer (CVO)
Independent External Monitor (IEM)
Projects
Current Status
All States
Andaman & Nicobar
Arunachal Pradesh
Assam
Himachal Pradesh
Manipur
Meghalaya
Mizoram
Nagaland
Sikkim
Tripura
Union Territory of Jammu & Kashmir
Union Territory of Ladakh
Uttarakhand
West Bengal
Nepal
Project Archive
Maps
Andaman & Nicobar
Arunachal Pradesh
Assam
Himachal Pradesh
Manipur
Meghalaya
Mizoram
Nagaland
Sikkim
Tripura
Union Territory of Jammu & Kashmir
Union Territory of Ladakh
Uttarakhand
West Bengal
Nepal
e Book
NHIDCL 2016
NHIDCL 2015
Guidelines on LA
Infracon
INAM-Pro
INAM-Pro Brochure
BGMS
Sugampath
IT Task Force
Essential Safety for Hill Roads
Standardization of Reporting Responsibilities for AEs & IEs
Appropriate Technologies for Soil & Slope Stabilization
ePace
BIMS Brochure
eAccess
The Motor Vehicles Act, 1988
The Central Motor Vehicles Rules, 1989
Tenders
Current Tenders
Tender Archive
eAuction
Current eAuction
Archive eAuction
Black List / Debarment
Termination
Negative List
Non-Performer
List of Banks
Links
Bank of Ideas
NHIDCL Email
INAM-Pro
INFRACON
BG Management
Bhoomirashi
eDMS
eOffice
SAP
PMIS
BiMS
eProcurement
Grievance Redressal
CPGRAMS
ePACE
India Investment Grid (IIG)
eSamiksha Monitoring
eSamiksha Review
eSuvidha
Ministry of Road Transport & Highways
OCMS
VIP References
IAHE
National Highways Authority of India
IRC
Ministry of External Affairs
Ministry of Shipping
MSME SAMBANDH
Events
Images
Videos
Official Language Gallery
Web Portal Videos
Presentation
Employee Portal
Career
Current Openings
Opening Archive
Contact
Corporate Office
Details of NHIDCL Officers & Staff on Deputation/ Contract
Field Offices
Feedback
Home
About
About Us
Our Organisation
Who’s who
Our Mission
Our Vision
Honourable Minister’s Message
Annual Report
2021-2022
2020-2021
2019-2020
2018-2019
2017-2018
2016-2017
2015-2016
2014-2015
CSR
Annual Return of NHIDCL
2020
2021
2022
Skill Development Training Program
International Cooperation
RTI
GST Cell
MoA(Memorandum of Association) & Notices
Dispute Resolution Mechanism
Internal Complaints Committee (ICC)
Chief Vigilance officer (CVO)
Independent External Monitor (IEM)
Projects
Current Status
All States
Andaman & Nicobar
Arunachal Pradesh
Assam
Himachal Pradesh
Manipur
Meghalaya
Mizoram
Nagaland
Sikkim
Tripura
Union Territory of Jammu & Kashmir
Union Territory of Ladakh
Uttarakhand
West Bengal
Nepal
Project Archive
Maps
Andaman & Nicobar
Arunachal Pradesh
Assam
Himachal Pradesh
Manipur
Meghalaya
Mizoram
Nagaland
Sikkim
Tripura
Union Territory of Jammu & Kashmir
Union Territory of Ladakh
Uttarakhand
West Bengal
Nepal
e Book
NHIDCL 2016
NHIDCL 2015
Guidelines on LA
Infracon
INAM-Pro
INAM-Pro Brochure
BGMS
Sugampath
IT Task Force
Essential Safety for Hill Roads
Standardization of Reporting Responsibilities for AEs & IEs
Appropriate Technologies for Soil & Slope Stabilization
ePace
BIMS Brochure
eAccess
The Motor Vehicles Act, 1988
The Central Motor Vehicles Rules, 1989
Tenders
Current Tenders
Tender Archive
eAuction
Current eAuction
Archive eAuction
Black List / Debarment
Termination
Negative List
Non-Performer
List of Banks
Links
Bank of Ideas
NHIDCL Email
INAM-Pro
INFRACON
BG Management
Bhoomirashi
eDMS
eOffice
SAP
PMIS
BiMS
eProcurement
Grievance Redressal
CPGRAMS
ePACE
India Investment Grid (IIG)
eSamiksha Monitoring
eSamiksha Review
eSuvidha
Ministry of Road Transport & Highways
OCMS
VIP References
IAHE
National Highways Authority of India
IRC
Ministry of External Affairs
Ministry of Shipping
MSME SAMBANDH
Events
Images
Videos
Official Language Gallery
Web Portal Videos
Presentation
Employee Portal
Career
Current Openings
Opening Archive
Contact
Corporate Office
Details of NHIDCL Officers & Staff on Deputation/ Contract
Field Offices
Feedback
Home
About
About Us
Our Organisation
Who’s who
Our Mission
Our Vision
Honourable Minister’s Message
Annual Report
2021-2022
2020-2021
2019-2020
2018-2019
2017-2018
2016-2017
2015-2016
2014-2015
CSR
Annual Return of NHIDCL
2020
2021
2022
Skill Development Training Program
International Cooperation
RTI
GST Cell
MoA(Memorandum of Association) & Notices
Dispute Resolution Mechanism
Internal Complaints Committee (ICC)
Chief Vigilance officer (CVO)
Independent External Monitor (IEM)
Projects
Current Status
All States
Andaman & Nicobar
Arunachal Pradesh
Assam
Himachal Pradesh
Manipur
Meghalaya
Mizoram
Nagaland
Sikkim
Tripura
Union Territory of Jammu & Kashmir
Union Territory of Ladakh
Uttarakhand
West Bengal
Nepal
Project Archive
Maps
Andaman & Nicobar
Arunachal Pradesh
Assam
Himachal Pradesh
Manipur
Meghalaya
Mizoram
Nagaland
Sikkim
Tripura
Union Territory of Jammu & Kashmir
Union Territory of Ladakh
Uttarakhand
West Bengal
Nepal
e Book
NHIDCL 2016
NHIDCL 2015
Guidelines on LA
Infracon
INAM-Pro
INAM-Pro Brochure
BGMS
Sugampath
IT Task Force
Essential Safety for Hill Roads
Standardization of Reporting Responsibilities for AEs & IEs
Appropriate Technologies for Soil & Slope Stabilization
ePace
BIMS Brochure
eAccess
The Motor Vehicles Act, 1988
The Central Motor Vehicles Rules, 1989
Tenders
Current Tenders
Tender Archive
eAuction
Current eAuction
Archive eAuction
Black List / Debarment
Termination
Negative List
Non-Performer
List of Banks
Links
Bank of Ideas
NHIDCL Email
INAM-Pro
INFRACON
BG Management
Bhoomirashi
eDMS
eOffice
SAP
PMIS
BiMS
eProcurement
Grievance Redressal
CPGRAMS
ePACE
India Investment Grid (IIG)
eSamiksha Monitoring
eSamiksha Review
eSuvidha
Ministry of Road Transport & Highways
OCMS
VIP References
IAHE
National Highways Authority of India
IRC
Ministry of External Affairs
Ministry of Shipping
MSME SAMBANDH
Events
Images
Videos
Official Language Gallery
Web Portal Videos
Presentation
Employee Portal
Career
Current Openings
Opening Archive
Contact
Corporate Office
Details of NHIDCL Officers & Staff on Deputation/ Contract
Field Offices
Feedback
Tender Evaluation Result 2020
Tender Evaluation
Result 2020
TECHNICAL EVALUATION RESULT FOR CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF (i) WIDENING/IMPROVEMENT TO 4 (FOUR) LANE WITH PAVED SHOULDER FROM KM 66+000 TO KM 81+000 (DESIGN CHAINAGE 65+923 TO 80+930) OF DOKMOKA – LORINGTHEPI SECTION (PACKAGE-3) OF NH-29 IN THE STATE OF ASSAM UNDER BHARATMALA PARIYOJNA ON EPC MODE And (ii) WIDENING/IMPROVEMENT TO 4 (FOUR) LANE OF DABOKA DIMAPUR STRETCH FROM KM 81+000 TO KM 95+400 (DESIGN CHAINAGE 80+930 TO 96+400) OF LORING THEPI – GANAPATH GAUR GAON SECTION – (PACKAGE-4) OF NH-29 IN THE STATE OF ASSAM ON EPC MODE. Dated: 31-12-2020.
Technical Evaluation Result for Notice Inviting Expression of Interest (EOI) for Engagement of Agency for Aerial Data Collection and Monitoring of NHIDCL Works Using Drone Technology. Dated: 31-12-2020.
Technical Evaluation Result for 2nd call for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF: (i) Improvement/ Up-gradation of existing 2-Lane Road to 4-Lane Divided Highway from TaphuKuki to Daili section (Pkg 4A) of Imphal-Kohima road (NH-39) (Design Chainage from Km 262+175 to Km 274+610) in the state of Manipur on EPC Mode. (ii) Improvement/ Up-gradation of existing 2-Lane Road to 4-Lane Divided Highway from Daili to Kuraopokpi section (Pkg-4B) of Imphal Kohima Road (NH-39) (Design Chainage from Km 274+610 to Km 287+000) in the state of Manipur on EPC Mode. (iii) Improvement/ Up-gradation to 4-Lane Divided Highway from Kuraopokpi to Sekmai section (Pkg-5A) of Imphal Kohima Road (NH-39) (Design Chainage from Km 287+000 to Km 297+700) in the state of Manipur. (iv) Improvement/ Up-gradation of existing 2-Lane road to 4-Lane Divided Highway from Sekmai to Nilkhuthi section (Pkg-5B) of Imphal Kohima Road (Design Chainage from Km 297+700 to Km 308+460) of NH-39 in the state of Manipur on EPC Mode. Dated: 31-12-2020.
Technical Evaluation Result for Ordinary Repairs of NH-4 from Ch 21+000 km to Ch 28+000 km in the Union Territory of Andaman and Nicobar Islands in the year 2020-21-4th Cal. Dated: 26-12-2020.
Technical Evaluation Result for Ordinary Repair of NH-08 from Km 422.000 to Km 423.000, Km 437.750 to Km 438.000, Km 438.340 to 443.000, Km 444.000 to Km 445.000 & Km 453.00 to Km 455.000 (Total Length = 8.91 Km) in the state of Tripura in the FY 2020-21 on percentage basis & work order basis. Dated: 23-12-2020.
Technical Evaluation Result for Construction of High Altitude Hill road from Taksing to Ghora from KM 0.000 to KM 7.090 in Upper Subansiri District of the state of Arunachal Pradesh on EPC Mode.Dated: 24-12-2020.
Technical Evaluation Result for Automated Multilevel Tower car parking facility at Aluva Metro station, Kochi, Kerala. Dated: 22-12-2020.
Technical Evaluation Result for Construction of 2 laning with paved shoulder of new greenfield alignment from Helipad at Menla at km 82.000 to Menla at Km 94.030 of Rhenok – Menla spur (NH-717B) Package-IIIB on EPC Basis under SARDP-NE Phase ‘A’ in the State of Sikkim. Dated: 18-12-2020.
Technical Evaluation Result for Construction and Installation of prefabricated Office cum Residence in the States of Arunachal Pradesh, Sikkim & Uttarakhand in high altitude remote areas. Dated: 22-12-2020.
Technical Evaluation Result for Construction and Installation of prefabricated Office cum Residence in the States of Himachal Pradesh & Union Territory of Ladakh in high altitude remote areas. Dated: 18-12-2020.
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of i) Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 32.00 to design Km 43.454 [Design Length – 11.454 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package IV) (ii) Upgradation of existing road to 2-Lane with Paved Shoulder from Kohima to Mao from Km 185.540 to Km 211.709 (Design length – 26.249) of NH -39 (New NH – 02) under NH(O) – TSP in the state of Nagaland in EPC mode. Dated: 18-12-2020.
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of (i) Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 0.00 to design Km 10.500 [Design Length – 10.500 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package I) (ii) Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 10.500 to design Km 21.00 [Design Length – 10.500 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package II) (iii) Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 21.00 to design Km 32.00 [Design Length – 11.00 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package III). Dated: 18-12-2020.
Technical Evaluation Result for Design, Engineering, Procurement, Supply And Construction For Construction Of Four Lane Bridge Including Approaches Over River Brahmaputra Between Dhubri On North Bank And Phulbari On South Bank In The State Of Assam / Meghalaya On NH-127B (Length: 19.282 km). Dated: 17-12-2020.
Technical Evaluation Result for Selection of Manpower placement agency for providing services of Middle Management Personnel (such as IT, Chartered Accountant, Legal and other professional staff) at NHIDCL Headquarters, New Delhi, its Site Offices, Project Monitoring Units (PMUs) and Regional Offices (ROs) of NHIDCL across India. Dated: 17-12-2020.
Technical Evaluation Result for CONSTRUCTION OF HIGH ALTITUDE HILL ROAD FROM DOGINALA TO GAU FROM KM 0.000 TO KM 15.320 IN UPPER SUBANSIRI DISTRICT OF THE STATE OF ARUNACHAL PRADESH ON EPC MODE. Dated: 16-12-2020.
Technical Evaluation Result for Consultancy services as Authority’s Engineer for Supervision of Construction of (i) Connecting road from Z-Morh Tunnel to Zojila Tunnel and (ii) 14.150 km long bi-directional tunnel across Zojila Pass on Sonamarg-Kargil section of NH-01 on EPC mode in the Union Territories of Jammu & Kashmir and Ladakh. Dated: 15-12-2020.
Technical Evaluation Result for EOI for Authority’s Engineer for Improvement and Widening to two lane with paved shoulder of Kailashahar – Khowai section of NH-208 in the state of Tripura on Engineering, Procurement Construction (EPC) mode – starting near Kirtanthali (near Kailashahar town) at km 21.100 and ending near Ganki in Khowai district at km 101.300 under JICA ODA loan Phase-IV on Engineering, Procurement, Construction (EPC) Mode. Dated: 11-12-2020.
Technical Evaluation Result for Independent Engineer services for Construction, Operation and Maintenance of Z-Morh tunnel including approaches on National Highways No.1 (Srinagar Sonamarg Gumri Road) in the UT of J&K on Design, Build, Finance, Operate and Transfer (DBFOT) Annuity basis (Project). Dated: 14-12-2020.
Technical Evaluation Result for Selection of Manpower placement Agency for providing services of Staff and Supporting Staffs in Project Monitoring Units (PMUs) / Regional Offices (RO), Nagaland-2nd Call. Dated: 14-12-2020.
Technical Evaluation Result for Repair & Maintenance work of Indira Byepass from Km 0.000 to 10.117 including rehabilitation of Sinking zone & Safety work in State of Sikkim on item rate contract basis. Dated: 12-12-2020.
Technical Evaluation Result for Re-Construction of composite Steel Girder bridge(Bidhar Bridge)at Km. 229+800 of 40m span between Sinthan pass via Vailoo to Donipawa section of NH-244 using Innovative technology in the Union Territory of Jammu & Kashmir on EPC mode. Dated: 11-12-2020.
Technical Evaluation Result for Construction of High Altitude Hill road from Dembuen TO Bruni from KM 0.000 to KM 36.300 in Anini District of the state of Arunachal Pradesh on EPC Mode. Dated: 10-12-2020.
Technical Evaluation Result for Consultancy services as Authority’s Engineer for Supervision of Construction of (i) Connecting road from Z-Morh Tunnel to Zojila Tunnel and (ii) 14.150 km long bi-directional tunnel across Zojila Pass on Sonamarg-Kargil section of NH-01 on EPC mode in the Union Territories of Jammu & Kashmir and Ladakh. Dated: 10-12-2020.
Technical Evaluation Result for Selection of Manpower Placement Agency for providing services of Un-skilled, semi-skilled and skilled manpower on monthly basis for NHIDCL in the State of Assam. Dated: 09-12-2020.
Technical Evaluation Result for Remodeling/ Renovation of Office space of Corporate Office of NHIDCL in PTI Building, Sansad Marg, New Delhi-110001. Dated: 09-12-2020.
Technical Evaluation Result for CONSTRUCTION OF HIGH ALTITUDE HILL ROAD FROM MIPI TO MATHUN (BASAM) FROM KM 0.000 TO KM 16.730 IN ANINI DISTRICT OF THE STATE OF ARUNACHAL PRADESH ON EPC MODE. Dated: 09-12-2020.
Technical Evaluation Result for Hiring of Vehicles on Monthly Basis for RO-Guwahati, NHIDCL in the state of Assam. Dated: 08-12-2020.
Technical Evaluation Result for Selection of Manpower Placement Agency for providing services of Un-skilled, semi-skilled and skilled manpower on monthly basis for NHIDCL in the State of Assam. Dated: 08-12-2020.
Technical Evaluation Result for CONSTRUCTION OF HIGH ALTITUDE HILL ROAD FROM TEDADEGE TO HENKAER FROM KM 0.000 TO KM 28.550 IN WEST SIANG DISTRICT OF THE STATE OF ARUNACHAL PRADESH ON EPC MODE. Dated: 08-12-2020.
Technical Evaluation Result for INSTRUCTIONS TO TENDERERS and FORM OF TENDER for PART DESIGN, CONSTRUCTION, OPERATION & MAINTENANCE (For a Period of 5 Years) OF FULLY AUTOMATIC MULTI-LEVEL CAR PARKING SYSTEM AT CENTRAL CIVIL SECRETARIAT, ITANAGAR, ARUNACHAL PRADESH. Dated: 08-12-2020.
Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF: (i) Construction and up gradation of 4 lane of existing 2 lane with paved shoulder from Hapachara to Tulungia road of NH-117 of existing km 0.00 to km 14.050 and (Design km 0.000 to km 14.660), (Design length – 14.660 km) on EPC basis in the state of Assam. (ii) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 75.330km to Ch.88.000 km (Design Ch.71.800 to Ch.84.100) of Jogighopa Bridge Approach (Near Pancharatna) – Agia (Near Nichinta) Section (Package-6) of Bilasipura- Guwahati road (NH-17) in the state of Assam on EPC mode. Dated: 03-12-2020.
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of “Construction and Upgradation of existing road to 2- lane with paved shoulder configuration of Rhenok – Menla spur (NH-717B) on EPC Mode under SARDP-NE Phase ‘A’ in the State of Sikkim between (i) Km 20+340 to Km 27+200 (Package-II A) [Rongli Bridge – Rongli Bypass End stretch], (ii) Km 27+200 to Km 37+600 (Package-II B) [Rongli Bypass End – Rolep Bridge stretch], (iii) Km 37+600 to Km 52+000 (Package-II C) [New Rolep BridgeChochenpheri stretch], (iv) Km 52+000 to Km 82+000 (Package-III A) [ChochenpheriHelipad stretch], & (v) Km 83+900 to Km 91+900 (Package-III B) [Helipad- Menla stretch]. Dated: 27-11-2020.
Technical Evaluation Result for Special repair of NH 702-D, Mokokchung-Mariani Road (from Km 0.000 to 63.000 Km) [Total length – 63.00 Km] in the state of Nagaland for the FY 2020-21- 2nd Call. Dated: 26-11-2020.
Technical Evaluation Result for Detailed survey of various roads using Network Survey Vehicle (NSV) in the UT of Jammu and Kashmir. Dated: 25-11-2020.
Technical Evaluation Result for Detailed survey of various roads using Network Survey Vehicle (NSV) in the State of Meghalaya. Dated: 24-11-2020.
Technical Evaluation Result for the work of Improvement and widening to two lane with paved shoulder of road from Km 63.700 to Km 75.700 (Total length: 12.000 km) i.e. Bamanchara – Srirampur section of NH-208 (Package-IV) in the state of Tripura on EPC basis. Dated: 23-11-2020.
Technical Evaluation Result for the work of Improvement and widening to two-lane with paved shoulder of road from km 21.100 to km 29.200(Total length:8.100km) i.e. Kailashahar-Fultali section of NH-208(Package-I) in the state of Tripura on EPC basis. Dated: 20-11-2020.
Technical Evaluation Result for the work of Improvement and widening to two-lane with paved shoulder of road from Km 29.200 to Km 49.200 (Total length: 20.000 km) i.e. Fultali – Jurichhara section of NH-208 (Package-II) in the state of Tripura on EPC basis. Dated: 20-11-2020.
Technical Evaluation Result for the work of Improvement and widening to two lane with paved shoulder of road from Km 75.700 to Km 101.300 (Total length: 25.600 km) i.e. Srirampur – Khowai section of NH-208 (Package-V) in the state of Tripura on EPC basis. Dated: 20-11-2020.
Technical Evaluation Result for work of Improvement and widening to two lane with paved shoulder of road from Km 49.200 to Km 63.700 (Total length: 14.500 km) i.e. Jurichhara – Bamanchara section of NH-208 (Package-III) in the state of Tripura on EPC basis. Dated: 20-11-2020.
Final Composite Score for Selection of Manpower Placement Agency for providing services of Civil Engineers at NHIDCL Headquarters, New Delhi, its Site Offices, Project Monitoring Units (PMUs) and Regional Offices (ROs) of NHIDCL across India. Dated: 12-11-2020.
Technical Evaluation Result for Special repair of NH 202, Mokokchung-Tuensang Road (from Km 0.000 to 95.000 Km) [Total length – 95.00 Km] in the state of Nagaland for the FY 2020-21- (2nd Call). Dated: 09-11-2020.
Technical Evaluation Result for Improvement to 2 lane with paved shoulder of NH-40 section from Km 93+490 to Km 123+800 (design Km 10+670 to Km 37+550) design length 26.55 km in the State of Meghalaya on EPC Mode under JICA Loan Assistance(Package-II ). Dated: 06-11-2020.
Technical Evaluation Result for Improvement to 2 Lane with paved shoulder / 4 lane of NH-40 section from Km 151+330 to Km 163+400 (design Km 63+530 to Km 71+520) design length 7.99 Km in the State of Meghalaya on EPC Mode under JICA loan Assistance (Package-V). Dated: 06-11-2020.
Technical Evaluation Result for Ordinary Repairs of NH-4 from Ch 21+000 km to Ch 28+000 km in the Union Territory of Andaman and Nicobar Islands in the year 2020-21-2nd Call. Dated: 06-11-2020.
Technical Evaluation Result for Detailed survey of NH-4 from Km 0.00 to Km 330.7 using Network Survey Vehicle (NSV) in the Union Territory of Andaman & Nicobar Islands. Dated: 05-11-2020.
Technical Evaluation Result for Slope Protection work at 02 Locations (km 72.00 and km 72.80), in Jarwa area from km 59.40 to km 107.00 of NH-223 (New NH-4) in the Union Territory of Andaman and Nicobar Islands in the year 2020-21-2nd Call.. Dated: 05-11-2020.
Technical Evaluation Result for Slope Protection work at km 71.720, in Jarwa area from km 59.40 to km 107.00 of NH-223 (New NH-4) in the Union Territory of Andaman and Nicobar Islands in the year 2020-21-2nd Call. Dated: 05-11-2020.
Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF “Improvement/Widening to 2 Lane with Earthen Shoulder of Ranikor-Maheshkola-Baghmara road section (i) Package-IV from Kanai to Rongara, existing chainage from km 85+970 to km 102+345 (design Chainage from km 81+100 to km 96+000) design length-14.763 km and (ii) Package-V from Rongara to Panda, existing chainage from km 102+345 to km 119.810 (design Chainage from km 96+000 to km 112.300) design length-16.300km on EPC Mode under SARDP-NE ‘Phase-A’in the State of Meghalaya. Dated: 05-11-2020.
Technical Evaluation Result for Design, Engineering, Procurement, Supply and Construction of Four lane Bridge including Approaches over River Brahmaputra between Dhubri on the North Bank and Phulbari on the South Bank in the state of Assam / Meghalaya on NH-127B (Length 20km. Dated: 03-11-2020.
Technical Evaluation Result for Ordinary Repair of NH -37 of Imphal-Jiribam Road (Km 75.00 to Km 145.00) [Total Length = 70.00 Km] in the state of Manipur in the year 2020-2021(2nd call). Dated: 02-11-2020.
Technical Evaluation Result for Construction of Jia Bharali Bridge along with its approaches and River Training Work from km 25.552 to km 27.500 of NH-37A (New NH-715) in the State of Assam on EPC Mode. Dated: 29-10-2020.
Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF “Improvement/Widening to 2 Lane with Earthen Shoulder of Ranikor-Maheshkola-Baghmara road section (i) Package-IV from Kanai to Rongara, existing chainage from km 85+970 to km 102+345 (design Chainage from km 81+100 to km 96+000) design length-14.763 km and (ii) Package-V from Rongara to Panda, existing chainage from km 102+345 to km 119.810 (design Chainage from km 96+000 to km 112.300) design length-16.300km on EPC Mode under SARDP-NE ‘Phase-A’in the State of Meghalaya. Dated: 29-10-2020.
Technical Evaluation Result for Consultancy Services for Authority’s Engineer for Supervision “Improvement/ widening to 2 lane with earthern shoulder from of Ranikor-BaghmaraMaheshkola road section from Ranikor to Nongjri existing km 0+000 to km 31+700 (design length – 33.250km) on EPC mode in the state of Meghalaya (Package-I). Dated: 28-10-2020.
Technical Evaluation Result for Consultancy Services for Authority’s Engineer for Supervision of Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 66+000 to km 81+000 (Design Chainage 65+923 to 80+930) of Dokmoka – LoringThepi Section (Package-3) of NH-29 in the state of Assam under Bharatmala Pariyojna on EPC mode. Dated: 27-10-2020.
Technical Evaluation Result for Construction of Lawngtlai bypass (Package-3) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on Engineering, Procurement and Construction (EPC) mode, with Japan International Cooperation Agency (JICA) loan assistance Dated: 27-10-2020.
Technical Evaluation Result for Improvement to 2 Lane with paved shoulder of NH-40 section from Km 131+820 to Km 151+330 (design Km 45+760 to Km 63+530) design length 17.77 km in the State of Meghalaya on EPC Mode under JICA loan Assistance(Package-IV). Dated: 26-10-2020.
Technical Evaluation Result for Improvement to 2 lane with paved shoulder of NH-40 section from Km 81+740 to Km 93+490 (design Km 0+000 to Km 10+670) & Improvement to 4 lane section of NH-44 from design Km 0+000 to Km 0+930, total length 11.600 Km in the state of Meghalaya on EPC mode under JICA Loan Assistance(Package-I ). Dated: 26-10-2020.
Technical Evaluation Result for Selection of Manpower Placement Agency for providing services of Civil Engineers at NHIDCL Headquarters, New Delhi, its Site Offices, Project Monitoring Units (PMUs) and Regional Offices (ROs) of NHIDCL across India. Dated: 26-10-2020.
Technical Evaluation Result for Construction of 2 laning with paved shoulder of new greenfield alignment from Chochenpheri at km. 52+000 to Helipad near Menla at km. 82+000 of Rhenok – Menla spur (NH-717B) Package-IIIA on EPC Basis under SARDP-NE Phase ‘A’ in the State of Sikkim. Dated: 23-10-2020.
Technical Evaluation Result for Construction and upgradation of existing road to 2-lane with Paved shoulder from km. 37+600 (New Rolep Bridge) to km. 52+000 (Chochenpheri) of Rhenok – Menla spur (NH-717B) Package-II C on EPC Basis under SARDP-NE Phase ‘A’ in the State of Sikkim. Dated: 23-10-2020.
Technical Evaluation Result for Construction and Installation of prefabricated Office cum Residence in the States of Arunachal Pradesh, Sikkim & Uttarakhand in high altitude remote areas. Dated: 20-10-2020.
Technical Evaluation Result for Construction and Installation of prefabricated Office cum Residence in the States of Himachal Pradesh & Union Territory of Ladakh in high altitude remote areas. Dated: 20-10-2020.
Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF: (i) Construction of two lane with hard shoulders of Arrowa-Khupa-Hayuliang Section of NH113 from Ch 68.550 Km to 91.633 in the state of Arunachal Pradesh on EPC Mode under NH(O)-NE. (ii) Construction of two lane with hard shoulders of Demwe-Brahmkund section of NH-13 from Ch 0.000 Km to 18.464 in the state of Arunachal Pradesh on EPC Mode under NH(O)-NE. Dated: 20-10-2020.
Technical Evaluation Result for Special repair of NH 702-D, Mokokchung-Mariani Road (from Km 0.000 to 63.000 Km) [Total length – 63.00 Km] in the state of Nagaland for the FY 2020-21. Dated: 19-10-2020.
Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for construction to 2-Lane Tura Bypass between existing km 95+00 to km 101+00 of NH-51 on EPC mode in the State of Meghalaya. Dated: 16-10-2020.
Technical Evaluation Result for Ordinary Repair of NH-08 from Km 436.700 to Km 437.500, Km 456.540 to Km 458.040 & Km 465.00 to Km 479.440 (Total Length = 16.740 Km) in the state of Tripura in the FY 2020-21 on item rate basis. Dated: 16-10-2020.
Technical Evaluation Result for Ordinary repair of NH 208 from 7th Mile to Amarpur tri junction Km 150.000 to Km 188.615 Total length 38.615 km in the State of Tripura in the year of 2020-21 on item rate basis. Dated: 16-10-2020.
Technical Evaluation Result for Consultancy Services for Authority’s Engineer for& Supervision of Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 66+000 to km 81+000 (Design Chainage 65+923 to 80+930) of Dokmoka – LoringThepi Section (Package-3) of NH-29 in the state of Assam under Bharatmala Pariyojna on EPC mode. Dated: 15-10-2020.
Technical Evaluation Result for Consultancy Services for Authority’s Engineer for Supervision Improvement/ widening to 2 lane with earthern shoulder from of Ranikor-BaghmaraMaheshkola road section from Ranikor to Nongjri existing km 0+000 to km 31+700 (design length – 33.250km) on EPC mode in the state of Meghalaya (Package-I). Dated: 15-10-2020.
Technical Evaluation Result for Ordinary Repair of NH -37 of Imphal-Jiribam Road (Km 3.00 to Km 75.00) [Total Length = 72.00 Km] in the state of Manipur in the year 2020-2021. Dated: 13-10-2020.
Technical Evaluation Result for Providing & Installation of Road Safety Measures by fixing of Traffic Sign Board, Construction of Metal Beam Crash Barrier, Road Stud & Road Marking on Shillong – Dawki road of NH-44 in the State of Meghalaya. Dated: 12-10-2020.
Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for 2 laning of Aizawl Bypass including Tunnel (Connecting Sairang on NH306 to NH-02) in the State of Mizoram under Bharatmala Pariyojna. Dated: 09-10-2020.
Technical Evaluation Result for Ordinary repair of NH- 208 from (Boarder of Dhalai and Khowai District) to (Nripen Chakraborty Chowmuhani, Khowai) (Km 85.200 to Km. 108.600) [Total length 23.400 km.] in the State of Tripura in the year of 2020-21 on item rate basis. Dated: 08-10-2020.
Technical Evaluation Result for Construction of 4 (Four) Minor Bridges at Km 21.717, Km 23.150, Km 88.300 7 Km 92.100 on NH-4 in the Union Territory of Andaman & Nicobar Islands on EPC basis (3 rd Call). Dated: 07-10-2020.
Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for construction to 2-Lane Tura Bypass between existing km 95+00 to km 101+00 of NH-51 on EPC mode in the State of Meghalaya. Dated: 05-10-2020.
Technical Evaluation Result for Earthwork in Formation, Road Work, Construction of Bridges, Blanketing,P. Way Linking works including Supply of P. Way Fittings and Track Ballast inconnection with Construction of Railway Siding from jogighopa Railway Stationto MMLP at Jogighopa, Distt. – Bongaigaon, Assam from Ch. 00 to 3760 – PackageIII of MMLP – Third Call. Dated: 01-10-2020.
Technical Evaluation Result for Authority’s Engineer for Improvement and Widening to two lane with paved shoulder of Kailashahar – Khowai section of NH-208 in the state of Tripura on Engineering, Procurement & Construction (EPC) mode – starting near Kirtanthali (near Kailashahar town) at km 21.100 and ending near Ganki in Khowai district at km 101.300 under JICA ODA loan Phase-IV on Engineering, Procurement, Construction (EPC) Mode. Dated: 01-10-2020.
Technical Evaluation Result for Improvement/Widening to 2 Lane with Earthen Shoulder of RanikorMaheshkola-Baghmara road section from Rongara to Panda, existing chainage from km 102+345 to km 119.810 (design Chainage from km 96+000 to km 112.300) design length-16.30km on EPC Mode under ARD-NE ‘Phase-A’in the State of Meghalaya. Dated: 29-09-2020.
Technical Evaluation Result for Improvement/Widening to 2 Lane with Earthen Shoulder of RanikorMaheshkola-Baghmara road section from Kanai – Rongara, existing chainage from km 85+970 to km 102+345 (design Chainage from km 81+100 to km 96+000) design length-14.763 km on EPC Mode under SARDP-NE Phase-A in the State of Meghalaya. Dated: 29-09-2020.
Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF: (i) Construction and up gradation of 4 lane of existing 2 lane with paved shoulder from Hapachara to Tulungia road of NH-117 of existing km 0.00 to km 14.050 and (Design km 0.000 to km 14.660), (Design length – 14.660 km) on EPC basis in the state of Assam. (ii) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 75.330km to Ch.88.000 km (Design Ch.71.800 to Ch.84.100) of Jogighopa Bridge Approach (Near Pancharatna) – Agia (Near Nichinta) Section (Package-6) of Bilasipura- Guwahati road (NH-17) in the state of Assam on EPC mode. Dated: 29-09-2020.
Technical Evaluation Result for Upgradation of existing road to 2-Lane with Paved Shoulder from Kohima to Mao from Km 185.540 to Km 211.709 (Design length – 26.249) of NH -39 (New NH – 02) under Bharatmala NH(O) – TSP in the state of Nagaland in EPC mode. Dated: 29-09-2020.
Technical Evaluation Result for Part Design, Construction, Operation & Maintenance (For a period of 5 years) of Fully Automatic Multi-level Parking System at Central Civil Secretariat, Itanagar, Arunachal Pradesh. Dated: 28-09-2020.
Technical Evaluation Result for Consultancy services for (i) preparation of DPR for Development of Self-Sustainable Bus Port at Udaipur (Tripura), Baddi (Himachal Pradesh) and Port Blair (Andaman and Nicobar Islands) (ii) Supervision of Development of Self-Sustainable Bus Port at Ramnagar, Uttarakhand AND Empanelment of Consultants for Project Management Consultancy for preparation of Pre-feasibility Report, DPR and carrying out Supervision work for Development of Self-Sustainable Bus Port at various States/UTs throughout the country. Dated: 25-09-2020.
Technical Evaluation Result for work of Construction of two-lane with hard shoulders of Demwe-Brahmkund section of NH-13 from Ch 0.000 Km to 18.464 in the state of Arunachal Pradesh on EPC Mode under NH(O)- NE. Dated: 25-09-2020.
Technical Evaluation Result for Restoration and Repair of RCC Bridge at Imphal-Jiribam Road of NH-37 at Ch: 132.465 (Old Ch: 137.00) in the state of Manipur in the FY 2020-21. Dated: 24-09-2020.
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of (i) Construction of two lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) From existing km 7.880 (near Chedama Junction) to existing km 30.474 (near Chakahabama) [Design Km 7.88 to design Km 29.6] [Design Length – 21.72 Km] in the state of Nagaland Under Bharatmala Pariyojana on EPC Mode (Package-I) (ii) Construction of two lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) From existing km 30.474 (near Kidwema road Chakahabama) to existing km 53.220 (near Kikruma Village) [ Design Km 29.6 to design Km 51.5] [Design Length – 21.90 Km] in the state of Nagaland under Bharatmala Pariyojna on EPC Mode (Package II)” (iii) Construction of two lane with hard shoulder of Kohima-jessami Road on NH-29 (Old NH-150) from existing km 53.220 (near Kikruma Village) to existing km 76.320 (near Mesulumi Village) [ Design Km 51.5 to design Km 74.2] [Design Length – 22.7 Km] in the state of Nagaland Under Bharatmala Pariyojna on EPC Mode (Package III). Dated: 24-09-2020.
Technical Evaluation Result for Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 10.500 to design Km 21.00 [Design Length – 10.500 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package II) Opening of Financial bid Dated: 23-09-2020.
Technical Evaluation Result for Empanelment of consultants for Waste Management consisting of collection, handling, storage and transportation of Municipal Solid Waste to the designated waste processing site. Dated: 22-09-2020.
Technical Evaluation Result for Construction of 2-lane specification road with paved shoulder including tunnel (300m) at Ranbangla on NH-510 (Singrtam-Tarku-Rabongal-Legaship-Gyalshing) Package-III (Design Chainage from Km 32.500 to Km 33.600) under SARDP-NE “A” on EPC basis in the State of Sikkim – Result of Technical Evaluation – reg.Dated: 16-09-2020.
Technical Evaluation Result Consultancy services for Authority’s Engineer for Supervision of (i) Construction of two lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) From existing km 7.880 (near Chedama Junction) to existing km 30.474 (near Chakahabama) [Design Km 7.88 to design Km 29.6] [Design Length – 21.72 Km] in the state of Nagaland Under Bharatmala Pariyojana on EPC Mode (Package-I) (ii) Construction of two lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) From existing km 30.474 (near Kidwema road Chakahabama) to existing km 53.220 (near Kikruma Village) [ Design Km 29.6 to design Km 51.5] [Design Length – 21.90 Km] in the state of Nagaland under Bharatmala Pariyojna on EPC Mode (Package II)” (iii) Construction of two lane with hard shoulder of Kohima-jessami Road on NH-29 (Old NH-150) from existing km 53.220 (near Kikruma Village) to existing km 76.320 (near Mesulumi Village) [ Design Km 51.5 to design Km 74.2] [Design Length – 22.7 Km] in the state of Nagaland Under Bharatmala Pariyojna on EPC Mode (Package III). Dated: 16-09-2020.
Final Shortlisted Result Improvement into two-lane with paved shoulder/four-lane of NH-40 between Shillong to Dawki section including the construction of Dawki bridge Design length = 63.91 Km (Ch. 0.000 To Ch. 71.520 of NH-40 & Ch. 0.000 to Ch. 0.900 of NH-44) (Package-I, II, IV & V) excluding pynursula bypass in Meghalaya under JICA loan assistance (2nd Phase) on Engineering, Procurement, Construction (EPC) Mode. Dated: 15-09-2020.
Technical Evaluation Result for Rehabilitation and Up-gradation of road from design km 31.300 to km 45.300 (Total length : 14.000 km) of Agartala – Khowai section on NH 108 B to two lane with paved shoulder in the state of Tripura on EPC basis (package III) – Financial Bid Opening – Reg. Dated: 15-09-2020.
Technical Evaluation Result for Construction of Chhiahtlang and Serchhip bypass (Package-1) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on EPC mode, with JICA loan assistance. Dated: 14-09-2020.
Technical Evaluation Result for selection of manpower Placement Agency for providing services of Middle Management Personnel (such as IT, Charted accountant, Legal and other professional staff) at NHIDCL Headquarters, New Delhi, Project Monitoring Units(PMUs) and Regional Offices (ROs) of NHIDCL across India. Dated: 11-09-2020.
Technical Evaluation Result for Construction of 2-lane specification road with Paved shoulder asre-alignment (Greenfield alignment) of existing stretch between Legship to Gyalshing of NH-510 (Design chainage from km 75.000 to km 90.210) under SARDP-NE Phase’A’ on EPC mode in the state of Sikkim (Package-VI) – reg. Dated: 11-09-2020.
Technical Evaluation Result for Construction of 2-lane specification road with Paved shoulder as re-alignment (Greenfield alignment) of existing stretch between Legship to Gyalshing of NH-510 (Design chainage from km 58.840 to km 75.00) under SARDP-NE Phase’A’ on EPC mode in the state of Sikkim (Package-V) – reg. Dated: 11-09-2020.
Technical Evaluation Result for Consultancy Services for 09 Months for Supervision of “Restoration and Repairs of NH-129A from 7th mile junction, Dimapur to Mhaikam (Km 0.0 to 16.0) [Length=16 Km] and from Manipur/Nagaland Border (Dzuko Bridge) to Mhainamtsi (Km 0.0 to Km 39.0) [Length=39 Km] in the State of Nagaland in the FY 2020-21.Dated: 10-09-2020.
Technical Evaluation Result for Construction of 2 laning with Hard shoulder of Peren- Dimapur section on NH 129A from Design Km 109.494 to Km 126.775 (Length – 17.281 Km) in the state of Nagaland on EPC mode (Package I) under NH(O)- TSP. Dated: 08-09-2020.
Technical Evaluation Result for Construction of 2-lane specification road with Paved shoulder as re-alignment (Greenfield alignment) of existing stretch between Legship to Gyalshing of NH-510 (Design chainage from km 58.840 to km 75.00) under SARDP-NE Phase’A’ on EPC mode in the state of Sikkim (Package-V) – reg. Dated: 08-09-2020.
Technical Evaluation Result for Construction of 2-lane specification road with Paved shoulder asre-alignment (Greenfield alignment) of existing stretch between Legship to Gyalshing of NH-510 (Design chainage from km 75.000 to km 90.210) under SARDP-NE Phase’A’ on EPC mode in the state of Sikkim (Package-VI) – reg. Dated: 08-09-2020.
Technical Evaluation Result for Empanelment of consultants for Comprehensive Flood Management or River Training works/Canal Works/River Front Development to be carried out in various part of India including J&K- Technical result-reg. Dated: 07-09-2020
Technical Evaluation Result for Restoration and Repair (R&R) for two lane road of NH-208, from Saikabari to Lentibari (Boarder of Dhalai and Khowai District) (Ch 61.00 Km to Ch 85.200 km) (Total Length=24.200 Km) in the state of Tripura in the FY 2020-21 on percentage rate basis-Uploading of technical result-reg. Dated: 07-09-2020
Technical evaluation for Construction of 2 laning with Hard shoulder of Peren- Dimapur section on NH 129A from Design Km 109.494 to Km 126.775 (Length – 17.281 Km) in the state of Nagaland on EPC mode (Package I) under NH(O)- TSP.Technical Evaluation Result for Rehabilitation and Up-gradation to 2 lane with Paved shoulder of NH-510 (Singtam-Tarku-Rabongla-Legship-Gyalshing). Dated: 04-09-2020.
Technical Evaluation Result for Rehabilitation and Up-gradation to 2 lane with Paved shoulder of NH-510 (Singtam-Tarku-Rabongla-Legship-Gyalshing) Package -IV (Design Chainage from Km 33+600 to Km 58+840) in the state of Sikkim in EPC mode. Dated: 28-08-2020.
Technical Evaluation Result for Improvement/ Up-gradation of existing 2-Lane Road to 4-Lane Divided Highway from TaphuKuki to Daili section (Pkg 4A) of Imphal-Kohima road (NH-39) (Design Chainage from Km262+175 to Km274+610) in the state of Manipur on EPC Mode.Dated: 28-08-2020.
Technical Evaluation Result for Improvement/ Up-gradation to 4-Lane Divided Highway from Kuraopokpi to Sekmai section (Pkg-5A) of Imphal Kohima Road (NH-39) (Design Chainage from Km 287+000 to Km 297+700) in the state of Manipur. Dated: 27-08-2020.
Technical Evaluation Result for Improvement/ Up-gradation of existing 2-Lane Road to 4-Lane Divided Highway from Daili to Kuraopokpi section (Pkg-4B) of Imphal Kohima Road (NH-39) (Design Chainage from Km 274+610 to Km 287+000) in the state of Manipur on EPC Mode. Dated: 27-08-2020.
Technical Evaluation Result for Consultancy services for (i) preparation of DPR for Development of Self-Sustainable Bus Port at Udaipur (Tripura), Baddi (Himachal Pradesh) and Port Blair (Andaman and Nicobar Islands) (ii) Supervision of Development of Self-Sustainable Bus Port at Ramnagar, Uttarakhand AND Empanelment of Consultants for Project Management Consultancy for preparation of Pre-feasibility Report, DPR and carrying out Supervision work for Development of Self-Sustainable Bus Port at various States/UTs throughout the country. Dated: 27-08-2020.
Technical Evaluation Result for Construction of two-lane with hard shoulders of Arrow-Khupa-Hayuliang Section from Ch 68.550 Km to 91.633 in the state of Arunachal Pradesh on EPC Mode under NH(O)-NE. Dated: 26-08-2020.
Technical Evaluation Result for Strengthening & Upgradation of existing carriageway to the intermediate lane from Km 0.000 to Km 42.820 of length 42.820Kms on Baramulla-Gulmarg section of NH-701A in the Union Territory of Jammu & Kashmir on EPC mode. Dated: 26-08-2020.
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 75.330km to Ch.88.000 km (Design Ch.71.800km to Ch.84.100km) of Jogighopa Bridge Approach (Near Pancharatna) – Agia (Near Nichinta) Section (Package-6) of Bilasipura- Guwahati road (NH 17) in the state of Assam under Bharatmala Pariyojana on EPC mode. Dated: 20-08-2020.
Technical Evaluation Result for widening and upgradation to 2 lane with paved shoulder configuration and geometric improvement from km 298.000 to km 339.000 on Aizawl-Tuipang Section of NH-54 in the State of Mizoram with JICA loan assistance. Dated: 20-08-2020.
Technical Evaluation Result for Construction of (i) Connecting road from Z-Morh Tunnel to Zojila Tunnel and (ii) 14.150 km long bi-directional tunnel across Zojila Pass on Sonamarg-Kargil section of NH-01 on EPC mode in the Union Territories of J&K and Ladakh. Dated: 18-08-2020.
Technical Evaluation Result for work of Construction and up-gradation of existing road to 2-lane with paved shoulder of Bagrakot-Kafer section of NH-717A from km 13.000 to km 25.600 on EPC basis under SARDP-NE Phase’A’ in the state of West Bengal (Package IV B) – 2nd Call. Dated: 14-08-2020.
Technical Evaluation Result for Construction of two-lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 32.00 to design Km 43.454 [Design Length – 11.454 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package IV). Dated: 29-07-2020.
Technical Evaluation Result for Construction of two-lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 0.00 to design Km 10.500 [Design Length – 10.500 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package I). Dated: 29-07-2020.
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 66+000 to km 81+000 (Design Chainage 65+923 to 80+930) of Dokmoka – LoringThepi Section (Section 3) of NH-29 in the state of Assam under Bharatmala Pariyojna on EPC mode. Dated: 28-07-2020.
Technical Evaluation Result for Additional Work for Construction of Landslide Protection Gallery, Slope Protection works including Cattle Fence, Restoration of Irrigation Channel and River Protection Work at Bareti, Uttarkashi from Km 100.300 to km 101.060 of NH-34 on EPC basis in the State of Uttarakhand. Dated: 24-07-2020.
Technical Evaluation Result for Restoration of road by construction of Protection Walls, Cross Drainage Works & Fixtures of Road Safety Furniture from Km 0.000 to Km 170.000 (NH244) on Batote-KishtwarSinthanpass road in UT of Jammu & Kashmir.Dated: 23-07-2020.
Technical Evaluation Result for Construction and up gradation of existing road to 2-lane with paved shoulder including geometric improvement of section from start of Pedong Bypass to Reshi Border Km 79+700 to Km 96+254 of NH-717A under SARDP-NE Phase ‘A’ on EPC basis in the state of West Bengal- Package VB (2nd Call). Dated: 22-07-2020.
Opening of Financial Bid for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B (Pkg IA, IB, IIA, IIB, IVA & IVB) in the State of Manipur.Dated: 21-07-2020.
Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for “construction to 2-Lane Tura Bypass between existing km 95+00 to km 101+00 of NH-51 on EPC mode in the State of Meghalaya. Dated: 21-07-2020.
Technical Evaluation Result for (i)Construction/ up-gradation of existing road to 2-lane with Paved shoulder from km 40.00 (Kafer) to km 61.100 (Lava More) of the Kafer to Reshi border section of NH-717A on EPC Basis under SARDP-NE Phase A in the State of West Bengal (PKG-VA) & (ii) construction and upgradation of existing road to 2 lane with paved shoulder including geometric improvement of section from start of Pedong bypass to Reshi border of NH-717A from km 79.700 to km 96.254 on EPC basis on SARDP-NE Phase-A in the State of West Bengal (PKG-VB). Dated: 20-07-2020.
Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF (i) Rehabilitation and up-gradation of road from design km 0.000 to km 16.290 (Total length: 16.290 km) of Manu-Lalchara section on NH 44A to two lane with paved shoulder (ii) Rehabilitation and up-gradation of road from km 46.597 to km 66.845 (Total length: 20.248 km) of Kanchanpur- Vaghmun section on NH-44A to two lane with paved shoulder in the state of Tripura on EPC basis. Dated: 20-07-2020.
Technical Evaluation Result for Rehabilitation and up-gradation of road from design km 0.00 to km 36.460 (Package-I, II & III) of Kailashahar – Kurti Bridge section on NH 208 A to two lanes with paved shoulder (ii) Rehabilitation and up- gradation of road from km 0.000 to km 18.600 (Total length: 18.600 km) of Kumarghat-Kailashahar section on NH-208 to two lane with paved shoulder in the state f Tripura on EPC Basis. Dated: 20-07-2020.
Technical Evaluation Result forRequest for Proposal for Empanelment of consultants for the Augmentation of Water Supply Scheme including distribution network/Retrofitting and Rehabilitation of the existing water supply network in various parts of India including J&K. Dated: 13-07-2020.
Technical Evaluation Result for Construction of Hnathial bypass (Package-2) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on Engineering, Procurement and Construction (EPC) mode, with Japan International Cooperation Agency (JICA) loan assistance. Dated: 10-07-2020.
Technical Evaluation Result for Construction of Lawngtlai bypass (Package-3) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on Engineering, Procurement and Construction (EPC) mode, with Japan International Cooperation Agency (JICA) loan assistance. Dated: 09-07-2020.
Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Construction and up gradation of 4 lane of existing 2 lane with paved shoulder from Hapachara to Tulungia road of NH-117 of existing Km 0.00 to Km 14.050 and (Design KM 0.000 to Km 14.660), (Design length – 14.660 Km) on EPC basis in the State of Assam under Bharatmala Pariyojana in Economic Corridors. Dated: 08-07-2020.
Technical Evaluation Result for Restoration/Rehabilitation of Churachandpur-Tipaimukh Road (NH-150) Km 9.00 to Km 70.00 (Total Length-61 km) in the state of Manipur. Dated: 08-07-2020.
Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF (i) Improvement and Widening to two lanes with paved shoulders of Jolaibari – Belonia (from km 0.000 to km 21.412) section of NH-108A in the state of Tripura & (ii) Strengthening of Churabari-Agartala section with paved shoulder of NH-08 (74.856km) in the State of Tripura on EPC Mode. Dated: 08-07-2020.
Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF (i) Rehabilitation and up-gradation of road from design km 6.50 to km 45.300 (Package-I, II & III) of Agartala – Khowai section on NH 108 B to two lanes with paved shoulder (ii) Improvement and Widening to two laning with paved shoulder of Khayerpur –Amtali (Agartala) Section from km 0.00 to km 12.900 of NH-8 in the State of Tripura on EPC basis. Dated: 06-07-2020.
Technical Evaluation Result for Ordinary Repair of NH -102A from Koubrulekha- Tendongyan (Km 287.500 to Km 304.00) [Total Length = 16.500 km] in the state of Manipur in the year 2020-2021. Dated: 03-07-2020.
Technical Evaluation Result for Restoration and Repair of NH102A from Dungrai JunctionLamlang Gate (Km 0.00 to Km 11.60) [Total Length = 11.60 km] in the state of Manipur in the year 2020- 2021(2nd Call) Dated: 03-07-2020.
Financial Bid Opening for Consultancy Services for Preparation, Submission & Clearance of Land Acquisition Plan, Utility Shifting proposals for 2 lane widening Kohima – Jessami from Km 7.88 to Km 117.20 based on DPR prepared by M/s Feedback Infra Pvt. Ltd in the State of Nagaland. Dated: 26-06-2020.
Financial Bid Opening for Consultancy services for Authority’s Engineer for Supervision of (i) Widening and Improvement of Imphal-Moreh section from Km 395.680 to Km 425.411 to Two (2) lane with paved shoulders on NH-39 in the State of Manipur (Package-3) on EPC mode under ADB (SASEC) loan under Tranche-3. (ii) Construction of Moreh Bypass to Two Lane with paved shoulder from Km 421.950 to Km 425.411 (Length = 2.52 Km) on NH-39 near Indo-Myanmar border in the State of Manipur on EPC mode. (iii) Widening/Strengthening to Two laning with hard shoulder of Pallel- Chandel section From Km 0.000 to Km 18.292 of NH-102C in the state of Manipur on Engineering, Procurement & Construction (EPC) Mode. Dated: 25-06-2020.
Financial Bid Opening for Widening and Improvement of Imphal-Moreh section from Km 395.680 to Km 425.411 to Two (2) lane with paved shoulders on NH-39 in the State of Manipur (Package-3) on EPC mode under ADB (SASEC) loan. Dated: 25-06-2020.
Technical Evaluation Result for Restoration and Repair Work of Batote-Kishtwar- Sinthan Pass road in the Union Territory of Jammu and Kashmir from km 155.00 to km 170.00 (Total Length under R&R = 15 km) and other Misc. works. Dated: 25-06-2020.
Technical Evaluation Result for Provision of Paved Shoulder in Selected Length, Footpath, Road Safety & Road Furniture and other miscellaneous items from Rangpo to Ranipool from Km 52+000 to Km 80+000 of NH-10 in the State of Sikkim on Item Rate Contract. Dated: 24-06-2020.
Financial Bid Opening for Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Km 48.587 to Km 69.875 (Package-2B) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode” under Bharatmala. Dated: 22-06-2020.
Financial Bid Opening for Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Km 130+000 to Km 141+029 (Package-4B) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode.” under Bharatmala. Dated: 22-06-2020.
Financial Bid Opening for Restoration and Repairs of NH-129A from Manipur/Nagaland Border (Dzuko Bridge) to Mhainamtsi (Km 0.0 to 39.0) [Length=39 Km] in the State of Nagaland in the FY 2020-21. Dated: 16-06-2020.
Financial Bid Opening for Restoration and Repairs of NH-129A from 7th-mile junction, Dimapur to Mhaikam (Km 0.0 to 16.0) [Length=16 Km] in the State of Nagaland in the FY 2020-21. Dated: 16-06-2020.
Financial Bid Opening for Construction of 4-Lane Bridge over Irang River on Imphal- Jiribam road section (95.500Km) NH-37 (Old NH-53) in the State of Manipur on EPC mode” under NH(O). Dated: 10-06-2020.
Technical Evaluation Result for Construction and upgradation of existing road to 2-lane with paved shoulder of Bagrakot-Kafer section of NH-717A from Km. 13.000 to Km. 25.600 on EPC basis under SARDP-NE Phase A in the State of West Bengal (Package-IV B).. Dated: 08-06-2020.
Technical Evaluation Result for Ordinary Repair of NH -102A from Toloi-Tadubi (Km 28.00 to Km 115.00) km [Total Length = 87.00 km] in the state of Manipur in the year 2020-2021. Dated: 08-06-2020.
Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of Highway Tunnel including approaches across Shinkun La, Tanglang La & Lachalung La in the Union Territory of Ladakh. Dated: 03-06-2020.
Technical Evaluation Result for Development of External Trunk Connectivity and Internal Infrastructure Works at Multi-Model Logistics Park at Jogighopa in the state of Assam on Engineering, Procurement & Construction (EPC) Mode” (Package-I: Road and Utility Works). Dated: 03-06-2020.
Technical Evaluation Result for Development of Internal Infrastructure Works at Multi-Model Logistics Park at Jogighopa in the state of Assam on Engineering, Procurement & Construction (EPC) Mode (Package-II). Dated: 03-06-2020.
Technical Evaluation Result Consultancy services as Authority’s Engineer for Supervision of “Rehabilitation and Up-gradation to 2 lane with paved shoulders of Seling-Dulte section (Economic Corridor) of NH-6 from Existing chainage Km 0+000 to Km 69+015 (Design Chainage Km 0+000 to Km 62+200) in the State of Mizoram under Bharatmala Pariyojna on EPC mode.Dated: 28-05-2020.
Technical Evaluation Result Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of Highway Tunnel including approaches across Shinkun La, Tanglang La & Lachalung La in the Union Territory of Ladakh. Dated: 22-05-2020.
Technical Evaluation Result of the tender “M&R works for Akhegwo to Jessami (Aakash Bridge) of NH-202 from Km.283+000 to Km. 326+000, L=43 Km in the State of Nagaland on Item Rate and Work Order Basis. Dated: 21-05-2020.
Technical Evaluation Result for providing telecom services at NHIDCL Headquarter, Corporate Office, Regional Offices, Project Monitoring Unit and Site Office (Second Call). Dated: 19-05-2020.
Technical Evaluation Result for Restoration of Road by construction of Pucca Drain in selected stretches from km 0.000 to km 170.000 on Batote -Kishtwar- Sinthan Pass Road on NH-244 in the Union Territory of Jammu & Kashmir. Dated: 15-05-2020.
Technical Evaluation Result for Beautification of Indira Bye-pass Road from Km 0.000 (Amdo-Golai) to Km 10.117 (Bhojoghari-Phatak) in the state of Sikkim on Item Rate Basis. Dated: 14-05-2020.
Technical Evaluation Result for Routine maintenance of Changtongya – Longleng road (NH 702 New) from existing km 00.000 to km 29.530 (length 29.530 km) in the State of Nagaland on Item Rate Basis.Dated: 14-05-2020.
Technical Evaluation Result for Restoration of Road by way of snow clearance, clearance of consolidated slips, surface boulders, side drain, culverts, including the construction of Retaining wall and Breast wall in selected stretches on Goha-Khellani Road (Ch. 0.000 to Ch. 29.800) of new alignment of NH-244 in the Union territory of Jammu & Kashmir. Dated: 13-05-2020.
Technical Evaluation Result for Maintenance of Kohima to Mao, (Nagaland/ Manipur border) section of NH-2 from Km. 185.000 to Km. 212.700, L=27.700 km in the State of Nagaland on Item Rate and Work Order Basis.Dated: 12-05-2020.
Technical Evaluation Result for Restoration of Road by providing & laying of WBMIII, Bituminous Macadam & Bituminous Concrete including construction of Protection walls, Cross Drainage works in selected stretches& Fixtures of Road safety Furniture from K.m. 170.000 to K.m. 265.000 on Batote-Kishtwar-Sinthanpass road (NH-244) in the Union territory of Jammu & Kashmir.Dated: 02-05-2020.
Technical Evaluation Result for Routine maintenance of Kohima-Jessami road NH-29 (Old NH 150) from km 0.000 to km 120.000 (length 120 km) in the State of Nagaland on Item Rate Basis and Work Order Basis- Retender.Dated: 09-04-2020.
Technical Evaluation Result for Construction and up gradation of 4 lane of existing 2 lane with paved shoulder from Hapachara to Tulungia road of NH-117 of existing Km 0.00 to Km 14.050 and (Design KM 0.000 to Km 14.660), (Design length – 14.660 Km) on EPC basis in the State of Assam under Bharatmala Pariyojana in Economic Corridors.Dated: 24-03-2020.
Technical Evaluation Result for Maintenance of NHIDCL Website & Handling of Social Media accounts of NHIDCL.Dated: 23-03-2020.
Technical Evaluation Result for RFP for Widening /Improvement to 2 (Two) Lane with Earthen Shoulder of Yaingangpokpi-Finch Corner Section from km 0.00 to 16.900 (length 16.900km) of NH 202 in the State of Manipur on EPC mode. Dated: 23-03-2020.
Technical Evaluation Result for Widening /Improvement to 2 (Two) Lane with Earthen Shoulder of Yaingangpokpi-Finch Corner Section from km 16.900 to 30.970 (length 14.070km) of NH 202 in the State of Manipur on EPC mode. Dated: 23-03-2020.
Technical Evaluation Result for Short Term Improvement of the Road from Km 0.00 (Sirwani Road) to Km 3.00 (Dalep Turning) of NH-510 in the State of Sikkim on Item Rate Basis. Dated: 21-03-2020.
Technical Evaluation Result for Beautification of Indira Bye-pass Road from Km 0.000 (Amdo-Golai) to Km 10.117 (Bhojoghari Phatak) in the state of Sikkim on Item Rate Basis. Dated: 21-03-2020.
Technical Evaluation Result for Construction of two lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) from existing km 76.320 (near Mesulumi Village) to existing km 98.380 (near Chizami Village) [Design Length – 21.50 Km] in the state of Nagaland Under Bharatmala Pariyojana on EPC Mode (Package IV). Dated: 20-03-2020.
Technical Evaluation Result for Construction of two lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) from existing km 98.380 (near Chizami Village) to existing km 120.367 (Nagaland/Manipur Border) [Design Km 95.700 to design Km 117.200] [Design Length – 21.500 Km] in the state of Nagaland Under Bharatmala Pariyojna on EPC Mode (Package V).Dated: 20-03-2020.
Technical Evaluation Result for Rehabilitation and up-gradation of road from design km 6.500 to km 19.300 (Total length: 12.800 km) of Agartala – Khowai section on NH 108 B to two lane with paved shoulder in the state of Tripura on EPC basis.Dated: 20-03-2020.
Technical Evaluation Result for Rehabilitation and up-gradation of road from design km 19.300 to km 31.300 (Total length: 12.000 km) of Agartala – Khowai section on NH 108 B to two lane with paved shoulder in the state of Tripura on EPC basis. Dated: 20-03-2020.
Technical Evaluation Result for Rehabilitation and up-gradation of road from design km 31.300 to km 45.300 (Total length: 14.000 km) of Agartala – Khowai section on NH 108 B to two lane with paved shoulder in the state of Tripura on EPC basis. Dated: 20-03-2020.
Technical Evaluation Result for Four Laning of NH-37 from Nagaon By-pass to Teliagaon (km 278.600 to km 288.600) in the state of Assam under SARDP-NE Phase-A on EPC mode – Package – 1. Dated: 18-03-2020.
Technical Evaluation Result for Widening / Strengthening to Two laning with hard shoulder of Pallel- Chandel section From Km 0.000 to Km 18.292 of NH-102C in the state of Manipur on Engineering, Procurement & Construction (EPC) Mode under NH(O). Dated: 17-03-2020.
Technical Evaluation Result for Four Laning of NH-37 from Teliagaon to Rangagara (km 288.600 to km 297.000) in the state of Assam under SARDP-NE Phase-A on EPC mode – Package – 2. Dated: 17-03-2020.
Financial Bid Opening for Construction of two-lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) From existing km 30.474 (near Kidwema road Chakahabama) to existing km 53.220 (near Kikruma Village) [ Design Km 29.6 to design Km 51.5] [Design Length – 21.90 Km] in the state of Nagaland under Bharatmala Pariyojna on EPC Mode (Package II). Dated: 16-03-2020.
Technical Evaluation Result for Rehabilitation and Up-gradation of Dergaon Town to 4 laning from km. 426.800 to km 437.400 on NH-37 in the state of Assam on Engineering, Procurement & Construction (EPC) Mode. Dated: 16-03-2020.
Technical Evaluation Result for the project of Construction of two lane with hard shoulder of Kohima-jessami Road on NH-29 (Old NH-150) from existing km 53.220 (near Kikruma Village) to existing km 76.320 (near Mesulumi Village) [ Design Km 51.5 to design Km 74.2] [Design Length – 22.7 Km] in the state of Nagaland Under Bharatmala Pariyojna on EPC Mode (Package III). Dated: 11-03-2020.
New Technical Evaluation Result for the project of Rehabilitation of section from Km 298.00 to Km 330.662 (Karala to Kalipur) of NH-04 to Intermediate lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands (Total Length 32.36 km) on EPC Mode (Package- VIII)[Re-Tender]. Dated: 06-03-2020.
Technical Evaluation Result for the project of Appointment of Creative Agency By The National Highways & Infrastructure Development Corporation Ltd. (NHIDCL). Dated: 06-03-2020.
Financial opening letter for the project of Improvement and Widening to two lanes with paved shoulders of Jolaibari – Belonia (from km 0.000 to km 21.412) section of NH-108A in the state of Tripura on Engineering, Procurement & Construction (EPC) mode. Dated: 03-03-2020.
Evaluation Result for Routine maintenance of KohimaJessami road NH-29 (Old NH 150) from km 0.000 to km 120.000 (length 120 km) in the State of Nagaland on Item Rate Basis. Dated: 26-02-2020.
Financial Bid Opening for Construction of two-Lane with hard shoulders of Changtongya – Longleng Road on EPC basis from existing Km 16.530 to Km 29.530 [Design Km. 18+779 to Km. 33+428] (Design Length –14+649 Km) in the state of Nagaland (Pkg-2) under NH (O) Plan . Dated: 25-02-2020.
Financial Bid Opening for Construction of two-Lane with hard shoulders of Changtongya Longleng Road on EPC basis from existing Km 0.0 to Km 16.592 [Design Km. 0+000 to Km. 18+779] (Design Length – 18.779 Km) in the state of Nagaland (Pkg-1)” under NH (O) Plan. Dated: 25-02-2020.
Financial Bid Opening for Special Protection Work on Rehabilitation and restoration of Sinking/Sliding Zone from Km 70+900 to Km 71+100 and Km 71+550 to Km 71+850 with JICA Technical Assistance including widening of Narrow Zone from Km 53+775 to Km 54+100 and from Km 63+045 to Km 63+470 on NH-10 (Rangpo To Ranipool section) in the State of Sikkim. Dated: 24-02-2020.
Technical evaluation result for the Authority’s Engineer for the Meghalaya project(Tura Dalu). Dated: 20-02-2020.
Technical evaluation result for Empanelment of Advertising Agencies for managing print media advertisements of National Highways & Infrastructure Development Corporation Limited in National and other dailies at DAVP or lesser rates. Dated: 19-02-2020.
Technical evaluation result for Empanelment of Consultants for preparation of Feasibility Report, Architectural & Structural Design of Automated Multilevel Car Parking System at various locations in India (2nd Phase). Dated: 17-02-2020.
Technical evaluation result for Construction of Bi-directional Tunnel at “Km 83” of Length 495 m including approaches road of 664 m and a Major Bridge of 110 m from Km 82+675 to Km 82+925 on NH-244 in Jammu & Kashmir on EPC mode. Dated: 05-02-2020.
Technical evaluation result for the Authority’s Engineer for the Meghalaya project(Tura Dalu). Dated: 03-02-2020.
Technical evaluation result for Hiring of Vehicles and drivers for the office use in NHIDCL, HQ, PTI Building, New Delhi on monthly rental basis as well as for as and when requirement.Dated: 16-01-2020.
Technical evaluation result for selection of Manpower Placement Agency for providing services of Office Staff (such as Stenographers, Office Assistants, Data Entry Operators, Multi-tasking Staff, etc.) at NHIDCL Headquarters, New Delhi. Dated: 09-01-2020.