GST No. 07AAECN7759E1Z7
+91-11-23461600
info[at]nhidcl[dot]com
NATIONAL HIGHWAYS & INFRASTRUCTURE DEVELOPMENT CORPORATION LTD.
Ministry of Road Transport & Highways, Government of India
 

Tender Evaluation Result 2019

Tender Evaluation Result 2019


  1. Technical Evaluation Result for Construction of 48m Bridge over Chuba Khola from Km 75+300 to Km 75+800 on NH-10 in the State of Sikkim on EPC Basis.  Dated: 08-03-19. 
  2. Technically Qualified result for the Project in the state of Meghalaya from Ranior to Nongjri (Design Length- 33.250km).  Dated: 08-03-19.
  3. Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of Construction, Operation and Maintenance of 2-lane Bi-Directional Silkyara Bend –Barkot Tunnel with escape passage including approaches in Dharasu-Yamunotri section between Ch. 25.4 km and Ch. 51.0 km falling along NH-134 (old NH-94) in the State of Uttarakhand” on Engineering, Procurement and Construction (EPC) Mode. Dated: 08-03-19.
  4. Financial Bid Opening For Construction of 4-Lane Bridge over Irang River on Imphal- Jiribam road section (95.500Km) NH-37 (Old NH-53) in the State of Manipur on EPC mode.02-03-19. 
  5. Technical Evaluation Result for Consultancy Services for institutional strengthening of NHIDCL. 02-03-19
  6. Technical Evaluation Result for Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing Pre-Construction Services for upgradation to 2 lane with paved shoulder from (i) Km 44.50 to Km 142.00 of Chattroo Village & (ii) Km 235.00 (Vailoo Village) to Km 269.00 (Khanabal) of Khellani – Kishtwar – Chattroo – Khanabal Section of NH 244.  28-02-19.
  7. Technical Evaluation Result for  Construction of Two-Lane “Chisopani Traffic Tunnel” of Length 250 m including approaches from Km 67+080 to Km 67+500 on NH-10 in East District of Sikkim State on EPC mode.Dated: 28-02-19.
  8. Technical Evaluation Result for Up-gradation to 4-lane with Paved Shoulder of Jammu-Akhnoor road section of NH-144A from Ganesh Vihar (Km 6.000) to Khati Chowk (Km 26.350) of 20.350 Km length in the state of Jammu and Kashmir to be executed on EPC basis.  Dated: 27-02-19. 
  9. Financial Bid Opening For Improvement/Widening to 2 Laning of Stretch from Khongsang to Tamenglong (Design length=37.97 Km) of NH-137 in the State of Manipur on EPC mode under SARDP-NE. Dated: 27-02-19.
  10. Technical Evaluation Result for  Construction and upgradation of existing road to 2-lane with paved shoulder of Bagrakot-Kafer section of NH-717A from Km. 0.000 to Km. 13.000 on EPC basis under SARDP-NE Phase “A” in the State of West Bengal (Package-IV A). Dated: 26-02-19. 
  11. Technical Evaluation Result for Construction of 2-Lane with Paved shoulder including geometric improvement from km 0.000 to km 16.000 of stretch Singtam – Tarku of NH 510 on EPC basis under SARDP –NE phase A in the state of Sikkim.  Dated: 20-02-19. 
  12. Financial Bid Opening For Hunli-Anini AE Project in the state of Arunachal Pradesh.  Dated: 20-02-19. 
  13. Technical Result for Up-gradation to 4-lane with Paved Shoulder of Jammu-Akhnoor road section of NH-144A from Ganesh Vihar (Km 6.000) to Khati Chowk (Km 26.350) of 20.350 Km length in the state of Jammu and Kashmir to be executed on EPC basis. Dated: 20-02-19.
  14. Financial Bid Opening For Rehabilitation of existing Stretch of Churachandpur to Tipaimukh section of NH-150 length 262 Km in the State of Manipur. Package-I: Km 0.00 to Km 185.00. Dated: 15-02-19.
  15. Financial Bid Opening For Rehabilitation/ Restoration of Hunli Anini Road from Km 0.00 to Km 21.500 in the State of Arunachal Pradesh on EPC basis.Dated: 15-02-19.
  16. Technical Evaluation Result for Restoration of Road by providing & laying of WBM-III, Bituminous Macadam & Bituminous Concrete including construction of Protection walls, Cross Drainage works from Km 0.000 to Km 80.000 (Ramban – Doda) on Batote-Kishtwar-Sinthanpass road in the State of Jammu & Kashmir(Package-I). Dated: 14-02-19. 
  17. Technical Evaluation Result for Restoration of Road by providing & laying of WBM-III, Bituminous Macadam & Bituminous Concrete including construction of Protection walls, Cross Drainage works from Km 80.000 to Km 170.000 (Kishtwar – Chatroo) on Batote-Kishtwar-Sinthanpass road in the State of Jammu & Kashmir(Package-II).  Dated: 14-02-19.  
  18. Financial Evaluation Result along with LoA for Pkg-8 (NH-54) in the state of Mizoram.  Dated: 13-02-19.
  19. Financial Evaluation Result along with LoA for Pkg-5 (NH-54) in the state of Mizoram. Dated: 13-02-19.
  20. Financial Evaluation Result along with LoA for Pkg-4 (NH-54) in the state of Mizoram. 13-02-19. 
  21. Financial Evaluation Result along with LoA for Pkg-3 (NH-54) in the state of Mizoram. Dated: 13-02-19. 
  22. Technical Evaluation Result for Providing & supplying of commercial vehicle 6 Nos. (01 Innova & 05 Bolero or equivalent) on monthly basis for NHIDCL Branch Office-Jammu in the State of Jammu & Kashmir.Dated: 09-02-19.
  23. Financial bid publish for Selection of agency/ agencies for entering into Annual Rate Contract for providing services of Designing, Printing of document(s) such as Flyers, Leaflets, Invitation Cards (including envelopes), Letter Heads, etc, for NHIDCL, New Delhi. Dated: 08-02-19. 
  24. Technical score for RAP consultant for NH-40, Shillong-Dwaki road stretch. Dated: 07-02-19.
  25. Technical Result for Providing & Installation of Road Safety Measures by fixing of Traffic Sign Board, construction of Parapets, fixing of Road Delineators, Road Stud & Road Marking and Construction/Repair of Retaining walls/ Crate wall from Km 0.000 to Km 170.000 on Batote-Kishtwar-Sinthanpass road of NH-244 in the state of Jammu & Kashmir. Dated: 06-02-19. 
  26. Financial Bid Opening For “Rehabilitation of section from Km 45.00 to Km 59.20 of NH-4 to Intermediate lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands (Total Length 14.10) on EPC Mode(Package-VI) [2nd call].”. Dated: 06-02-19.
  27. Financial Bid Opening For Rehabilitation of Km 0.00 to Km 12.00 section in Andaman Trunk Road of NH-4 to Intermediate lane with the hard shoulder in the Union Territory of Andaman & Nicobar Islands (Total Length 12.00 km) on EPC Mode (Package-V). Dated: 06-02-19.
  28. Technical Evaluation Result for Selection of agency for operation and running of Canteen over the terrace of the Automated Multilevel Car Parking Building, Transport Bhawan, 1-Parliament Street, New Delhi-110001 (2nd Call). Dated: 06-02-19.
  29. Technical Evaluation Result for Consultancy Services for preparation of DPR for development of Economic Corridors and International Connectivity Routes to improve the efficiency of freight movement in the state of Nagaland under Bharatmala Pariyojana (Lot-2)–(Package-I) [Jessami – Akegwo(58), Akegwo-Avangkhu(91)]. Dated: 01-02-19. 
  30. Technical Evaluation Result for Consultancy Services for preparation of DPR for development of Economic Corridors and International Connectivity Routes to improve the efficiency of freight movement in the state of Mizoram under Bharatmala Pariyojana (Lot-2)–(Package-II) [Kawlkulh – Tuivai (122 km)]. Dated: 01-02-19.
  31. Karong-Kedima Technical Result & Date of financial opening. Dated: 31-01-19. 
  32. Final Technical Score for Garobdha (on NH 127B) – Ampati – Zigzag – Mahendraganj (near Bangladesh border). Dated: 29-01-19.
  33. Final Technical Score for Detailed Project Preparation for Mawngap (on old NH 44E) – Mawphlang – Laitmusiang    – Mawkyrwat – Rangthong – Nongnah – Dirang – Khadphra(Ranikor) (near Bangladesh Border). Dated: 29-01-19.
  34. Technical Evaluation Result for the Project of Four laning of NH-37 from End of Moran Bypass (km 562.525) to Bogibeel Junction near Lapetketa (km 581.700) in the state of Assam under SARDP-NE, Phase ‘A’ on EPC mode – Balance Work. Dated: 22-01-19. 
  35. Technical Evaluation Result for Pkg-1 (NH-54) in the state of Mizoram. Dated: 11-01-19. 
  36. Technical Evaluation Result for Pkg-1 (NH-54) in the state of Mizoram. Dated: 11-01-19. 
  37. Technical Evaluation Result for (Package-II) NH-102B  in the state of Manipur. Dated: 09-01-19. 
  38. Technical Evaluation Result for Pkg-8 (NH-54) in the state of Mizoram. Dated: 08-01-19. 
  39. Technical Evaluation Result for Pkg-6 (NH-54) in the state of Mizoram. Dated: 08-01-19.
  40. Technical Evaluation Result for Pkg-3 (NH-54) in the state of Mizoram. Dated: 08-01-19.
  41. Technical Evaluation Result for Pkg-2 (NH-54) in the state of Mizoram.  Dated: 08-01-19.
  42. Financial Bid Opening for Package-8 In Andaman & Nicobar Islands. Dated: 03-01-19.