1. Technical Evaluation Score for the project of Consultancy Services for Authority’s Engineer for Supervision of “Construction of Two- Laning of Existing Khupa – Hayuliang – Hawai Road on EPC basis from (i) design Km. 0.000 (Khupa) to Km. 17.000 [Existing Km 95.800 of (Khupa – Hayuliang Road) to Km 8.970 (Hayuliang – Hawai Road)] (ii) design Km. 17.000 (Khupa) to Km. 34.000 [Existing Km 16.950 to Km 34.310 (Hayuliang – Hawai Road)] (iii) design Km. 34.000 to Km. 51.825 [Existing Km 26.625 to Km 45.050 (Hayuliang – Hawai Road)] (iv) Two-Laning of Hayuliang– Hawai bypass Road on EPC basis from design Km. 51.825 to Km. 63.131 [Existing Km 45.050 of Hayuliang – Hawai road to Hawai Town]” in the state of Arunachal Pradesh Under SARDP-NE.new

  2. Latest Technical Evaluation Score for the project of Consultancy Services for carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of Two Laning with paved shoulder NH configuration from Simaluguri-Bihubar on NH-702C in the State of Assam to Mon on NH 702 in the state of Nagaland on Engineering, Procurement and Construction mode.new

  3. Financial Evaluation Result for the project of Four laning of Dolabari to Jamuguri section from km 17.300 of NH-37A to km 182.000 of NH-52 in the State of Assam under SARDP- NE, Phase A on EPC modenew

  4. Financial Evaluation Result for the project of Rehabilitation and up-gradation of Wokha Merapani Road from Wokha Junction (0/000 km) to (26/000 km) in the State of Nagaland” on Engineering, Procurement & Construction (EPC) Mode.new

  5. Financial Evaluation Result for the project of Rehabilitation and up-gradation of Wokha-Merapani Road from (26/000 km) to (48/000 km) in the State of Nagaland” on Engineering, Procurement & Construction (EPC) Mode. new

  6. Financial Evaluation Result for the project of Rehabilitation and up-gradation of Wokha-Merapani Road from (48/000 km) to Merapani (60/585 km) in the State of Nagaland and Assam” on Engineering, Procurement & Construction (EPC) Mode.new

  7. Technical Evaluation Score for the project of Consultancy Service for Authority’S Engineer for (i) Construction of 1000m length Viaduct at Rangpo between km 51.100 to km 53.900 on Sevoke –Gangtok Road NH-10 (Old NH-31A) in the State of West Bengal/Sikkim. (ii) Construction of up-gradation of existing road to 2-lane with paved shoulder including geometric improvement from km. 0.000 to km. 26.706 in Rhenok-Rorathang-Pakong of NH-717A on EPC basis under SARDP-NE Phase ‘A’ in the State of Sikkim. (iii) Construction/up-gradation of existing road to 2-lane with paved shoulders including geometric improvement of NH-510 from km. 0.000 to km. 32.500 (Singtam-Tarku-Rabongla-Legship-Gyalshing) on EPC basis under SARDP-NE Phase ‘A’ in the State of Sikkim.new

  8. Technical Evaluation Score for the project of Consultancy Services for carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of Two Laning with paved shoulder NH configuration from Simaluguri-Bihubar on NH-702C in the State of Assam to Mon on NH 702 in the state of Nagaland on Engineering, Procurement and Construction mode.

  9. Technical Evaluation Result for the project of Rehabilitation and up-gradation of Wokha-Merapani Road from (48/000 km) to Merapani (60/585 km) in the State of Nagaland and Assam” on Engineering, Procurement & Construction (EPC) Mode.

  10. Technical Evaluation Result for the project of Rehabilitation and up-gradation of Wokha-Merapani Road from (26/000 km) to (48/000 km) in the State of Nagaland” on Engineering, Procurement & Construction (EPC) Mode. >

  11. Technical Evaluation Result for the project of Rehabilitation and up-gradation of Wokha Merapani Road from Wokha Junction (0/000 km) to (26/000 km) in the State of Nagaland” on Engineering, Procurement & Construction (EPC) Mode.

  12. Technical Evaluation Result for the project of Rehabilitation and up-gradation of section from Km 242.0 to 298.0 of NH-223 (New NH- 4) to 2-Lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands on EPC Basis. (Package-II).

  13. Technical Evaluation Result for the project of Two-Laning of Akajan – Likabali – Bame Road on EPC basis from existing Km 71.000 to Km 99.000(design Km. 65.810 to Km. 91.928) in the state of Arunachal Pradesh under SARDP-NE On Engineering, Procurement & Construction (EPC) Mode.

  14. Technical Evaluation Score for the project of Consultancy Services for Carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of (i) 2 laning with paved shoulder of Churachandpur -Tuivai road section (length- 162Km) on NH-102B in the State of Manipur (ii) 2 laning with paved shoulder of Imphal-Jiribam section of NH-37 (NH-53 (length- 220 Km) in the State of Manipur (iii) 2 laning with paved shoulder from Tamenglong in Manipur to Peren in Nagaland via Longdi Pabram (length-100Km)

  15. Technical Evaluation Result for the project of Four laning of Dolabari to Jamuguri section from km 17.300 of NH-37A to km 182.000 of NH-52 in the State of Assam under SARDP- NE, Phase A on EPC mode.

  16. Technical Evaluation Score for the project of Consultancy Services for Carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of Two Laning with paved shoulder NH configuration of Demwe-Brahmkund Section from Km. 0.00 to Km. 19.22 and Arrowa-Khupa-Hayuliang section from Km. 44.02 to Km 80.97, total length for both is 56.17 Km of Demwe-Hawai Road under SARDP-NE on Engineering, Procurement and Construction mode in the state of Arunachal Pradesh. (Retender).

  17. Technical Evaluation Result for the project of Rehabilitation of existing churachandpur- singhat – Tuivai road on NH- 102B between Km 0.000 to Km 34.5 (Length 34.50 Km) in the state of Manipur on EPC Basis (2nd call)

  18. Technical Evaluation Result for the project of Restoration/Reconstruction of Ukhrul-Toloi-Tadubi road section from km 70.00 to Km 90.00 covering 20 Km length on NH-102A in the state of Manipur

  19. Technical Evaluation Result for the project of Restoration/ Reconstruction of Ukhrul-Toloi-Tadubi road section from Km 90.00 to Km 115.00 covering 25 Km length on NH-102A in the state of Manipur.

  20. Technical Evaluation Result for the project of Construction of Extra-dosed/ Cable Stayed RCC Bridge including viaduct and approaches over river Feni at Sabroom on Indo-Bangladesh Border on NH-8 in the state of Tripura on EPC mode.

  21. Technical Evaluation Result for the project of Construction of Four/Six laning from Km 132.375 to Km 158.058 (Total New Alignment length of 20.683 Km) of Daboka- Dimapur Section (Dimapur Bypass) of NH-36 & 39 under SARDP-NE in the state of Nagaland on Engineering Procurement and Construction basis.

  22. Financial Bid Opening Letter for the project of Short Term Improvement & Routine Maintenance of Km 51.00 to Km 93.00 of NH-10 in the State of Sikkim (Including Indra and Northern Bypass) on Percentage Rate basis.

  23. Technical Evaluation Score for the project of Two-Laning of Joram – Koloriang Road (NH-713) on EPC basis from design Km. 20+000 to Km. 32+050 [Existing Km 20.000 to Km 35.150] in the state of Arunachal Pradesh under SARDP-NE” on EPC Mode

  24. Technical Evaluation Score for the project of Two-Laning of Joram – Koloriang Road (NH-713) on EPC basis from design Km. 32+050 to Km. 44+000 [Existing Km 35.150 to Km 50.050] in the state of Arunachal Pradesh under SARDP-NE On Engineering, Procurement & Construction (EPC) Mode

  25. Technical Evaluation Score for the project of Two-Laning of Joram – Koloriang Road (NH-713) on EPC basis from design Km. 44+000 to Km. 59+363 [Existing Km 50.000 to Km 70.000] in the state of Arunachal Pradesh under SARDP-NE On Engineering, Procurement & Construction (EPC) Mode.

  26. Technical Evaluation Score for the project of Two-Laning of Joram – Koloriang Road (NH-713) on EPC basis from existing Km 70.000 to Km 88.700 (design Km. 59+363 to Km. 77+363) in the state of Arunachal Pradesh under SARDP-NE On Engineering, Procurement & Construction (EPC) Mode.

  27. Technical Evaluation Score for the project of Two-Laning of Joram – Koloriang Road (NH-713) on EPC basis from existing Km 88.700 to Km 104.850 (design Km. 77+363 to Km. 92+363) in the state of Arunachal Pradesh under SARDP-NE On Engineering, Procurement & Construction (EPC) Mode.

  28. Technical Evaluation Score for the project of Two-Laning of Joram – Koloriang Road (NH-713) on EPC basis from existing Km 104.850 to Km 122.600 (design Km. 92+363 to Km. 107+363) in the state of Arunachal Pradesh under SARDP-NE On Engineering, Procurement & Construction (EPC) Mode

  29. Technical Evaluation Score for the project of Two-Laning of Joram – Koloriang Road (NH-713) on EPC basis from existing Km 122.600 to Km 138.000 (design Km. 107+363 to Km. 122+353) in the state of Arunachal Pradesh under SARDP-NE On Engineering, Procurement & Construction (EPC) Mode.

  30. Technical Evaluation Score for the project of Construction of two-Lane with paved shoulders of Joram-Koloriang Raod (NH-713) on EPC basis from existing Km 138.00 to Km 158.00 [ Design Km. 122.353 to Km. 138.389] (Design Length – 16.036 KM) int he state of Arunachal Pradesh

  31. Technical Evaluation Score for the project of Consultancy Services for Authority’s Engineer for Supervision of Construction of Four/Six laning from Km 132.375 to Km 158.058 (Total New Alignment length of 20.683 Km) of Daboka Dimapur Section (Dimapur Bypass) of NH-36 & 39 under SARDP-NE in the state of Nagaland on Engineering Procurement and Construction basis.

  32. Technical Evaluation Result for the project of Construction of 2-lane with paved shoulder including geometric improvement from Km 0.00 to Km 16.000 of stretch Singtam – Tarku of NH-510 on EPC basis under SARDP –NE Phase ‘A’ in the state of Sikkim. On Engineering, Procurement & Construction Mode.

  33. Technical Evaluation Result for the project of Construction of 2-lane with paved shoulder including Geometric improvement from Km 16.000 to Km 32.500 of stretch Tarku – Rabangla of NH-510 on EPC basis under SARDP –NE Phase ‘A’ in the State of Sikkim On Engineering, Procurement & Construction Mode.

  34. Final Technical Evaluation Result for the project of Rehabilitation and up-gradation of Doimukh-Harmuti road from Harmuti Junction (0/00 km) to Khula camp (14/370 km) and Doimukh (0/000 km) to Bagh Tinali (3/100 km) two lane carriageway in the State of Assam and Arunachal Pradesh.

  35. Technical Evaluation Result for the project of Rehabilitation and up-gradation of NH-223 from Km 12.0 to 45.0 (Beodnabad -Ferrargunj Section) excluding section between Km 21.0 to Km 28.0,to 2-Lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands on EPC Basis.

  36. Technical Evaluation Result for the project of Construction of Meka-Roing- Hunli from existing km 16 of Roing Hunli Road to km 21.5 of Hunli-Anini Road (total length=74.863 km) to NH double lane specification in Arunachal Pradesh on Engineering Procurement and Construction (EPC) basis.

  37. Technical Evaluation Result for the project of Two-Laning of Existing Khupa – Hayuliang – Hawai Road on EPC basis from design Km. 0.000 (Khupa) to Km. 17.000 [Existing Km 95.800 of (Khupa – Hayuliang Road) to Km 8.970 (Hayuliang – Hawai Road)] in the state of Arunachal Pradesh Under SARDP-NE, Project Highway.

  38. Technical Evaluation Result for the project of Two-Laning of Existing Hayuliang – Hawai Road on EPC basis from design Km. 17.000 (Khupa) to Km. 34.000 [Existing Km 16.950 to Km 34.310 (Hayuliang – Hawai Road)] in the state of Arunachal Pradesh under SARDP-NE, Project Highway.

  39. Technical Evaluation Result for the project of Two-Laning of Existing Hayuliang – Hawai Road on EPC basis from Design Km. 34.000 to Km. 51.825 [Existing Km 26.625 to Km 45.050 (Hayuliang – Hawai Road)] in the state of Arunachal Pradesh Under SARDP-NE, Project Highway.

  40. Technical Evaluation Result for the project of Two-Laning of Hayuliang– Hawai bypass Road on EPC basis from design Km. 51.825 to Km. 63.131 Existing Km 45.050 of Hayuliang – Hawai road to Hawai Town in the state of Arunachal Pradesh Under SARDP-NE.

  41. Technical Evaluation Result for the project of Rehabilitation and up-gradation of Tura-Mankachar road from Mirjumala junction to Mankachar-Silchar Tinali (0/0 to 1/660km) to two lane carriageway in the State of Assam On Engineering, Procurement & Construction (EPC) Mode.

  42. Technical Evaluation Result for the project of Construction and upgradation of existing road to 2-lane with paved shoulder including geometric improvement from Km. 0.00 0to Km. 26.706 in Rhenok-Rorathang-Pakyong of NH-717A on EPC basis under SARDP-NE Phase A in the State of Sikkim (Package –I : Rhenok to Pakyong – 26.706 Kms) On Engineering, Procurement & Construction (EPC) Mode.

  43. Technical Evaluation Result for the project of Short Term Improvement & Routine Maintenance of Imphal-Jiribam Road from Km 145.00 to Km 220.00 (Length=75 Km) of NH-53 (New NH-37) (Package-III) in the state of Manipur.

  44. Technical Evaluation Result for the project of Short Term Improvement & Routine Maintenance of Imphal-Jiribam Road from Km 75.00 to Km 145.00 (Length=70 Km) of NH-53 (New NH-37) (Package-II) in the state of Manipur.

  45. Technical Evaluation Result for the project of Short Term Improvement and Routine maintenance of Imphal- Jiribam Road from Km 3.00 to Km 75.00 (Length 72 km ) of NH-53 (New NH-37) (Package-I) in the state of Manipur

  46. Technical Evaluation Result for the project of Rehabilitation and up-gradation of NH-223 from Km 12.0 to 45.0 (Beodnabad -Ferrargunj Section) excluding section between Km 21.0 to Km 28.0,to 2-Lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands on EPC Basis.

  47. Technical Evaluation Result for the project of Restoration/Reconstruction of Churachandpur to Tuivai(NH- 102B) road from km 103.10 to Km 161.48 (58.38 Km) in the state of Manipur on EPC mode.

  48. Technical Evaluation Result for the project of Construction of Major Bridge over Humphrey Strait Creek between Km. 129.420 to Km. 130.600 of NH-223 (New No. NH-4) connecting Middle & North Andaman Islands in the Union Territory of Andaman & Nicobar Islands on EPC Mode.

  49. Technical Evaluation Result for the project of Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of selected road stretch/corridor to Twolane with paved shoulders NH configuration under BHARATMALA Project and National Highways connectivity to Backward areas/Religious/Tourist places of the country.

  50. Technical Evaluation Score for project of Consultancy Services for Authority’s Engineer for Project of (i) 154 m span Steel Superstructure Bridge at Km 145.09 over River Barak and (ii) 122 m span Steel Superstructure Bridge at Km 189.80 over River Makru on Jiribam-Barak road on NH-53 in Manipur state

  51. Technical Evaluation Result for the project of Rehabilitation and up-gradation of Doimukh-Harmuti road from Harmuti Junction (0/00 km) to Khula camp (14/370 km) and Doimukh (0/000 km) to Bagh Tinali (3/100 km) two lane carriageway in the State of Assam and Arunachal Pradesh.

  52. Final Technical Evaluation Score for the project of Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for upgradation of selected stretches/ corridors to 2-lane with paved shoulder of NH configuration under SARDP-NE project in the State of Meghalaya.

  53. Technical Evaluation Score for the project of Consultancy Services for Preparation of Detailed Project Report for Construction of 2-Lane Bridge for Connectivity of Chatham Island and Bambooflat in the Union Territory region of Andaman Nicobar Islands

  54. Technical Evaluation Score for the project of Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of selected road stretch/corridor to Twolane with paved shoulders NH configuration under BHARATMALA Project and National Highways connectivity to Backward areas/Religious/Tourist places of the country.

  55. Technical Evaluation Result for the Project of Four Laning of NH-37 from Rangagara to Kaliabor Tiniali (Ch 297.000 to Ch 315.315) in Nagaon District in the State of Assam Under SARDP-NE, Phase A (the “Project”) on Engineering, Procurement & Construction (EPC) Mode.

  56. Technical Score for Consultancy Services for Authority’s Engineer for Supervision of Rehabilitation of Churachandpur – Tuivai Road Section (length-161.48 Km) on NH-102B in the state of Manipur on EPC basis.

  57. Modified Technical Evaluation Score for Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for upgradation of selected stretches/ corridors to 2-lane with paved shoulder configuration in the State of Meghalaya.

  58. Final Result of Technical evaulation of the bids received till the last date and time i.e. till 22.11.2016 up to 1500 hours for empanelment of advertising agencies in NHIDCL.

  59. Final Technical Evaluation Score Of CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR PROJECT OF (i) 2 Laning with paved shoulders from Km 6.250 to Km 10.40 of Silchar-Badarpur section of NH-53 (Length = 4.770 Km) on EPC Basis in the state of Assam under SARDP-NE.(ii) Construction of 1000m length Viaduct at Rangpo between Km 51.1 0 to Km 53.90 on Sevoke – Gangtok Road (NH- 31A) in the state of West Bengal/Sikkim.

  60. Modified Technical Score Card Of Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for upgradation of selected stretches/ corridors to 2-lane with paved shoulder configuration in the State of Meghalaya.

  61. Latest Final Evaluation Score of Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for upgradation of selected road stretches/ corridors to Two lane with paved shoulders NH configuration under BHARATMALA Project and National Highways connectivity to Backward areas/Religious/Tourist places of the country in the state of Jammu & Kashmir

  62. Technical Evaluation Result of Selection of agency/ agencies for entering into Annual Rate Contract for providing services of Designing, Printing of document(s) such as Books/ Annual Report(s), Booklets, Flyers, Leaflets, File Covers, Visiting Cards, Invitation Cards (including envelops), Conference ID Cards, etc., for NHIDCL, New Delhi.

  63. Final Technical Evaluation Score of Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for upgradation of selected road stretches/ corridors to Two lane with paved shoulders NH configuration under BHARATMALA Project and National Highways connectivity to Backward areas/Religious/Tourist places of the country in the state of Jammu & Kashmir

  64. Technical Evaluation Result Of Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for upgradation of selected stretches/ corridors to 2-lane with paved shoulder configuration in the State of Meghalaya.

  65. Technical Evaluation Result Of Restoration/Reconstruction of Ukhrul-Toloi-Tadubi road section from Km 0.00 to Km 28.00 covering 28 Km length on NH-102A in the state of Manipur.

  66. Technical Evaluation Result Of Restoration/Reconstruction of Ukhrul-Toloi-Tadubi road section from Km 28.00 to Km 50.00 covering 22 Km length on NH-102A in the state of Manipur.

  67. Technical Evaluation Result Of Restoration/Reconstruction of Ukhrul-Toloi-Tadubi road section from Km 50.00 to Km 70.00 covering 20 Km length on NH-102A in the state of Manipur.

  68. Technical Evaluation Result Of 2-LANING OF EXISTING HUNLI-ANINI ROAD ON EPC BASIS FROM DESIGN KM. 106.200 TO KM. 120.00 (EXISTING KM. 111.60 TO KM. 126.875) IN THE STATE OF ARUNACHAL PRADESH UNDER SARDP-NE.

  69. Technical Evaluation Result Of 2-LANING OF EXISTING HUNLI-ANINI ROAD ON EPC BASIS FROM DESIGN KM 92.500 TO KM.106.200 (EXISTING KM. 97.670 TO KM 111.600) IN THE STATE OF ARUNACHAL PRADESH UNDER SARDP-NE.

  70. Technical evaluation results for Bharatmala project in the state of Jammu and Kashmir. Technical Bid opened on 02.09.2016.

  71. Financial Quote For Restoration / Reconstruction of Chenani – Sudhmahadev -Goha – Khellani road covering Km 0.000 to Km 25.300 of Chenani – Sudhmahadev road and Km 0.000 to Km 30.000 of Khellani – Goha road of NH-244 in the State of J&K.

  72. Technical Evaluation Result for Selection of agency for providing services of Housekeeping Staff and Security Guards in NHIDCL Headquarters, New Delhi.

  73. Final Score for Jammu-Akhnoor section of NH-144A and Chenani-Sudhmahdev-Goha-Khallani-Kishtwar-Sinthan Pass-Khanabal section of NH-244 (old NH-1B) in the state of J&K.

  74. Technical evaluation result for 4 Laning of Kohima Bypass connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) on Engineering, Procurement and Construction (EPC) mode in the state of Nagaland.

  75. Technical Evaluation Result for 2 laning of (i) Maram-Peren-Dimapur section on NH 129A (Manipur & Nagaland) (ii) Pallel-Chandel Section of NH-102C (iii) Sangshak-Nampisha on NH 102 A (A Bharatmala Project) on Engineering, Procurement and Construction mode in the state of Manipur.

  76. Technical Evaluation Score for Two Laning with paved shoulder NH configuration of Demwe-Brahmkund Section from Km. 0.00 to Km. 19.22 and Arrowa-Khupa-Hayuliang section from Km. 44.02 to Km 80.97, total length for both is 56.17 Km of Demwe-Hawai Road under SARDP-NE on Engineering, Procurement and Construction mode in the state of Arunachal Pradesh.

  77. Technical Evaluation Score for Two Laning with paved shoulder NH configuration of (i) Tamenglong-Tousem-Haffong via Lia sang and Tavsem in the state of Assam and Manipur and (ii) Jiribam to Tipaimukh via NH 306A in the state of Manipur on Engineering, Procurement and Construction mode.

  78. Technical Evaluation Result for (i) 4 Laning of Imphal-Moirang Road on NH-150 and (ii) 2 laning with paved shoulder of Ukhrul-Jessami road on NH-202 on Engineering, Procurement and Construction mode in the state of Manipur.

  79. Final evaluation results for selection of Manpower Agency for providing services of office staff Such as Stenographer, Office Assistant, DEO, MTS etc. for working in NHIDCL

  80. Final evaluation results for Bharatmala project, Sikkim

  81. Final evaluation results for Bharatmala project, Uttarakhand.

  82. Technical score for bharatmala projects in the state of Jammu and Kashmir

  83. Technical score for Consultancy Services for Authority Engineer (i) Pasighat to Bomjur Section of NH-52 (ii) Singer River to Sizoh Nallah Section of NH-513 in Arunachal Pradesh.

  84. Opening of Financial Bid for Consultancy Services for Authority Engineer for project of 2 Laning of Akajan – Likabali – Bame road (i) Km 12.00 to 33.00 and (ii) Km 33.00 to Km 65.00 (State Road) in Arunachal Pradesh under SARDP on EPC basis.

  85. Final evaluation results for Bharatmala project, Assam & West Bengal

  86. Final evaluation results for Bharatmala project, Tripura

  87. Final evaluation results for Bharatmala project, Himachal Pradesh