Current Tenders

S.No. Description State / Territory Bid Due Date
1

Request for Proposal Rehabilitation and upgradation to two lane with earthen shoulder of Nongstoin-Wahkhaji road section (Design chainage Km. 0.00 to Km. 43.060) in the state of Meghalaya under SARDP-NE On Engineering, Procurement & Construction (EPC) Mode.
For Details
 Click Here

NIT

DCA

Technical Schedules A-P

Typical Cross Sections

GAD of Bridges

DPR

Alignment 0.000 to 28.000 km

Alignment 28.000 to 43.060 km

Corrigendum

Modified RFP, DCA and Schedules

Corrigendum 2

Corrigendum 3

Modified RFP, EPC and TCS

Reply To Prebid Queries

Corrigendum 4

Corrigendum 5

Corrigendum 6

Corrigendum 7

Corrigendum 8

Corrigendum 9

Corrigendum 10

Meghalaya 29-05-2017
17:00 hrs
2

RFP for Consultancy Services for Preparation of Detailed Project  Report for Construction of 2-Lane Bridge for Connectivity  of Port Blair - Chatham Island and Bambooflat with 400 M  Navigational span in the Union Territory region of Andaman Nicobar Islands.
For Details
 Click Here

NIT

Corrigendum 1

Corrigendum 2

Corrigendum 3

Corrigendum 4

Corrigendum 5

Corrigendum 6

Andaman and Nicobar 29-05-2017
15:00 hrs
3

REQUEST FOR PROPOSAL (RFP) FOR “CONSTRUCTION, OPERATION AND MAINTENANCE OF 2-LANE BI-DIRECTIONAL ZOJILA TUNNEL WITH PARALLEL ESCAPE (EGRESS) TUNNEL INCLUDING APPROACHES  ON SRINAGAR-LEH SECTION CONNECTING NH-1 AT KM 95.00 AND AT KM 118.00 IN THE STATE OF JAMMU & KASHMIR ON EPC MODE”. For Details Click Here

NIT

EPC Agreement

DPR Documents

Detailed Geological Report

SASE Report Part 1

SASE Report Part 2

Vol 6 Final Lining Design Report Part 1

Vol 6 Final Lining Design Report Part 2

Vol 6 Final Lining Design Report Part 3

Vol 11 Drawings Part 1

Vol 11 Drawings Part 2

Appendix B1

Annexure Attachment D1

Annexure Attachment D2

Amendment 1

Revised Technical Documents

Amendment 2

Letter To Bidders

Reply To Prebid Queries

Zojila Geo Reports

Zojila Traffic Studies

Zojila ELA

NHIDCL_ZojiLa_1_A

NHIDCL_ZojiLa_1_B

BH_Core Box Photo_2_1

BH_Core Box Photo_2_2

BH_Core Box Photo_2_3

BH_Core Box Photo_2_4

BH_Core Box Photo_2_5

BH_Core Box Photo_2_6

BH_Core Box Photo_2_7

BH_Core Box Photo_2_8

BH_Core Box Photo_2_9

BH_Core Box Photo_3_1

BH_Core Box Photo_3_2

BH_Core Box Photo_3_3

BH_Core Box Photo_3_4

BH_Core Box Photo_3_5

BH_Core Box Photo_3_6

BH_Core Box Photo_3_7

BH_Core Box Photo_3_8

BH_Core Box Photo_3_9

BH_Core Box Photo_3_10

NHIDCL_ZojiLa_4_1

NHIDCL_ZojiLa_4_2

NHIDCL_ZojiLa_4_3

NHIDCL_Zojila_4_4

NHIDCL_ZojiLa_4_5

LA1110B_5_1

LA1110B_5_2

LA1110B_5_3

LA1110B_5_4

NHIDCL_ZojiLa_6_1

NHIDCL_ZojiLa_6_2

NHIDCL_ZojiLa_6_3

NHIDCL_ZojiLa_6_4

NHIDCL_ZojiLa_6_5

NHIDCL_ZojiLa_7_1

NHIDCL_ZojiLa_7_2

NHIDCL_ZojiLa_7_3

NHIDCL_ZojiLa_7_4

NHIDCL_ZojiLa_7_5

NHIDCL_ZojiLa_7_6

NHIDCL_ZojiLa_7_7

BH_Core BoxPhoto_8_1

BH_Core BoxPhoto_8_2

BH_Core BoxPhoto_8_3

BH_Core BoxPhoto_8_4

BH_Core BoxPhoto_8_5

BH_Core BoxPhoto_8_6

Geological cross section_9_A_1

Geological Maps of Zojilapart1_9_A_2

Geological Maps of Zojilapart2_9_A_3

Geologicalreportpart1_9_A_4

Geologicalreportpart2_9_A_5

LabtestresultKeyCordinates_9_B

Zojila Cad Dwg, Survey Report_9_C

ZoT DPR Vol Update_PIARC Guidelines_10_1

Z-Morh Tunnel_10_1_1

Zojila Tunnel_10_1_2

ZoT DPR Vol Update_Zojila Tunnel_10_3

Amendment 4

Invitation for Site visit

Zojila Tunnel Meeting Schedule

Revised Zojila Tunnel Meeting Schedule

Amendment 5

Minutes of Meeting

Reply To Prebid Queries

Zojila Tunnel Presentation

Amendment 6

Reply To Prebid Queries

Reply To Prebid Queries (New)

Jammu and Kashmir 30-05-2017
11:00 hrs
4

RFP for “Construction of Dimapur Bypass (Assam Portion) of 4/6 lane pavement  on EPC basis  from existing Km 159.400 of NH-36 to existing Km 102.500 of NH-39 and upto end point of Assam portion [Design Km 118.050 to design Km 132.375] (length 14.325 Km)  in the State of Assam under Phase-A of SARDP-NE” 
For Details
 Click Here

NIT

CostEstimateB_Part1

CostEstimateB_Part2

DCA

SchedulesPart_B_Part1

SchedulesPart_B_Part2

VOLUME_I_MAINREPORT

VOLUME_III_MATERIALREPORT

VOLUME_IV_EAR_EMP_RAP_REPORT

VOLUME_IX_DrawingVolume

VOLUME_VI_RATEANALYSIS

Corrigendum 1

Corrigendum 2

Assam 01-06-2017
11:00 hrs
5

Tender for Segregation and augmentation of Existing Electrical & Airconditioning system installed at NHIDCL, 2nd floor, PTI Building, 4- Parliament Street, New Delhi-110001
For Details
 Click Here

Notification

Addendum

Delhi 01-06-2017
15:00 hrs
6

RFP for Consultancy Services for Preparation of Detailed  Project Report and providing Pre-Construction activaties in respect of the following  stretches on NH-244 (old NH-1B)in the state of Jammu & Kashmir.  

(i) Sudhmahadev- Dranga Tunnel of appox. length 4.5 Km and its approaches on Chenani -  Sudhmahadev – Goha road portion.  
(ii) Vailoo Tunnel of approx length 10.00 Km under Sinthan Pass and its approach roads  on Goha- Khellani- Khanabal road portion.
For Details Click Here

NIT

Amendment 1

Modified BOQ

Amendment 2

Amendment 3

Amendment 4

Amendment 5

Reply To Prebid Queries

Amendment 6

Reply To Prebid Queries

Jammu and Kashmir 07-06-2017
17:00 hrs
7

RFP For Special Repair Works At Narrow zone and Landslide Area Between Rangpo and Ranipool on NH-10 in the State of Sikkim on EPC Basis.
For Details
 Click Here

NIT

Schedule

EPC Agreement

Drawings

Corrigendum 1

Corrigendum 2

Corrigendum 3

Corrigendum 4

Modified Schedule B and D

Reply To Prebid Queries

Corrigendum V

Corrigendum VI

Corrigendum VII

Corrigendum VIII

Corrigendum IX

Corrigendum X

Sikkim 08-06-2017
15:00 hrs
8

RFP for “Four laning of Balachera to Harangajo section of NH-54(Ext) from km 275.000 to km 244.000 in the State of Assam on EPC mode”.
For Details
 Click Here

NIT

DCA

Executive Summary

Technical Schedules

Plan and Profile

TCS and GADs

Corrigendum 1

Corrigendum 2

Reply To Prebid Queries

Corrigendum 3

Corrigendum 4

Corrigendum 5

Corrigendum 6

Corrigendum 7

Assam 08-06-2017
11:00 hrs
9

RFP for Consultancy Services for Authority’s Engineer for Supervision of 

(i) “Construction of Extra-dosed RCC Bridge including viaduct and approaches over river Feni at Sabroom on Indo-Bangladesh Border on NH-8 in the state of Tripura on EPC mode”. 
(ii) “Two laning with paved shoulder of NH-53 from Silchar to Badarpur section from km 6.25 to km 10.40 (Total Length 4.77 km) in the state of Assam on EPC basis under SARDP-NE”. 
(iii) “Improvement and Strengthening of Road section from Chand Khera to Kurti Bridge on NH-208A (Length- 17.950 km) in the state of Assam near Assam Tripura Border”.
For Details Click Here

NIT

Corrigendum 1

Assam 08-06-2017
11:00 hrs
10

Tender for Selection of agency to Build & Operate Cafe over the terrace of the Automated Multilevel Car Parking Building, Transport Bhawan, 1-Parliament Street, New Delhi- 110001.
For Details
 Click Here

Corrigendum 1

Corrigendum 2

Corrigendum 3

Corrigendum 4

Corrigendum 5

Notification

Delhi 09-06-2017
15:00 hrs
11

RFP FOR CONSTRUCTION OF ADDITIONAL BRIDGE ADJACENT TO THE EXISTING BRIDGE AT KM 52.100 ON NH-10 AT RANGPO AT THE BORDER OF WEST BENGAL AND SIKKIM STATE ON EPC MODE.
For Details
 Click Here

NIT

Agreement & Schedules

Drawing

Main Report

Cost Estimate

Sikkim 12-06-2017
15:00 hrs
12

Construction of Major Bridge over Middle Strait Creek between Km.  106.590 to Km. 107.762 of NH-223 (New No.- NH-4) connecting  South Andaman & Baratang Islands in the Union Territory of  Andaman & Nicobar Islands on EPC Basis.
For Details
 Click Here

EPC Agreement

Schedule A to P

Corrigendum 7

Corrigendum 8

Corrigendum 9

Corrigendum 10

Corrigendum 11

NIT

Corrigendum 12

Corrigendum 13

Corrigendum 14

Corrigendum 15

Corrigendum 16

Corrigendum 17

Corrigendum 18

Corrigendum 19

Corrigendum 20

Corrigendum 21

Modified RFP

Modified DCA & Schedules

Andaman and Nicobar 12-06-2017
15:00 hrs
13

RFP for Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for the Construction of a Road Tunnel and its approaches Enabling All Weather Connectivity along the Mughal Road in the State of Jammu and Kashmir. 
For Details
 Click Here

NIT

Preliminary Project Report

Amendment 1

Amendment 2

Amendment 3

Amendment 4

Reply To Prebid Queries

Amendment 5

Reply To Prebid Queries

Jammu and Kashmir 14-06-2017
17:00 hrs
14

RFP for Consultancy Services for carrying out Feasibility Study, Preparation  of Detailed Project Report and providing pre-construction services  of new RCC Bridge over River Gomti at Ch. 49.80 km and over River  Muhuri at Ch. 93.775 km including approach roads to the Bridges on Agartala to Sabroom road section of NH-44 in the state of Tripura.
For Details
 Click Here

NIT

Corrigendum 1A

Corrigendum 1B

Reply To Prebid Queries

Tripura 14-06-2017
15:00 hrs
15

RFP for Consultancy Services for Authority Engineer for Supervision of "Construction of Four/Six laning from Km 132.375 to Km 158.058 (Total New Alignment length of 20.683 Km) of Daboka Dimapur Section (Dimapur Bypass) of NH-36 & 39 in the state of Nagaland and Dimapur Bypass (Assam Portion) from existing Km 159.400 of NH-36 to existing Km 102.500 of NH-39 and upto end point of Assam portion [Design Km 118.050 to design Km 132.375] (length 14.325 Km) in the State of Assam under SARDP-NE on Engineering Procurement and Construction basis. For Details Click Here

NIT

Nagaland 22-06-2017
15:00 hrs
16

Request for Proposal for Consultancy Services for Authority's Engineer for Supervision of “Rehabilitation and upgradation to two lane with earthen shoulder of Nongstoin-Wahkhaji road section from existing km 0.00 to km 43.100 [Design chainage km 0.00 to km 43.060] (design length 43.060 km) in the state of Meghalaya under SARDP-NE”.
For Details
 Click Here

NIT

Corrigendum 1

Corrigendum 2

Corrigendum 3

Corrigendum 4

Meghalaya 27-06-2017
17:00 hrs