GST No. 07AAECN7759E1Z7
CIN : U45400DL2014GOI269062
A+
A+
A+
A+
National Portal
English
National Highways & Infrastructure Development Corporation Ltd.
Ministry of Road Transport & Highways, Government of India
Home
About
About Us
Our Organisation
Who’s who
Our Mission
Our Vision
Honourable Minister’s Message
Annual Report
2021-2022
2020-2021
2019-2020
2018-2019
2017-2018
2016-2017
2015-2016
2014-2015
CSR
Annual Return of NHIDCL
2020
2021
2022
Skill Development Training Program
International Cooperation
RTI
GST Cell
MoA(Memorandum of Association) & Notices
Dispute Resolution Mechanism
Chief Vigilance officer (CVO)
Independent External Monitor (IEM)
Projects
Current Status
All States
Andaman & Nicobar
Arunachal Pradesh
Assam
Himachal Pradesh
Manipur
Meghalaya
Mizoram
Nagaland
Sikkim
Tripura
Union Territory of Jammu & Kashmir
Union Territory of Ladakh
Uttarakhand
West Bengal
Nepal
Project Archive
Maps
Andaman & Nicobar
Arunachal Pradesh
Assam
Himachal Pradesh
Manipur
Meghalaya
Mizoram
Nagaland
Sikkim
Tripura
Union Territory of Jammu & Kashmir
Union Territory of Ladakh
Uttarakhand
West Bengal
Nepal
e Book
NHIDCL 2016
NHIDCL 2015
Guidelines on LA
Infracon
INAM-Pro
INAM-Pro Brochure
BGMS
Sugampath
IT Task Force
Essential Safety for Hill Roads
Standardization of Reporting Responsibilities for AEs & IEs
Appropriate Technologies for Soil & Slope Stabilization
ePace
BIMS Brochure
eAccess
The Motor Vehicles Act, 1988
The Central Motor Vehicles Rules, 1989
Tenders
Current Tenders
Tender Archive
eAuction
Current eAuction
Archive eAuction
Black List / Debarment
Termination
Negative List
Non-Performer
List of Banks
Links
Bank of Ideas
NHIDCL Email
INAM-Pro
INFRACON
BG Management
Bhoomirashi
eDMS
eOffice
SAP
PMIS
BiMS
eProcurement
Grievance Redressal
CPGRAMS
ePACE
India Investment Grid (IIG)
eSamiksha Monitoring
eSamiksha Review
eSuvidha
Ministry of Road Transport & Highways
OCMS
VIP References
IAHE
National Highways Authority of India
IRC
Ministry of External Affairs
Ministry of Shipping
MSME SAMBANDH
Events
Images
Videos
Official Language Gallery
Web Portal Videos
Presentation
Employee Portal
Career
Current Openings
Opening Archive
Contact
Corporate Office
Details of NHIDCL Officers & Staff on Deputation/ Contract
Field Offices
Feedback
Home
About
About Us
Our Organisation
Who’s who
Our Mission
Our Vision
Honourable Minister’s Message
Annual Report
2021-2022
2020-2021
2019-2020
2018-2019
2017-2018
2016-2017
2015-2016
2014-2015
CSR
Annual Return of NHIDCL
2020
2021
2022
Skill Development Training Program
International Cooperation
RTI
GST Cell
MoA(Memorandum of Association) & Notices
Dispute Resolution Mechanism
Chief Vigilance officer (CVO)
Independent External Monitor (IEM)
Projects
Current Status
All States
Andaman & Nicobar
Arunachal Pradesh
Assam
Himachal Pradesh
Manipur
Meghalaya
Mizoram
Nagaland
Sikkim
Tripura
Union Territory of Jammu & Kashmir
Union Territory of Ladakh
Uttarakhand
West Bengal
Nepal
Project Archive
Maps
Andaman & Nicobar
Arunachal Pradesh
Assam
Himachal Pradesh
Manipur
Meghalaya
Mizoram
Nagaland
Sikkim
Tripura
Union Territory of Jammu & Kashmir
Union Territory of Ladakh
Uttarakhand
West Bengal
Nepal
e Book
NHIDCL 2016
NHIDCL 2015
Guidelines on LA
Infracon
INAM-Pro
INAM-Pro Brochure
BGMS
Sugampath
IT Task Force
Essential Safety for Hill Roads
Standardization of Reporting Responsibilities for AEs & IEs
Appropriate Technologies for Soil & Slope Stabilization
ePace
BIMS Brochure
eAccess
The Motor Vehicles Act, 1988
The Central Motor Vehicles Rules, 1989
Tenders
Current Tenders
Tender Archive
eAuction
Current eAuction
Archive eAuction
Black List / Debarment
Termination
Negative List
Non-Performer
List of Banks
Links
Bank of Ideas
NHIDCL Email
INAM-Pro
INFRACON
BG Management
Bhoomirashi
eDMS
eOffice
SAP
PMIS
BiMS
eProcurement
Grievance Redressal
CPGRAMS
ePACE
India Investment Grid (IIG)
eSamiksha Monitoring
eSamiksha Review
eSuvidha
Ministry of Road Transport & Highways
OCMS
VIP References
IAHE
National Highways Authority of India
IRC
Ministry of External Affairs
Ministry of Shipping
MSME SAMBANDH
Events
Images
Videos
Official Language Gallery
Web Portal Videos
Presentation
Employee Portal
Career
Current Openings
Opening Archive
Contact
Corporate Office
Details of NHIDCL Officers & Staff on Deputation/ Contract
Field Offices
Feedback
Home
About
About Us
Our Organisation
Who’s who
Our Mission
Our Vision
Honourable Minister’s Message
Annual Report
2021-2022
2020-2021
2019-2020
2018-2019
2017-2018
2016-2017
2015-2016
2014-2015
CSR
Annual Return of NHIDCL
2020
2021
2022
Skill Development Training Program
International Cooperation
RTI
GST Cell
MoA(Memorandum of Association) & Notices
Dispute Resolution Mechanism
Chief Vigilance officer (CVO)
Independent External Monitor (IEM)
Projects
Current Status
All States
Andaman & Nicobar
Arunachal Pradesh
Assam
Himachal Pradesh
Manipur
Meghalaya
Mizoram
Nagaland
Sikkim
Tripura
Union Territory of Jammu & Kashmir
Union Territory of Ladakh
Uttarakhand
West Bengal
Nepal
Project Archive
Maps
Andaman & Nicobar
Arunachal Pradesh
Assam
Himachal Pradesh
Manipur
Meghalaya
Mizoram
Nagaland
Sikkim
Tripura
Union Territory of Jammu & Kashmir
Union Territory of Ladakh
Uttarakhand
West Bengal
Nepal
e Book
NHIDCL 2016
NHIDCL 2015
Guidelines on LA
Infracon
INAM-Pro
INAM-Pro Brochure
BGMS
Sugampath
IT Task Force
Essential Safety for Hill Roads
Standardization of Reporting Responsibilities for AEs & IEs
Appropriate Technologies for Soil & Slope Stabilization
ePace
BIMS Brochure
eAccess
The Motor Vehicles Act, 1988
The Central Motor Vehicles Rules, 1989
Tenders
Current Tenders
Tender Archive
eAuction
Current eAuction
Archive eAuction
Black List / Debarment
Termination
Negative List
Non-Performer
List of Banks
Links
Bank of Ideas
NHIDCL Email
INAM-Pro
INFRACON
BG Management
Bhoomirashi
eDMS
eOffice
SAP
PMIS
BiMS
eProcurement
Grievance Redressal
CPGRAMS
ePACE
India Investment Grid (IIG)
eSamiksha Monitoring
eSamiksha Review
eSuvidha
Ministry of Road Transport & Highways
OCMS
VIP References
IAHE
National Highways Authority of India
IRC
Ministry of External Affairs
Ministry of Shipping
MSME SAMBANDH
Events
Images
Videos
Official Language Gallery
Web Portal Videos
Presentation
Employee Portal
Career
Current Openings
Opening Archive
Contact
Corporate Office
Details of NHIDCL Officers & Staff on Deputation/ Contract
Field Offices
Feedback
Tender Evaluation Result 2019
Tender Evaluation
Result 2019
Final combined score of Financial bid for Consultancy services for Authority Engineer for Supervision of Improvement/Widening to 2 Laning of Stretch from Khongsang to Tamenglong (Design Length=37.97 Km) of NH-137 in the State of Manipur on EPC Mode under SARDP-NE. Dated: 03-01-2020.
Technical evaluation result for Consultancy Service for Authority’s Engineer for (i) Construction/upgradation of existing road to 2-lane with paved shoulder including geometric improvement from Ranipool to Pakyong from Km. 0.000 to Km. 16.167 of NH-717-A on EPC basis under SARDP-NE Phase ‘Á’ (ii) Construction of Two Lane “Chisopani Traffic Tunnel” of Length 250 m including approaches from Km 67+080 to Km 67+500 on NH-10 in East District of Sikkim State on EPC mode and (iii) Construction of 48m Bridge over Chuba Khola from km 75+300 to km 75+800 on NH-10 on EPC Basis in the state of Sikkim.Dated: 20-12-2019.
Opening of Financial For Construction of 4-Lane Bridge over Irang River on Imphal- Jiribam road section (95.500Km) NH-37 (Old NH-53) in the State of Manipur.20-12-2019.
Technical evaluation result for Restoration/reconstruction of road churachandpur km 0.00 to songpi km 7.10 on churachandpur-tipaimukh road on NH-150 in the state of Manipur.Dated: 16-12-2019.
Technical evaluation result for Consultancy services for Authority Engineer for Supervision of Improvement/Widening to 2 Laning of Stretch from Khongsang to Tamenglong (Design Length=37.97 Km) of NH-137 in the State of Manipur on EPC Mode under SARDP-NE. Dated: 13-12-2019.
Technical evaluation result for Repair and Maintenance Tezu-Hayuliang Road from km 65.08 (Near Arrowa tri-junction) to km 96.00 (Near Swami Camp/Khupa) section of NH-113 in the state of Arunachal Pradesh. Dated: 18-11-2019.
evaluation result for Construction of valley side slope stabilization treatment including drainage, cross drainage work and pavement in Dharasu- Gangotri road from km. 123.080 to km 123.970 of NH-34 and stabilization of dumping zone in the state of Uttarakhand. Dated: 18-11-2019
Opening of Financial proposal for Package-1 (NH-54) in the state of Mizoram.Dated: 01-11-2019.
Technical evaluation result for EOI for Authority’s Engineer Proposal for the work “Four-lane Bridge including approaches over river Brahmaputra between Dhubri on North Bank and Phulbari on South Bank on NH-127B (Design length 19.282 km) in the State of Assam/ Meghalaya under the scheme of’ North-East Road Network Connectivity Project on EPC mode under JICA Phase-03. Dated: 09-10-2019.
Technical evaluation result for Authority’s Engineer for Widening to 2-lane with Geometric Improvements of Tura Dalu road from km 85.000 to 95.000 & 101.000 to 145.000 to 2-Lanes with paved shoulder of Tura–Dalu section of NH-51 in the State of Meghalaya on Engineering, Procurement and Construction (EPC) mode, with Japan International Cooperation Agency (JICA) loan assistance. Dated: 30-09-2019.
Technical evaluation result for Empanelment of Consultants for preparation of Feasibility Report, Architectural & Structural Design of Automated Car Parking System at various locations in India. Dated: 30-09-2019.
Technical evaluation result for Authority’s Engineer for Widening to 2-lane with Geometric Improvements of Tura Dalu road from km 85.000 to 95.000 & 101.000 to 145.000 to 2-Lanes with paved shoulder of Tura–Dalu section of NH-51 in the State of Meghalaya on Engineering, Procurement and Construction (EPC) mode, with Japan International Cooperation Agency (JICA) loan assistance. Dated: 16-09-2019.
Technical evaluation result for Four-lane Bridge including approaches over river Brahmaputra between Dhubri on North Bank and Phulbari on South Bank on NH-127B (Design length 19.282 km) in the State of Assam/ Meghalaya under the scheme of’ North-East Road Network Connectivity Project on EPC mode under JICA Phase-03. Dated: 28-08-2019.
Technical evaluation result for Consultancy Services for Authority’s Engineer for Supervision of “Improvement/Widening to 2 Laning with earthen shoulder of Stretch from Ranikor to Nongrji existing km 0.000 to km 31.700 (Design Length- 33.250 km) in the State of Meghalaya on EPC Mode under SARDP-NE. Dated: 22-08-2019
Technical evaluation result for Construction, Operation and Maintenance of Z-Morh Tunnel including approaches on National Highway no. 1 (Srinagar Sonmarg Gumri Road) in the state of J&K on Design, Build, Finance, Operate and Transfer (DBFOT) Annuity basis. Dated: 22-08-2019.
Technical evaluation result for 2-laning with earthen shoulders from Ranikor (Khadpra) to Nongjri from Ch. 0.00 to Ch. 31.700 (Design length-33.250 km). Dated: 28-06-2019.
Technical Evaluation Result For Miscellaneous work of Automated Multilevel Car Parking Project at Transport Bhawan,1, Parliament Street, New Delhi-110001 . Dated : 25-06-2019.
Technical evaluation result for Four Laning of Imphal – Moreh Section of NH 39 from Km 330.000 to Km 350.000 in the State of Manipur (Contract Package I) on EPC mode-Retender. dated: 23-05-19.
Technical evaluation result for One Time Improvement of Moran Town section of NH -37 from km 555.000 to km 558.500 in the state of Assam . dated: 06-05-19.
Technical evaluation result for One Time Improvement of Digboi to Ledo Town section (via Powai and Margherita) of NH -38 from km 20.000 to km 53.000 in the state of Assam. dated: 06-05-19.
Technical evaluation result for the Authority’s Engineer for NH-51, Tura-Dalu road project in the state of Meghalaya. Dated: 24-04-19.
Technical Evaluation Result for Selection of Consultants for Authority’s Engineer for “Widening and upgradation to 2-lane with paved shoulder configuration and geometric improvements of NH-54 in the State of Mizoram from km 250.000 to km 380.000”.. Dated: 05-04-19.
Technical Evaluation Result for Selection of Consultants for Authority’s Engineer for “Widening and upgradation to 2-lane with paved shoulder configuration and geometric improvements of NH-54 in the State of Mizoram from km 125.000 to km 250.000”.. Dated: 05-04-19.
Technical Evaluation Result for Selection of Consultants forAuthority’s Engineer for “Widening and upgradation to 2-lane with paved shoulder configuration and geometric improvements of NH-54 in the State of Mizoram from km 8.000 to km 125.000”.. Dated: 05-04-19.
Technical Evaluation Result for Providing & supplying of commercial vehicle 6 Nos. (01 Innova & 05 Bolero or equivalent) on a monthly basis for NHIDCL Branch Office-Jammu in the State of Jammu & Kashmir. Dated: 26-03-19.
Technical Evaluation Result for Construction of 48m Bridge over Chuba Khola from Km 75+300 to Km 75+800 on NH-10 in the State of Sikkim on EPC Basis. Dated: 08-03-19.
Technically Qualified result for the Project in the state of Meghalaya from Ranior to Nongjri (Design Length- 33.250km). Dated: 08-03-19.
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of Construction, Operation and Maintenance of 2-lane Bi-Directional Silkyara Bend –Barkot Tunnel with escape passage including approaches in Dharasu-Yamunotri section between Ch. 25.4 km and Ch. 51.0 km falling along NH-134 (old NH-94) in the State of Uttarakhand” on Engineering, Procurement and Construction (EPC) Mode. Dated: 08-03-19.
Financial Bid Opening For Construction of 4-Lane Bridge over Irang River on Imphal- Jiribam road section (95.500Km) NH-37 (Old NH-53) in the State of Manipur on EPC mode.02-03-19.
Technical Evaluation Result for Consultancy Services for institutional strengthening of NHIDCL. 02-03-19
Technical Evaluation Result for Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing Pre-Construction Services for upgradation to 2 lane with paved shoulder from (i) Km 44.50 to Km 142.00 of Chattroo Village & (ii) Km 235.00 (Vailoo Village) to Km 269.00 (Khanabal) of Khellani – Kishtwar – Chattroo – Khanabal Section of NH 244. 28-02-19.
Technical Evaluation Result for Construction of Two-Lane “Chisopani Traffic Tunnel” of Length 250 m including approaches from Km 67+080 to Km 67+500 on NH-10 in East District of Sikkim State on EPC mode.Dated: 28-02-19.
Technical Evaluation Result for Up-gradation to 4-lane with Paved Shoulder of Jammu-Akhnoor road section of NH-144A from Ganesh Vihar (Km 6.000) to Khati Chowk (Km 26.350) of 20.350 Km length in the state of Jammu and Kashmir to be executed on EPC basis. Dated: 27-02-19.
Financial Bid Opening For Improvement/Widening to 2 Laning of Stretch from Khongsang to Tamenglong (Design length=37.97 Km) of NH-137 in the State of Manipur on EPC mode under SARDP-NE. Dated: 27-02-19.
Technical Evaluation Result for Construction and upgradation of existing road to 2-lane with paved shoulder of Bagrakot-Kafer section of NH-717A from Km. 0.000 to Km. 13.000 on EPC basis under SARDP-NE Phase “A” in the State of West Bengal (Package-IV A). Dated: 26-02-19.
Technical Evaluation Result for Construction of 2-Lane with Paved shoulder including geometric improvement from km 0.000 to km 16.000 of stretch Singtam – Tarku of NH 510 on EPC basis under SARDP –NE phase A in the state of Sikkim. Dated: 20-02-19.
Financial Bid Opening For Hunli-Anini AE Project in the state of Arunachal Pradesh. Dated: 20-02-19.
Technical Result for Up-gradation to 4-lane with Paved Shoulder of Jammu-Akhnoor road section of NH-144A from Ganesh Vihar (Km 6.000) to Khati Chowk (Km 26.350) of 20.350 Km length in the state of Jammu and Kashmir to be executed on EPC basis. Dated: 20-02-19.
Financial Bid Opening For Rehabilitation of existing Stretch of Churachandpur to Tipaimukh section of NH-150 length 262 Km in the State of Manipur. Package-I: Km 0.00 to Km 185.00. Dated: 15-02-19.
Financial Bid Opening For Rehabilitation/ Restoration of Hunli Anini Road from Km 0.00 to Km 21.500 in the State of Arunachal Pradesh on EPC basis.Dated: 15-02-19.
Technical Evaluation Result for Restoration of Road by providing & laying of WBM-III, Bituminous Macadam & Bituminous Concrete including construction of Protection walls, Cross Drainage works from Km 0.000 to Km 80.000 (Ramban – Doda) on Batote-Kishtwar-Sinthanpass road in the State of Jammu & Kashmir(Package-I). Dated: 14-02-19.
Technical Evaluation Result for Restoration of Road by providing & laying of WBM-III, Bituminous Macadam & Bituminous Concrete including construction of Protection walls, Cross Drainage works from Km 80.000 to Km 170.000 (Kishtwar – Chatroo) on Batote-Kishtwar-Sinthanpass road in the State of Jammu & Kashmir(Package-II). Dated: 14-02-19.
Financial Evaluation Result along with LoA for Pkg-8 (NH-54) in the state of Mizoram. Dated: 13-02-19.
Financial Evaluation Result along with LoA for Pkg-5 (NH-54) in the state of Mizoram. Dated: 13-02-19.
Financial Evaluation Result along with LoA for Pkg-4 (NH-54) in the state of Mizoram. 13-02-19.
Financial Evaluation Result along with LoA for Pkg-3 (NH-54) in the state of Mizoram. Dated: 13-02-19.
Technical Evaluation Result for Providing & supplying of commercial vehicle 6 Nos. (01 Innova & 05 Bolero or equivalent) on monthly basis for NHIDCL Branch Office-Jammu in the State of Jammu & Kashmir.Dated: 09-02-19.
Financial bid publish for Selection of agency/ agencies for entering into Annual Rate Contract for providing services of Designing, Printing of document(s) such as Flyers, Leaflets, Invitation Cards (including envelopes), Letter Heads, etc, for NHIDCL, New Delhi. Dated: 08-02-19.
Technical score for RAP consultant for NH-40, Shillong-Dwaki road stretch. Dated: 07-02-19.
Technical Result for Providing & Installation of Road Safety Measures by fixing of Traffic Sign Board, construction of Parapets, fixing of Road Delineators, Road Stud & Road Marking and Construction/Repair of Retaining walls/ Crate wall from Km 0.000 to Km 170.000 on Batote-Kishtwar-Sinthanpass road of NH-244 in the state of Jammu & Kashmir. Dated: 06-02-19.
Financial Bid Opening For “Rehabilitation of section from Km 45.00 to Km 59.20 of NH-4 to Intermediate lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands (Total Length 14.10) on EPC Mode(Package-VI) [2nd call].”. Dated: 06-02-19.
Financial Bid Opening For Rehabilitation of Km 0.00 to Km 12.00 section in Andaman Trunk Road of NH-4 to Intermediate lane with the hard shoulder in the Union Territory of Andaman & Nicobar Islands (Total Length 12.00 km) on EPC Mode (Package-V). Dated: 06-02-19.
Technical Evaluation Result for Selection of agency for operation and running of Canteen over the terrace of the Automated Multilevel Car Parking Building, Transport Bhawan, 1-Parliament Street, New Delhi-110001 (2nd Call). Dated: 06-02-19.
Technical Evaluation Result for Consultancy Services for preparation of DPR for development of Economic Corridors and International Connectivity Routes to improve the efficiency of freight movement in the state of Nagaland under Bharatmala Pariyojana (Lot-2)–(Package-I) [Jessami – Akegwo(58), Akegwo-Avangkhu(91)]. Dated: 01-02-19.
Technical Evaluation Result for Consultancy Services for preparation of DPR for development of Economic Corridors and International Connectivity Routes to improve the efficiency of freight movement in the state of Mizoram under Bharatmala Pariyojana (Lot-2)–(Package-II) [Kawlkulh – Tuivai (122 km)]. Dated: 01-02-19.
Karong-Kedima Technical Result & Date of financial opening. Dated: 31-01-19.
Final Technical Score for Garobdha (on NH 127B) – Ampati – Zigzag – Mahendraganj (near Bangladesh border). Dated: 29-01-19.
Final Technical Score for Detailed Project Preparation for Mawngap (on old NH 44E) – Mawphlang – Laitmusiang – Mawkyrwat – Rangthong – Nongnah – Dirang – Khadphra(Ranikor) (near Bangladesh Border). Dated: 29-01-19.
Technical Evaluation Result for the Project of Four laning of NH-37 from End of Moran Bypass (km 562.525) to Bogibeel Junction near Lapetketa (km 581.700) in the state of Assam under SARDP-NE, Phase ‘A’ on EPC mode – Balance Work. Dated: 22-01-19.
Technical Evaluation Result for Pkg-1 (NH-54) in the state of Mizoram. Dated: 11-01-19.
Technical Evaluation Result for Pkg-1 (NH-54) in the state of Mizoram. Dated: 11-01-19.
Technical Evaluation Result for (Package-II) NH-102B in the state of Manipur. Dated: 09-01-19.
Technical Evaluation Result for Pkg-8 (NH-54) in the state of Mizoram. Dated: 08-01-19.
Technical Evaluation Result for Pkg-6 (NH-54) in the state of Mizoram. Dated: 08-01-19.
Technical Evaluation Result for Pkg-3 (NH-54) in the state of Mizoram. Dated: 08-01-19.
Technical Evaluation Result for Pkg-2 (NH-54) in the state of Mizoram. Dated: 08-01-19.
Financial Bid Opening for Package-8 In Andaman & Nicobar Islands. Dated: 03-01-19.