Current Tenders

S.No. Description State / Territory Bid Due Date
1

RFP For Emergency Restoration of road by way of clearance of side drains, construction of R/walls and providing & laying of WBM & Closed Graded Premix Carpeting/ Mixed Seal Surfacing on Sinthan PassKhanabal road, NH-244 from km. 184.000 to km. 265.000 and Providing and supplying of construction equipments including driver, loading/unloading arrangements, fuel, lubricants and attachments for misc. work as and when required basis from Km 171.000 to Km 265.00 in the State of Jammu & Kashmir.

RFP

NIT

Jammu and Kashmir 27-09-2017
11:00 hrs
2

RFP for Comprehensive Annual Maintenance and operation of Audio Visual Projection system & sound re-inforcement system and Audio conferencing system for Media Room at Ministry of Road Transport & Highway, Transport Bhawan, New Delhi-110001 

RFP

NIT

BOQ

Corrigendum 1

Corrigendum 2

Delhi 28-09-2017
15:00 hrs
3

RFP For Consultancy Services for Preparation, Submission & Clearance of Land Acquisition Plan, Utility Shifting and Forest Clearance proposals for  widening and upgradation of National Highways in the North Eastern Region (NER) of India. 

RFP

NIT

NER 28-09-2017
15:00 hrs
4

NIT for Hiring of Vehicle on Monthly Basis for NHIDCL Site Office Rhenock, Gangtok Sikkim and Site Office Siliguri, West Bengal.

NIT

West Bengal 30-09-2017
12:00 hrs
5

RFP For Special Repair Works At Narrow zone and Landslide Area Between Rangpo and Ranipool on NH-10 in the State of Sikkim on EPC Basis.

RFP

NIT

Schedule

EPC Agreement

Drawings

Corrigendum 1

Corrigendum 2

Corrigendum 3

Corrigendum 4

Modified Schedule B and D

Reply To Prebid Queries

Corrigendum V

Corrigendum VI

Corrigendum VII

Corrigendum VIII

Corrigendum IX

Corrigendum X

Corrigendum XI

Corrigendum XII

Corrigendum XIII

Corrigendum XIV

Corrigendum XV

Sikkim 03-10-2017
15:00 hrs
6

Consultancy services for Authority’s Engineer for Supervision of “Construction, Operation and Maintenance of 2-Lane bi-directional Zojila Tunnel with Parallel Escape (Egress) Tunnel excluding approaches on Srinagar-Leh Section connecting NH-1A at Km 95.00 And At Km 118.00 in the State of Jammu & Kashmir on EPC Mode”. 

RFP

NIT

Amendment 1

Amendment 2

Amendment 3

Reply To Prebid Queries

Date Extension

Pre-bid Conference cum Road show

Amendment 4

Letter To Bidders

Amendment 5

Reply To Prebid Queries

Jammu and Kashmir 03-10-2017
15:00 hrs
7

RFP FOR “SHORT TERM OPERATION AND MAINTENANCE FROM KM. 403.000 TO KM. 468.000 OF NH-07(OLD NH-58) IN RUDRAPRAYAG – JOSHIMATH IN THE STATE OF UTTARAKHAND –PACKAGE-2”

RFP

NIT

Uttarakhand 03-10-2017
15:00 hrs
8

RFP FOR “SHORT TERM OPERATION AND MAINTENANCE FROM KM. 368.000 TO KM. 403.000 OF NH-07(OLD NH-58) IN RUDRAPRAYAG – JOSHIMATH IN THE STATE OF UTTARAKHAND –PACKAGE-1”

RFP

NIT

Uttarakhand 03-10-2017
15:00 hrs
9

Request for Proposal Rehabilitation and upgradation to two lane with earthen shoulder of Nongstoin-Wahkhaji road section (Design chainage Km. 0.00 to Km. 43.060) in the state of Meghalaya under SARDP-NE On Engineering, Procurement & Construction (EPC) Mode.

RFP

NIT

DCA

Technical Schedules A-P

Typical Cross Sections

GAD of Bridges

DPR

Alignment 0.000 to 28.000 km

Alignment 28.000 to 43.060 km

Corrigendum

Modified RFP, DCA and Schedules

Corrigendum 2

Corrigendum 3

Modified RFP, EPC and TCS

Reply To Prebid Queries

Corrigendum 4

Corrigendum 5

Corrigendum 6

Corrigendum 7

Corrigendum 8

Corrigendum 9

Corrigendum 10

Corrigendum 11

Corrigendum 12

Corrigendum 13

Corrigendum 14

Amended Schedule H

Corrigendum 16

Meghalaya 04-10-2017
17:00 hrs
10

RFP FOR CONSTRUCTION OF ADDITIONAL BRIDGE ADJACENT TO THE EXISTING BRIDGE AT KM 52.100 ON NH-10 AT RANGPO AT THE BORDER OF WEST BENGAL AND SIKKIM STATE ON EPC MODE.

RFP

NIT

Agreement & Schedules

Drawing

Main Report

Cost Estimate

Reply To Prebid Queries

Corrigendum 1

Corrigendum 2

Corrigendum 3

Corrigendum 4

Corrigendum 5

Corrigendum 6

Sikkim 04-10-2017
15:00 hrs
11

Request for Proposal for Consultancy Services for Authority's Engineer for Supervision of “Rehabilitation and upgradation to two lane with earthen shoulder of Nongstoin-Wahkhaji road section from existing km 0.00 to km 43.100 [Design chainage km 0.00 to km 43.060] (design length 43.060 km) in the state of Meghalaya under SARDP-NE”.

RFP

NIT

Corrigendum 1

Corrigendum 2

Corrigendum 3

Corrigendum 4

Corrigendum 5

Corrigendum 6

Modified BOQ

Corrigendum 7

Corrigendum 8

Meghalaya 05-10-2017
17:00 hrs
12

RFP for Consultancy Services for Authority’s Engineer for Supervision of  “

(i) Rehabilitation and up-gradation of Tura-Mankachar road from Mirjumala junction to Mankachar-Silchar Tinali (0/0 to 1/660km) to two lane carriageway in the State of Assam 
(ii) Rehabilitation and up-gradation of Doimukh-Harmuti road from Harmuti Junction (0/00 km) to Khula camp (14/370 km) and Doimukh (0/000 km) to Bagh Tinali (3/100 km) two lane carriageway in the State of Assam and Arunachal Pradesh 
(iii) Rehabilitation and up-gradation of Wokha-Merapani Road from Wokha Junction (0/000 km) To (26/000 km) in the State of Nagaland 
(iv) Rehabilitationand up-gradation of Wokha-Merapani Road from (26/000 km) To (48/000 km) in the State of Nagaland 
(v) Rehabilitation and up-gradation of Wokha-Merapani Road from (48/000 km) To Merapani (60/585 km) in the State of Nagaland and Assam”. 

RFP

NIT

Corrigendum 1

Corrigendum 2

Corrigendum 3

Corrigendum 4

Corrigendum 5

Assam 05-10-2017
11:00 hrs
13

RFP for Consultancy services for 1 year for supervision of “Restoration / Reconstruction of Ukhrul-Toloi-Tadubi road section from Km 0.00 to Km 115.00 covering 115 Km length on NH-102A in the state of Manipur".

RFP

NIT

Corrigendum 1

Corrigendum 2

Corrigendum 3

Corrigendum 4

Corrigendum 5

Corrigendum 6

Corrigendum 7

Manipur 05-10-2017
15:00 hrs
14

RFP for Improvement & Rehabilitation of existing Indira Bye Pass road form Km 0.000 to km 10.117 on NH-10 in the State of Sikkim on Item Rate Basis.

RFP

NIT

Reply To Prebid Queries

Corrigendum 1

Drawing

Corrigendum 2

Sikkim 05-10-2017
15:00 hrs
15

Request For Proposal For FOUR LANING OF JORHAT TO JHANJI SECTION OF NH37 FROM KM 453.000 TO KM 491.050 (DESIGN KM 453.000 TO KM 490.800) IN THE STATE OF ASSAM ON EPC MODE.

RFP

NIT

EPC Agreement

Technical Schedules

Annexure To Schedule H and J

DPR

Assam 09-10-2017
17:00 hrs
16

RFP For Four Laning of Imphal – Moreh Section of NH 39 from Km 330.000 to Km 350.000 in the State of Manipur (Contract Package I) under Engineering Procurement and Construction (EPC) Mode

RFP

Schedules A To P

IFB

DCA

Dispute Board Appendix

Addendum To EPC Agreement

Imphal Moreh DPR

Manipur 09-10-2017
17:00 hrs
17

RFP For Two Laning of Imphal – Moreh Section of NH 39 from Km 350.000 to Km 395.680 in the State of Manipur (Contract Package II) under Engineering Procurement and Construction (EPC) Mode 

RFP

Schedules A To P

IFB

DCA

Dispute Board Appendix

Appendix To EPC

Imphal Moreh DPR

Manipur 09-10-2017
17:00 hrs
18

Expression of Interest (EOI) for Authority's Engineer for Widening and up-gradation to 2-lane with paved shoulder configuration and geometric improvements of NH-54 in the State of Mizoram on Engineering, Procurement and Construction (EPC) mode, with Japan International Cooperation Agency (JICA) loan assistance, for three consultancy packages as per following stretches: (i) From km 8.000 to km 125.000 (comprising 2 Civil contract packages); (ii) From km 125.000 to km 250.000 (comprising 3 Civil contract packages); (iii) From km 250.000 to km 380.000 (comprising 3 Civil contract packages).

EOI

Mizoram 10-10-2017
17:00 hrs
19

RFP for Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for the Construction of a Road Tunnel and its approaches Enabling All Weather Connectivity along the Mughal Road in the State of Jammu and Kashmir. 

RFP

NIT

Preliminary Project Report

Amendment 1

Amendment 2

Amendment 3

Amendment 4

Reply To Prebid Queries

Amendment 5

Reply To Prebid Queries

Amendment 6

Amendment 7

Amendment 8

Amendment 9

Amendment 10

Jammu and Kashmir 16-10-2017
17:00 hrs
20

Consultancy Services for Authority’s Engineer For (2nd Call) For  (i) Construction of  (i) 154m span Steel Superstructure Bridge at Km 145.09 over River Barak and  (ii) 122 m span Steel Superstructure Bridge at Km 189.80 over River Makru on Jiribam- Barak road on NH-53 in State of Manipur.(Pkg.I) (ii) Short Term Improvement & Routine Maintenance of Imphal-Jiribam Road from Km 3.00 to Km 220.00 (Length= 217 Km) of NH-53 (New NH-37) in the state of Manipur on Percentage Rate basis. (Pkg-II) (iii) Restoration/Reconstruction of Tamenglong-Khonsang Road (Km 0.00 to Km 39.50) in the State of Manipur. (Pkg-III)

RFP

NIT

Manipur 16-10-2017
15:00 hrs
21

RFP For Consultancy Services for Authority’s Engineer for (i) Protection works at Nalupani Landslide Zone (Ex.km 123+080 to km. 123+480, km 123+665 to km 123+740 and km 123+770 to km 123+970) Section of NH-34 in the State of Uttarakhand on EPC basis. (ii) Construction of Road, Bridge and Slope Protection works of Landslide at Bareti (Ex. Km. 100.300 to km 101.600 of Section NH-34 in the State of Uttarakhand on EPC basis.

RFP

NIT

Uttarakhand 16-10-2017
11:00 hrs
22

Request For Proposal for FOUR LANING OF JHANJI TO DEMOW SECTION OF NH-37 FROM KM 491.050 TO KM 535.050 (DESIGN KM 490.800 TO KM 534.800) IN THE STATE OF ASSAM on Engineering, Procurement & Construction (EPC) Mode

RFP

NIT

EPC Agreement

Schedule H

Schedules ABCD

Addendum

Indicative_Drawings_Part1

Indicative_Drawings_Part2

Indicative_Drawings_Part3

Indicative_Drawings_Part4

Plan and Profile

Assam 17-10-2017
17:00 hrs
23

RFP For Repair and Maintenance of National Highway (NH 37) between Jhanjhi to Demow (Km. 491.050 to Km. 535.250)

RFP

NIT

Assam 23-10-2017
14:00 hrs
24

RFP For Repair and Maintenance of National Highway (NH 37) between Jorhat to Jhanjhi including temporary drainage work (Km. 453.000 to Km. 491.050).

RFP

NIT

Assam 23-10-2017
14:00 hrs
25

EOI For Authority’s Engineer for “Widening to 2-lane with Geometric Improvements of Tura Dalu road from km 85.000 to 95.000 & 101.000 to 145.000 to 2-Lanes with paved shoulder of Tura–Dalu section of NH-51 in the State of Meghalaya” on Engineering, Procurement and Construction (EPC) mode, with Japan International Cooperation Agency (JICA) loan assistance.

EOI

Meghalaya 25-10-2017
17:00 hrs
26

Consultancy Services for carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of Two Laning with paved shoulder NH configuration of (i) Margherita-Changlang in the state of Assam and Arunachal Pradesh (ii) Daporijo (Upper Subansiri) to Dollungmukh (Lower Subansiri) via Dumporijo in the state of Arunachal Pradesh (iii) Tezu-Chapakhowa Via Sunpura section in the state of Arunachal Pradesh and Assam under SARDP-NE on Engineering, Procurement and Construction mode.

RFP

NIT

Arunachal Pradesh 26-10-2017
16:30 hrs
27

RFP for “Construction of Dimapur Bypass (Assam Portion) of 4/6 lane pavement  on EPC basis  from existing Km 159.400 of NH-36 to existing Km 102.500 of NH-39 and upto end point of Assam portion [Design Km 118.050 to design Km 132.375] (length 14.325 Km)  in the State of Assam under Phase-A of SARDP-NE” 

RFP

NIT

CostEstimateB_Part1

CostEstimateB_Part2

DCA

SchedulesPart_B_Part1

SchedulesPart_B_Part2

VOLUME_I_MAINREPORT

VOLUME_III_MATERIALREPORT

VOLUME_IV_EAR_EMP_RAP_REPORT

VOLUME_IX_DrawingVolume

VOLUME_VI_RATEANALYSIS

Corrigendum 1

Corrigendum 2

Corrigendum 3

Corrigendum 4

Corrigendum 5

Corrigendum 6

Assam 30-10-2017
11:00 hrs