Owner | National Highways & Infrastructure Development Corporation Limited. (NHIDCL) | Development Contract Type | Lump Sum Turn Key |
Concessionaire | Srinagar Sonamarg Tunnel way limited (SSTL) | Construction Contract Type | Item rate |
IE | EPTISA Servicios De Ingineria SL | Development Cost | Rs. 2472 Cr |
Project Developer | IL&FS Transportation Networks Limited | Total Capital Cost | Rs. 3289 Cr |
Construction Contractor | APCO – TITAN JV | Concession Period | 20 years |
Design Consultant | ITNL Design Cell & Gursamsar | Construction Period | 1825 days |
Appointed Date (Actual) | May 01, 2015 | Schedule Project Completion Date | 30.04.2020 |
Time Elapsed (%) | 41% | Semi Annuity | Rs. 234.70 Cr |
Main Tunnel | 6.5 Kms | Escape Tunnel | 6.5 Kms |
Ventilation Tunnel | 575 m | Ventilation Cavern | 01 (30 m Length) |
Cross Passage | 25 | Rigid Pavement | 12.00 Km (Both Tunnel) |
Flexible Pavement | 5.50 Km | Rotary Junction | 01 |
Minor Bridge | 1 (30 m span) | Tunnel Control Centre(Building) | 02 |
Major Bridge | 2 (110m & 240m span) | Box Culverts | 23 |
Lay Bays | 08 | Fire Fighting System | With 50 niches on both sides |
Vehicular Emergency Exit | 08 | Ventilation Building | 02 |
Pedestrian Cross Passage Exit | 17 | Sub Station For Power From J&K Electricity Board | 02 |